9 floors · 57,688 sq ft · built 2019 · class H9 · owner of record: 4923 Ts Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 57,688 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 851 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1164 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 781). Agency page | Dec 31, 2031 in 1894 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 31, 2026 | Unknown CLASS - 2 WHILE WALKING SITE I OBSERVED ALL FIRE EXTINGUISHERS HANGING AROUND PERIMETER OF INSIDE EXTERIOR FENCE AND ON ALL FLOORS OF SITE IN NON WORKING ORDER, MISSING INSPECTION TAGS OR NOT CHARGED WHICH CAN CAUSE SEV #39557371K | Oct 7, 2026 IN VIOLATION | $2,500 |
| May 11, 2026 | Construction CLASS - 1 OBSERVED 6-STORY NEW BUILDING UNDER PARTIAL SWO ISSUED 09/08/2025 UNDER VIOLATION NOS. 39544595R, 39544596Z, 39544593N, 39544594P. WORKERS OBSERVED PERFORMING FRAMING, TILE AND PAINTING WORK CONTRARY TO SWO. IN #39553978Z | Jul 15, 2026 IN VIOLATION | $10,000 |
| Sep 8, 2025 | Construction CLASS - 2 OBSERVED ACTIVE JOBSITE W/ NEEDLE BEAM SYSTEM INSTALLED @ EXPO #2 MISSING 2X10 PLANK ON TOP ALL STEEL BEAMS AND INADEQUATE POST CONNECTION DETAILS. C CLAMPS USED @ ALL BEAMS CONTRARY TO APPROVED PLANS. STOP ALL #39544596Z | Jan 9, 2026 IN VIOLATION | $1,250 |
| Sep 8, 2025 | Construction CLASS - 2 OBSERVED ACTIVE JOBSITE FAIL TO INSTALL RED VANDAL PROOF LIGHT ON SHEDTO IDENTIFY LOCATION OF FIRE HYDRANT, STANDPIPES AND SPRINKLERS CONNECTIONS AT CONSTRUCTION SITES FOR FDNY IN THE EVENT OF AN EMERGENCY. 33 #39544606N | Jan 9, 2026 IN VIOLATION | $1,250 |
| Sep 8, 2025 | Construction CLASS - 2 OBSERVED ACTIVE JOBSITE W/ YODOCKS IN PLACE CREATING PARTIAL STREET CLOSURE. DOT PERMIT REQUIRED. UPON REVIEW OF DOT PERMIT OCCUPANCY OF ROADWAY, PERMIT EXPIRED, 05.11.2025.RENEW DOT PERMIT. #39544607P | Jan 9, 2026 IN VIOLATION | $1,250 |
| Sep 8, 2025 | Unknown CLASS - 2 OBSERVED ACTIVE JOBSITE W/ MULTIPLE UNSAFE CONDITIONS. MATERIAL STORED ALONG UNENCLOSED PERIMETER ON ALL FLOOR, MAKESHIFT ELECTRICAL WIRE CONNECTS, VERTICAL NETTING NOT TORQUED ON SECOND FLR EXPO #1, #4, INADEQ #39544604J | Jan 9, 2026 IN VIOLATION | $2,500 |
| Sep 8, 2025 | Unknown CLASS - 2 OBSERVED ACTIVE JOBSITE W/ ROOF PROTECTION INSTALLED ON ADJOINING PROPERTY ROOF AT EXPO # 2 W/ OUT A PERMIT. PROVIDE AND MAINTAIN PERMIT FOR ADJOINING PROPERTY ROOF PROTECTION. #39544605L | Jan 9, 2026 IN VIOLATION | $1,250 |
| Sep 8, 2025 | Construction CLASS - 2 OBSERVED ACTIVE JOBSITE W/ MULTIPLE UNSAFE OPENINGS ON SUPPORTED SCAFFOLD WORKING PLATFORMS. OSHA PLANKS USED TO ERECT FALL PROTECTION @ STAIRWELL, BICYCLE PLATFORMS W/OUT GUARDS NEXT TO LARGE OPENING @ EXPO #1 #39544593N | Jan 9, 2026 IN VIOLATION | $1,250 |
