51 apartments · 65,564 sq ft · built 2025 · class D7 · owner of record: Sunlight Holding Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 65,564 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 783). Agency page | Dec 31, 2033 in 2624 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 27, 2026 | Construction CLASS - 2 BC 3301.1.3 AT INSPECTION, NO ACTIVE CONSTRUCTION WORK WAS OBSERVED. JERSEY BARRIERS WERE NOT INTERLOCKED OR WATER-FILLED / SEND AND CREATING A HAZARD TO THE PUBLIC AND PROPERTY DUE TO POTENTIAL MOVEMENT INTO #39559789R | Dec 2, 2026 PENDING | $1,250 |
| Jul 1, 2026 | Construction CLASS - 1 AT TIME OF INSPECTION OBSERVED AT FIRST FLOOR LARGE ACCUMULATION OF COMBUSTIBLE DEBRIS APPROXIMATELY 7FT HEIGHT. THIS CREATES FIRE HAZARD. STOP ALL WORK ENTIRE SITE ONLY ALLOW TO MAINTAIN HOUSEKEEPING. #39556091L | Sep 9, 2026 DEFAULT | $2,530 |
| Jul 1, 2026 | Unknown CLASS - 2 BC3314.1 AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP# 3 NOT MAINTAINED AS PER CODE SUPPORTED SCAFFOLD NOT FULLY PLANK LOSES NOT TIE DOWN BICYCLES MISSING LOCKING PINS. MISSING NETTING. #39556092N | Sep 9, 2026 DEFAULT | $2,530 |
| Feb 26, 2026 | Construction CLASS - 1 OBSERVED WORKERS WORKING ON THE PIPE SCAFFOLD AT EXPOSURE 2 DIRECTLY ABOVE DEMOLITION OPERATIONS LOCATED AT 4917 4 AVE. UPON REQUEST FOR THE WORKERS' TRAINING CARDS, NONE WERE PROVIDED SINCE THE WORKERS AND SUP #39550999Y | Dec 4, 2026 PENDING | $2,400 |
| Feb 26, 2026 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. 9-STORY BUILDING UNDER A PARTIAL STOP WORK ORDER ISSUED ON 01/12/2026 REFERENCE COMPLIANT 3A39928 BY THE BOROUGH COMMISSIONER FOR PERMIT B00750328 #39551179N | Dec 4, 2026 PENDING | $10,000 |
| Feb 26, 2026 | Construction CLASS - 1 OBSERVED FIRST FLOOR WITH COMBUSTIBLE & CONSTRUCTION MATERIALS & DEBRIS SCATTERED@MULTIPLE LOCATIONS WITH SNOW &ICE NOT CONTAINED OR STORED ON DESIGNATED CONTAINERS TO BE REMOVED, SAME CONDITION OBSERVED @MULTI #39551001X | Dec 4, 2026 PENDING | $2,500 |
| Feb 26, 2026 | Construction CLASS - 1 OBSERVED A 9-STORY BUILDING, W/ NEEDLE BEAMS INSTALLED CONTRARY TO PLANS ON FLOORS 3/5 &7, MULTIPLE MAKESHIFT STEEL ANGLES & CONNECTIONS, NONCONFORMING SPAN/LENGTH DIMENSIONS. INSTALLATION DEVIATED FROM PE DESI #39550997K | Dec 4, 2026 PENDING | $2,500 |
| Feb 26, 2026 | Construction CLASS - 2 OBS WORKERS WORKING ON NON-CONFORMING SCAFFOLD @EXPO 2 WORKING DIRECTLY ABOVE WORKERS WERE PERFORMING DEMOLITION OPS@4917 4 AVE,W/OUT ANY SAFETY PROTOCOLS TO MONITOR MULTIPLE OPERATIONS ADJ TO EACH SITE.SSPLAN #39550996Z | Dec 4, 2026 PENDING | $5,000 |
