4 floors · 55,216 sq ft · built 1928 · class M1 · owner of record: Rc Church St Teresas
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 55,216 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 179 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 179 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1154 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2034) Likely applies Local Law 87 · Calendar year 2034 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2294). Agency page | Dec 31, 2034 in 2980 days | Next due 2034 |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 13, 2026 | Construction CLASS - 2 REISSUE ECB #35724787Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (ROOF)BULKHEAD/STAIR B WITH SEVERAL CRACKS, HORIZONTAL/VERTICAL OF WALLS THROUGHOUT VARIOUS AREAS. REMEDY: REPAIR AND/OR R #35734777J | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (BASEMENT)MULTIPURPOSE B01 EMERGENCY LIGHTS NOT WORK IN THROU #35734779N | Aug 5, 2026 POP/IN-VIO | $0 |
| Jul 13, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT(2ND FL) HALLWAY, (3RD FL)HALLWAY AND (BASEMENT)MULTIPURPOSE RM B01 ALL CEILINGS INSTALLED/HUNG WITH NONE FIRE RETARDENT DECORATIONS. REMEDY: COMP #35734778L | Aug 5, 2026 POP/IN-VIO | $0 |
| Sep 30, 2025 | Construction CLASS - 2 REISSUE ECB #35684602P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT(ROOF) BULKHEAD/STAIR B WALLS WITH SEVERAL CRACKS. REMEDY: REPAIR AND/OR REPLACE. #35724787Y | Oct 27, 2025 POP/IN-VIO | $0 |
| Jul 23, 2024 | Construction CLASS - 2 REISSUE #35674901X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED STAIR B BULKHEAD HAS RUNNING CRACKS ALONG SEVERAL WALLS. REMEDY: REPAIR AND/OR REPLACE. #35684602P | Dec 3, 2024 POP/IN-VIO | $0 |
| May 25, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE BULKHEAD AT STAIRWELL B HAS RUNNING CRACKS IN SEVERAL AREAS.ALSO,THE CEILINGOF THE STAIRWELL LEADING TO THE BOILER ROOM HAS CRACKS,MISSING MASONRY #35674901X | Sep 19, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #17552 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 13, 2026 | ECB | Construction: REISSUE ECB #35724787Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT (ROOF)BULKHEAD/STAIR B WITH SEVERAL CRACKS, HORIZONTAL/VERTICAL OF WALLS THROUGHOUT VARIOUS AREAS. REMEDY: REPAIR AND/OR R | Open |
| Jul 13, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT (BASEMENT)MULTIPURPOSE B01 EMERGENCY LIGHTS NOT WORK IN THROU | Open |
| Jul 13, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT(2ND FL) HALLWAY, (3RD FL)HALLWAY AND (BASEMENT)MULTIPURPOSE RM B01 ALL CEILINGS INSTALLED/HUNG WITH NONE FIRE RETARDENT DECORATIONS. REMEDY: COMP | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 7:38 PM ET. BBL 4022940026.