23open violations
$35,600ECB/OATH penalties owed
0HPD class C (immediately hazardous)
63dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 209,951 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 307 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Energy audit and retro-commissioning (2033) Likely applies
Local Law 87 · Calendar year 2033
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 153). Agency page

Dec 31, 2033
in 2620 days
Next due 2033
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $262,500 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: UNSAFE (2025-03-27)

Open violations

ECB / OATH (13) · $35,600 owed
IssuedViolationHearingBalance
Sep 26, 2026Unknown CLASS - 2
AT THE TIME OF MY INSPECTION OBSERVED SITE WITH LOOSE DEBRIS NETTING @ EXP. 3 VERY UNSECURE WITH EXTREME WINDY CONDITIONS. (3314.1) SITE FAILED TO MAINTAIN SUPPORTED SCAFFOLD @ EXP. 3 - SUPPORTED SCAFFOLD STRUC
#39559715Y
Dec 3, 2026
PENDING
$2,500
Sep 8, 2026Construction CLASS - 2
NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 VIOLATION #39157676Z ISSUED 8/19/2025 CITING RUSTED DETERIORATED BEAMS AND VERTICAL CRACKS ON WALLS AND COLUMNS AT VAULT UNDER THE SIDEWALK., FILE A C
#39203252J
Nov 12, 2026
PENDING
$1,250
Jul 22, 2026Unknown CLASS - 2
STOP ALL USE OF MATERIAL HOISTS APPLICATION# M01428831-I1-PMM ATOI, I OBSERVED MATERIAL HOIST MISSING MANUFACTURES IDENTIFICATION TAG MISSING ON MATERIAL HOIST BUCKET ON SITE LOCATED AT EXP#3 IN VIOLATION OF
#39556965N
May 6, 2027
PENDING
$2,500
Jul 22, 2026Unknown CLASS - 1
ATOI, I OBSERVED THE ELECTRICAL BOX ON THE SIDEWALK SHED AT EXP#3 BROKEN AND EXPOSED TO ELEMENTS WHICH CAN CAUSE HAZARDOUS CONDITIONS IN VIOLATION OF EC 110.2(A)
#39556981N
Mar 12, 2027
$1,600
Jul 22, 2026Unknown CLASS - 2
PSWO / FAILURE TO PROVIDE LOAD IMPOSED INSPECTION LETTER FOR SUPPORTED SCAFFOLD INSTALLED ON ROOF OF STRUCTURE IN VIOLATION OF BC 3314.3.4PROVIDE DOCUMENTS
#39556944Y
May 6, 2027
PENDING
$2,500
Jul 22, 2026Unknown CLASS - 2
PSWO/ I OBSERVED COMPONENTS OF SUPP SCAFFOLD NOT TO CODE. WOODEN PLANKS NOT SECURED. RESTING ON METAL PLANKING. PLANKS NOT TIED DOWN BC 3314.5.5 GUARDRAIL SYSTEM NOT ADEQUATELY INSTALLED BC 3314.8 COUPLINGS N
#39556945X
May 6, 2027
$2,500
Jul 22, 2026Unknown CLASS - 2
ATOI, SITE SAFETY LOGS NOT SIGNED SINCE 07/07/26 BY SSM . MISSING LOGS AND NO CLEAR QSP SIGNATURES IN VIOLATION OF 3310.8.4KEEP ALL LOGS SIGNED AND UP TO DATE FILLED OUT PROPERLY
#39556960Y
Oct 1, 2026
IN VIOLATION
$2,500
Jul 14, 2026Construction CLASS - 1
CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #39154856M ISSUED 7/24/2025. OBSERVED VAULT W/RUSTED STEEL BEAMS, VERTICAL AND HORIZONTAL CRACKS IN COLUMNS AND WALLS, MISSING MORTAR & BRICK
#39195973M
Mar 16, 2027
PENDING
$6,250
Jun 17, 2026Unknown CLASS - 2
OBSERVED ELECTRICAL COMPONENTS ASSOCIATED WITH SIDEWALK SHED INSTALLATION NOT ADEQUATELY GROUNDED AND BONDED. TEMPORARY CAUTION TAPE AND CONES WERE UTILIZED TO ISOLATE MULTIPLE SHED POSTS ACCESSIBLE TO THE PUBL
#39555645J
Mar 25, 2027
$2,400
Mar 26, 2026Construction CLASS - 2
SSM ON SITE DID NOT HAVE SITE SAFETY LOGS, SIDEWALK SHED DAILY INSPECTION LOG MISSING. LOAD IMPOSED LETTER MISSING FOR SIDEWALK SHED. DRAWINGS FOR FACADE WORK NOT ON SITE
#39552257Y
Nov 23, 2026
$1,250
Mar 26, 2026Unknown CLASS - 1
ATOI, I OBSERVED UNSAFE EXPOSED ELECTRICAL WIRE SET TO AN EXTENSION USED TO ILLUMINATE THE LIGHTING UNDER THE SIDEWALK SHED VIOLATING EC 110.2(A)
#39552268J
Jan 7, 2027
$1,600
Aug 19, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. OBSERVED CONDITIONS OF THE RUSTED/DETERIORATED STEEL BEAMS AND VERTICAL CRACKS ON THE WALL AND COLUMNS AT THE VAULT UNDER THE SIDEWALK., REPAIR AND/REPLACE
#39157676Z
Nov 17, 2026
PENDING
$6,250
Jul 24, 2025Construction CLASS - 1
ATOI OF THE VAULT I OBSERVED THE FOLLOWING VIOLATING CONDITION: -TWO RUSTED/ DETERIORATED STEEL BEAMS -VERTICAL CRACKS ON THE WALL AND COLUMN, REPAIR AND/REPLACE
#39154856M
Apr 16, 2026
IN VIOLATION
$2,500
DOB (5)
IssuedViolationStatus
Aug 28, 2025CONSTRUCTION
FAILURE TO MAINTAIN.@TIME OF INSPCTN,OBSRVD BLDG W/SIDEWALK VAULT ON READE ST TO BE IN A STATE OF DSRPAIR W/SEVERELY CORRODED&DELAMINATD STEEL BEAMS,CRCKD&SPALLD MSNRY&CNCRTE,&WATER MVMNT.COMPLY W/ COMMISSIONER'S ORDER:DOB #072425FEU10103AK (CONTROL #341590) IMMEDIATELY
#FEU10102AK
DOB VIOLATION - ACTIVE
Jul 28, 2025IMMEDIATE EMERGENCY
BRACE AND SHORE SIDEWALK VAULT WALLS AND CEILINGS ALONG READE STREET APPROXIMATELY 20' LONG BY 5' WIDE VAULT
#19407
DOB VIOLATION - ACTIVE
Jul 24, 2025CONSTRUCTION
ATOI OF THE VAULT I OBSERVED THE FOLLOWING VIOLATING CONDITION: -TWO RUSTED/ DETERIORATED STEEL BEAMS -VERTICAL CRACKS ON THE WALL AND COLUMN
#25-01773
DOB VIOLATION - ACTIVE
Jul 24, 2025CONSTRUCTION
EMERGENCY WORK ORDER.@TIME OF INSPECTION,OBSRVD BLDG WITH SDWLK VAULT ON READE ST TO BE IN A STATE OF DSREPAIR W/SEVERELY CORRODED& DELAMINATD STEEL BEAMS,&CRCKD&SPALLD.OWNR TO ENGAGE NYSPE(W/O DISCIPLINARY ACTION)&DB REG CNTRCTR TO IMMED BRACE&SHORE THE ENT VAULT UNDR NYSPE SPRVSN
#FEU10102AK
DOB VIOLATION - ACTIVE
Jul 24, 2025CONSTRUCTION