| Nov 17, 2025 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED LARGE AMOUNT CONSTRUCTION DEBRIS, GARBAGE AND COMBUSTIBLE MATERIALS AT VARIOUS LOCATIONS APPROXIMATELY 7 FEET IN HEIGHT, FAILURE TO PROVIDE AND #39547060Y | Jan 25, 2027 DEFAULT | $12,500 |
| Nov 17, 2025 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED NEEDLE BEAMS AT EXPOSURE #2 AND3 AT THE 4 AND 5 FLOOR, UPON REVIEW OF THE SITE SAFETY PLAN LOCATION OF NEEDLE BEAMS WAS NOT ON IT. FAILURE TO C #39547061X | Jan 25, 2027 DEFAULT | $12,500 |
| Nov 17, 2025 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED ON THE 2ND FLOOR A SET BACK WITH MATERIALS STORING ON IT AND THERE WERE NO CONTROL ACCESS TO PREVENT UNAUTHORIZED WORKERS TO ENTER THIS AREA, #39547063J | Jan 25, 2027 DEFAULT | $10,000 |
| Nov 17, 2025 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 9 STORY NEW BUILDING, I OBSERVED GUARDRAILS AT VARIOUS FLOORS WERE MISSING MID RAILS AND TOE BOARD. FAILURE TO PROVIDE AND MAINTAIN ADEQUATE GUARDRAILS CREATES A HAZARD FOR WOR #39547062H | Jan 25, 2027 DEFAULT | $25,000 |
| Aug 22, 2025 | Unknown CLASS - 1 AT THE TIME OF MY INSPECTION, 9 STORY BUILDING APPROXIMATELY 85 FEET IN HEIGHT. ACTIVE JOBSITE UPON REQUEST FOR HYDROSTATIC TEST FOR STANDPIPE TO VERIFY COMPLIANCE WITH CODE AND FIRE SAFETY NONE WAS PROVIDED. F #39543980Z | Dec 14, 2026 DEFAULT | $10,000 |
| Aug 19, 2025 | Unknown CLASS - 2 AT THE TIME OF INSPECTION ACTIVE SITE, I OBSERVED CONCRETE OPERATIONS AT EXPOSURE#1,4 WITH CONCRETE PUMP AND TRUCK PARKED ADJACENT TO SIDEWALK SHED OPEN TO PUBLIC WAS NOT PROVIDED WITH MESH SCREEN, 4FT WOOD BA #39543855J | Dec 14, 2026 DEFAULT | $10,000 |
| Aug 19, 2025 | Unknown CLASS - 2 AT THE TIME OF INSPECTION, I OBSERVED CONCRETE OPERATIONS IN PROGRESS ALONG WITH STREET AND SIDEWALK CLOSURE AT EXPOSURE#1,4 WITH CONCRETE TRUCK AND PUMP OBSTRUCTING STREET UPON REQUEST FOR D.O.T PERMIT FOR CON #39543860Y | Dec 14, 2026 DEFAULT | $10,000 |
| Aug 19, 2025 | Unknown CLASS - 1 AT THE TIME OF INSPECTION ACTIVE SITE I OBSERVED BUILDING AT THE 9TH FLOOR LEVEL APPROXIMATELY 85FT IN HEIGHT NOT PROVIDED WITH AN ELEVATOR IN READINESS, FAILURE TO PROVIDED ELEVATOR IN READINESS CREATES A HAZA #39543856L | Dec 14, 2026 DEFAULT | $10,000 |
| Aug 19, 2025 | Unknown CLASS - 1 AT THE TIME OF INSPECTION ACTIVE JOBSITE, I OBSERVED BUILDING AT THE 9TH FLOOR LEVEL ABOVE 75 FEET IN HEIGHT WAS NOT PROVIDED WITH HORIZONTAL SAFETY NETTING SYSTEM, AT THE 6 FLOOR LEVEL BELOW WORKING DECK TO CA #39543857N | Dec 14, 2026 DEFAULT | $10,000 |
