17 floors · 63 apartments · 46,600 sq ft · built 1960 · class D6 · owner of record: 7e86 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 46,600 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $167,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2028 in 464 days | No Cycle 10 report on record yet |
| Annual boiler inspection (4 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-06 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #905472. REMEDY: FILE ACCEPTABLE REPORT. #37036769Y | Oct 1, 2026 DEFAULT | $1,280 |
| Mar 20, 2023 | Construction CLASS - 1 FAILURE TO TAKE AND PROVIDE SAFETY MEASURES WHERE REQUIRED SUCH AS SIDEWALK SHED,NETTING ETC.TO PROTECT AND SECURE RESIDENT/PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04.FACADE TECHNICAL REPOR #35670634M | Nov 15, 2023 IN VIOLATION | $0 |
| May 20, 2005 | Local Law Non-Hazardous FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 11 OF 1998 AND THE DEPARTMENT OF BUILDINGS RU #34458539J | Jul 7, 2011 IN VIOLATION | $0 |
| Jun 25, 2004 | Local Law Non-Hazardous FAILURE TO SUBMIT A FIFTH ROUND TECHNICAL REPORT PERIODIC INSPECTION OF EXTERIRO WALLS AND APPURTENANCES AS REQUIRED BY LOCAL LAW 11 OF 1998AND THE DEPARTMENT OF BUILDINGS RULES REGULATIONS.REMEDY:FILE THE REQU #34459478J | Jul 28, 2011 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2023 | HAZARDOUS CONDITION (FACADE) CYCLE 9B UNSAFE REPORT FILED #910945 | DOB VIOLATION - ACTIVE |
| Nov 27, 2020 | ELEVATOR #9028/691305 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 21, 2023 | Facades FISPHAZ CYCLE 9B UNSAFE REPORT FILED | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:34 PM ET. BBL 1014980007.