Brooklyn · Block 3799 · Lot 14 · 11207

494 Dumont Avenue

3 floors · 45,000 sq ft · built 1930 · class P5 · owner of record: Start Properties, Llc

9open violations
$2,400ECB/OATH penalties owed
0HPD class C (immediately hazardous)
185dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 45,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 185 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 185 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1160 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-07-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $2,400 owed
IssuedViolationHearingBalance
Sep 3, 2026Construction CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AT THE TIME OF INSPECTION OBSERVED AT EXP #3 WEST ELEVATION MUD SILLS MISSING, SHIFTED, DAMAGED AND ROTTEN AT MULTIPLE LOCATIONS, AS OBSERVED SIDE WALK S
#35730180Z
Nov 18, 2026
PENDING
$2,400
Dec 15, 2021Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT.AT THE TIME OF INSPECTION OBSERVED FACADE IN STATE OF DISREPAIR.LOOSE BRICKS AND LOOSE MASONRY WITH A POTENTIAL TO COLLAPSE AND MISSING SECTION.REMEDY:REPAIR AND/O
#35635948L
Apr 27, 2022
IN VIOLATION
$0
DOB (3)
IssuedViolationStatus
Nov 17, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED CRACKED/SPALLING STUCCO IN MULTIPLE LOCATIONS ON ALL EXPOSURES. REMEDY : REPAIR AND OR REPLACE
#SR30505XN
DOB VIOLATION - ACTIVE
Nov 17, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED CRACKED/SPALLING STUCCO IN MULTIPLE LOCATIONS ON ALL EXPOSURES. REMEDY : REPAIR AND OR REPLACE
#SR30504XN
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#18667
DOB VIOLATION - ACTIVE
DOB NOW Safety (4)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 3, 2026ECBConstruction: PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. AT THE TIME OF INSPECTION OBSERVED AT EXP #3 WEST ELEVATION MUD SILLS MISSING, SHIFTED, DAMAGED AND ROTTEN AT MULTIPLE LOCATIONS, AS OBSERVED SIDE WALK SOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 12:51 PM ET. BBL 3037990014.

Look up another building