FAILURE TO MAINTAIN.@TIME OF INSPCTN,OBSRVD BLDG W/SIDEWALK VAULT ON READE ST TO BE IN A STATE OF DSRPAIR W/SEVERELY CORRODED&DELIMINATD STEEL BEAMS,CRCKD&SPALLS MSNRY&CNCCRTE,&WATER MVMNT.OWNR TO ENGAGE NYSPE&DOB REG CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR PRMTS BY 8/25/25.SGN OFF RPA
#FEU10103AK
DOB VIOLATION - ACTIVE
DOB NOW Safety (10)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Aug 19, 2026AEUHAZ FTC-AEU-HAZ
Active
Apr 22, 2026Structurally Compromised Buildings FTF-SC-INITL
Report due for structurally compromised property
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen
Sep 26, 2026ECBUnknown: AT THE TIME OF MY INSPECTION OBSERVED SITE WITH LOOSE DEBRIS NETTING @ EXP. 3 VERY UNSECURE WITH EXTREME WINDY CONDITIONS. (3314.1) SITE FAILED TO MAINTAIN SUPPORTED SCAFFOLD @ EXP. 3 - SUPPORTED SCAFFOLD STRUCOpen
Sep 8, 2026ECBConstruction: NO ACCESS. NO CERTIFICATE OF CORRECTION ON FILE FOR CLASS 1 VIOLATION #39157676Z ISSUED 8/19/2025 CITING RUSTED DETERIORATED BEAMS AND VERTICAL CRACKS ON WALLS AND COLUMNS AT VAULT UNDER THE SIDEWALK., FILE A COpen
Aug 19, 2026DOB SafetyAEUHAZ: Open
Jul 22, 2026ECBUnknown: STOP ALL USE OF MATERIAL HOISTS APPLICATION# M01428831-I1-PMM ATOI, I OBSERVED MATERIAL HOIST MISSING MANUFACTURES IDENTIFICATION TAG MISSING ON MATERIAL HOIST BUCKET ON SITE LOCATED AT EXP#3 IN VIOLATION OFOpen
Jul 22, 2026ECBUnknown: ATOI, I OBSERVED THE ELECTRICAL BOX ON THE SIDEWALK SHED AT EXP#3 BROKEN AND EXPOSED TO ELEMENTS WHICH CAN CAUSE HAZARDOUS CONDITIONS IN VIOLATION OF EC 110.2(A)Closed
Jul 22, 2026ECBUnknown: PSWO / FAILURE TO PROVIDE LOAD IMPOSED INSPECTION LETTER FOR SUPPORTED SCAFFOLD INSTALLED ON ROOF OF STRUCTURE IN VIOLATION OF BC 3314.3.4PROVIDE DOCUMENTSOpen
Jul 22, 2026ECBUnknown: PSWO/ I OBSERVED COMPONENTS OF SUPP SCAFFOLD NOT TO CODE. WOODEN PLANKS NOT SECURED. RESTING ON METAL PLANKING. PLANKS NOT TIED DOWN BC 3314.5.5 GUARDRAIL SYSTEM NOT ADEQUATELY INSTALLED BC 3314.8 COUPLINGS NClosed
Jul 22, 2026ECBConstruction: I OBSERVED EXTENSION PLATFORM AT EXP#1 & 2 BY 6TH FLOOR INSTALLED AS WELL AS ACCESS STAIRWELL AT EXP#1 OF ROOF NOT REFLECTING OF SUBMITTED DRAWINGS IN VIOLATION OF 28-105.12.2Closed
Jul 22, 2026ECBUnknown: ATOI, SITE SAFETY LOGS NOT SIGNED SINCE 07/07/26 BY SSM . MISSING LOGS AND NO CLEAR QSP SIGNATURES IN VIOLATION OF 3310.8.4KEEP ALL LOGS SIGNED AND UP TO DATE FILLED OUT PROPERLYOpen
Jul 14, 2026ECBConstruction: CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #39154856M ISSUED 7/24/2025. OBSERVED VAULT W/RUSTED STEEL BEAMS, VERTICAL AND HORIZONTAL CRACKS IN COLUMNS AND WALLS, MISSING MORTAR & BRICKOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 12:02 AM ET. BBL 1001537501.

Look up another building