| Sep 8, 2025 | Unknown CLASS - 2 OBSERVED ACTIVE JOBSITE W/ SIDEWALK SHED INSTALLED NEXT TO TWO ACTIVE DRIVEWAYS ON 50TH ST & 2ND AVE W/OUT DISPLACEMENT PROTECTION OR HIGH VISIBLE MARKINGS. THIS CREATES SHED COLLAPSE HAZARD. STOP ALL VEHICULAR #39544594P | Jan 9, 2026 IN VIOLATION | $2,500 |
| Sep 8, 2025 | Construction CLASS - 1 OBSERVED ACTIVE JOBSITE W/ MAKESHIFT GUARDRAILS ON MULTIPLE FLRS. GUARDRAILS ERECTED W/ 2" FURRING DISLODGED IN MULTIPLE LOCATIONS CREATING SEVERE FALL HAZARDS. FURRING NOT AN BC ACCEPTED MATERIAL FOR GUARDRAIL #39544595R | Jan 9, 2026 IN VIOLATION | $5,000 |
| Sep 8, 2025 | Construction CLASS - 2 OBSERVED ACTIVE JOBSITE W/ TEMPORARY CONSTRUCTION EQUIPMENT IN PLACE. UPON REQUEST FOR 6 MONTH SHED INSPECTION LETTER, SHED DAILY INSPECTION CHECKLIST, CONSTRUCTION FENCE DRAWING NON WAS PROVIDED. ALSO NOTED I #39544603H | Jan 9, 2026 IN VIOLATION | $1,250 |
| May 23, 2025 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION I OBSERVED THAT THERE WERE NO LOGS AND NO LETTERS OF INSTALLATION FOR THE SIDE WALK SHED AND THE PIPE SCAFFOLDING INSTALLED. #39540594R | Aug 6, 2025 IN VIOLATION | $1,250 |
| Feb 25, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION, A KNUCKLE BOOM CRANE WAS ON SITE HOISTING MATERIAL. THE CREW INVOLVED WITH ATTACHING AND DETACHING THE MATERIAL WERE NOT RIGGING CERTIFIED AS REQUIRED. WORKERS WERE ACTIVELY IN THE RIGGIN #39139477R | Sep 10, 2026 IN VIOLATION | $2,500 |
| Feb 25, 2025 | Cranes and Derricks CLASS - 1 AT TIME OF INSPECTION, A KNUCKLE BOOM CRANE WAS ON HOISTING MATERIAL THE CRANE WAS WORKING OUTSIDE OF THE EXEMPTION OF BC 3319.3, THE OPERATOR OF THE CRANE WAS NOT A NYC LICENSED HMO, MEMBERS OF THE RIGGING CRE #39139461M | Sep 10, 2026 IN VIOLATION | $10,000 |
| Feb 25, 2025 | Cranes and Derricks CLASS - 1 AT TIME OF INSPECTION, KNUCKLE BOOM OPERATOR COULD NOT PROVIDE NYC DOB HMO LICENSE & HAD HIS OUTRIGGERS DEPLOYED ON THE SIDEWALK WITHOUT DRAWINGS FROM PE OR MASTER RIGGER, DISCONTINUE USE #39139476P | Sep 10, 2026 IN VIOLATION | $10,000 |
| Feb 25, 2025 | Unknown CLASS - 1 AT TIME OF INSPECTION, SUPERINTENDENT FAILED TO IMMEDIATELY NOTIFY DEPARTMENT OF THE CONDITIONS THAT THE CRANE OPERATOR WAS OPERATING ARTICULATING BOOM CRANE WITHOUT A LICENSE. IT IS THE SUPERINTENDENT'S REQUIR #39139462Y | Sep 10, 2026 IN VIOLATION | $2,500 |
| Aug 30, 2024 | Construction CLASS - 1 FAILURE TO OBTAIN PE EVALUATION FOR NEIGHBORING STRUCTURES TO SUPPORT CONCRETE LOADS. AS NOTED AT TIME OF MY INSPECTION AT AN ACTIVE CONSTRUCTION SITE 6 STORY NEW BUILDING OBSERVED AT EXPOSURE #2, #4 AT 1ST AND #35684064R | Sep 16, 2025 IN VIOLATION | $0 |
| Jul 22, 2024 | Site Safety CLASS - 1 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE. UPON ARRIVAL OF A SAFETY COMPLIANCE INSPECTION IT WAS OBSERVED THAT THE SUPERINTENDANT IS NOT ON SITE DURING CONSTRUCTION OPERATIONS. REMEDY: PERFO #39530684L | Mar 13, 2026 IN VIOLATION | $10,000 |
