1 floors · 11,579 sq ft · built 1900 · class E1 · owner of record: Ze 129 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 46 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2026 | Construction CLASS - 2 FOUND OIL FIRED GENERATOR MODEL# D8-13811 ON SITE AND OPERATING WITH OUT A PERMIT., OBTAIN ALL PERMITS; PULL PERMIT #39205192X | Dec 3, 2026 ADMIT/IN-VIO | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 23, 2026 | ECB | Construction: FOUND OIL FIRED GENERATOR MODEL# D8-13811 ON SITE AND OPERATING WITH OUT A PERMIT., OBTAIN ALL PERMITS; PULL PERMIT | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:36 AM ET. BBL 1019690005.