3 floors · 14,067 sq ft · built 1900 · class W3 · owner of record: Columbia Grammar School
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (3 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-21 (Accepted). Agency page | Dec 31, 2026 in 50 days | 1 of 3 without an accepted 2026 report yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 14, 2026 | Site Safety CLASS - 1 4 STORY ALT1 RENO ACTIVE SITE.OBSERVED ON 1 FL EXP#1 MAKESHIFT TIMBER/STUD PLATFORM, CONVEYER IN USE WITH PLANKING/MATERIALS/DEBRIS WORKER'S ON TOP W/MASONRY BRICKS LOADS. REQUEST TO CONTRACTOR FOR STAMPED ENGI #39556590X | Sep 17, 2026 DEFAULT | $6,250 |
| Jul 14, 2026 | Construction CLASS - 2 4 STORY INTERIOR RENO ACTIVE SITE AT DEMOLITION PHASE PERMIT#M0140628.OBSERVED EXISTING STRUCTURAL STEEL/TEMP SHORING IN PLACE FROM CELLAR TO 2 FL ALL EXPOSURES.STEEL CONNECTIONS/TEMP SHORING WITH I BEAMS SPLIC #39556589Z | Sep 17, 2026 DEFAULT | $3,125 |
| Jul 1, 2025 | Boilers CLASS - 2 FAILURE TO FILE REQUIRED ANNUAL BOILER INSPECTION REPORTS FOR LOW-PRESSURE BOILER 10000106834Y0001 IN ACCORDANCE WITH THE RULES OF THE DEPARTMENT. 1RCNY 103-01(D)(1) REQUIRES THAT AN ANNUAL INSPECTION REPORT FO #37036021Y | Oct 16, 2025 DEFAULT | $3,125 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 4, 2018 | B | Apt 11B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS IN THE FOYER LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 9, 2018 |
| Sep 4, 2018 | B | Apt 11B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 9, 2018 |
| Sep 4, 2018 | B | Apt 11B · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 9, 2018 |
| Sep 4, 2018 | A | Apt 11B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL IN THE KITCHEN LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 8, 2018 |
| Sep 4, 2018 | A | Apt 11B · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE WEST RADIATOR IN THE KITCHEN LOCATED AT APT 11B, 11th STORY, 3rd APARTMENT FROM SOUTH AT WEST | Dec 8, 2018 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 6:54 PM ET. BBL 1012070023.