| Jul 22, 2024 | Unknown CLASS - 1 FAILED TO PROVIDE/MAINTAIN THE REQUIRED DOCUMENTS UPON ARRIVAL OF A SAFETY COMPLIANCE INSPECTION IT WAS OBSERVED THAT THE SUPERINTENDANT FAILED TO PROVIDE UPDATED DOCUMENTATION THAT PERTAINS TO THE SAFETY LOG, #39530685N | Mar 13, 2026 IN VIOLATION | $5,000 |
| Issued | Violation | Status |
|---|---|---|
| Dec 11, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00489 | DOB VIOLATION - ACTIVE |
| Oct 30, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00087 | DOB VIOLATION - ACTIVE |
| Oct 23, 2024 | CONSTRUCTION #24-02797 | DOB VIOLATION - ACTIVE |
| Oct 16, 2024 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00085 | DOB VIOLATION - ACTIVE |
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) #00188 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #01110 | DOB VIOLATION - ACTIVE |
| Aug 21, 2022 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2021 #10295 | DOB VIOLATION - ACTIVE |
| May 12, 2020 | CONSTRUCTION THE BOROOUGH COMM. HAS ORDERED ALL WORK STOPPED UNDER PERMIT #321183303 ON 5/12/20 DUE TO CONST SUPERINTENDENT WITHDRAWAL STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMM. OFFICE AT 718 802-3677 #0706HP | DOB VIOLATION - ACTIVE |
| May 12, 2020 | CONSTRUCTION STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMMISSIONER'S OFFICE AT 718 802-3677 #0705HP | DOB VIOLATION - ACTIVE |
| May 12, 2020 | CONSTRUCTION THE BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT#340594100 ON 5/12/20 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL./STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMM. OFFICE AT 718 802-3677 #0704HP | DOB VIOLATION - ACTIVE |
| May 12, 2020 | CONSTRUCTION THE BOROUGH COMM. HAS ORDERED ALL WORK STOPPED UNDER PERMIT #340594100 ON 5/12/20 DUE TO CONSTRUCTION SUPERINTENDENT WITHDRAWAL/STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE CONTACT THE BOROUGH COMMISSIONER OFFICE AT718 802-3677 #0703HP | DOB VIOLATION - ACTIVE |
| Feb 19, 2019 | CONSTRUCTION #0703GB | DOB VIOLATION - ACTIVE |
| Feb 19, 2019 | CONSTRUCTION #0704GB | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Dec 11, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 30, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 16, 2024 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Aug 21, 2022 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 31, 2026 | ECB | Unknown: WHILE WALKING SITE I OBSERVED ALL FIRE EXTINGUISHERS HANGING AROUND PERIMETER OF INSIDE EXTERIOR FENCE AND ON ALL FLOORS OF SITE IN NON WORKING ORDER, MISSING INSPECTION TAGS OR NOT CHARGED WHICH CAN CAUSE SEV | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 1:28 PM ET. BBL 3007810001.