| Jul 19, 2025 | Unknown CLASS - 2 PROPOSED 9 STORIES NB WITH A BUILDING FOOTPRINT (SQ. FT.) 17235, WALK JOBSITE PERIMETERS, KNOCK & CALLED OUT, I OBSERVED NO COMPETENT WATCH PERSONNEL AS PER BC 3303.7.7.6 A WATCHPERSON REQUIREMENTS OF SECTION 3 #39542585Y | Sep 24, 2025 IN VIOLATION | $2,500 |
| Jul 2, 2025 | Unknown CLASS - 2 3301.6 MANUFACTURER SPECIFICATIONS, DESIGN, AND CAPACITY. OBSERVED 9 STORY NB WITH SHORING INSTALLED THROUGHOUT JOBSITE. UPON REVIEW OF MANUFACTURE SPECIFICATION AND DESIGNED PLANS PROVIDED ONSITE, DIAGONAL SHO #39541938X | Oct 15, 2025 DEFAULT | $10,000 |
| Jul 2, 2025 | Unknown CLASS - 2 OBSERVED ACTIVE JOBSITE ON 4TH FL WORKING DECK WITH INSTALLATION OF SINGLE PHASED WALL FORMS @ EXPO 3 ADJACENT PROPERTY. ADJACENT PROPERTY WINDOW NOT PROTECTED WITHIN 20 FEET FROM CONSTRUCTION OPERATIONS AS PER #39541939H | Dec 14, 2026 DEFAULT | $12,500 |
| Jun 7, 2025 | Construction CLASS - 2 OBSERVED YODOKS INSTALLED AT EXPO#1 #4 OF THE SITE, CONTRARY TO MANUFACTURING SPECIFICATIONS. MIX MATCH COMPONENTS IN USE PREVENTING ALL YODOKS FROM INTERLOCKING TOGETHER, ALSO NOT FILLED WITH WATER AS PER SPEC #39541192Z | Sep 10, 2025 DEFAULT | $6,250 |
| Jun 7, 2025 | Unknown CLASS - 2 OBSERVED YODOKS INSTALLED AT EXPO#1 AND #4 OF THE SITE, CONTRARY TO MANUFACTURING SPECIFICATIONS. UPON CHECKING DEPARTMENT RECORDS, OBSERVED NO DOT PERMIT WAS ISSUED FOR THIS SITE TO HAVE YODOKS OCCUPYING THE R #39541193K | Sep 10, 2025 DEFAULT | $10,000 |
| May 15, 2025 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF ACTIVE JOB SITE OBSERVED FOUNDATION WORK IN PROCESS/SUPPORT OF EXCAVATION(APROX. 10-12 FEET DEEP-UPON CHECKING DEPARTMENTS RECORDS -NO NOTIFICATION TO DEPARTMENT MADE PRIOR TO CO #39540227P | Nov 17, 2026 PENDING | $12,500 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Aug 5, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 27, 2026 | ECB | Construction: BC 3301.1.3 AT INSPECTION, NO ACTIVE CONSTRUCTION WORK WAS OBSERVED. JERSEY BARRIERS WERE NOT INTERLOCKED OR WATER-FILLED / SEND AND CREATING A HAZARD TO THE PUBLIC AND PROPERTY DUE TO POTENTIAL MOVEMENT INTO | Open |
| Aug 5, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 1, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED AT FIRST FLOOR LARGE ACCUMULATION OF COMBUSTIBLE DEBRIS APPROXIMATELY 7FT HEIGHT. THIS CREATES FIRE HAZARD. STOP ALL WORK ENTIRE SITE ONLY ALLOW TO MAINTAIN HOUSEKEEPING. | Open |
| Jul 1, 2026 | ECB | Unknown: BC3314.1 AT TIME OF INSPECTION OBSERVED SUPPORTED SCAFFOLD INSTALLED AT EXP# 3 NOT MAINTAINED AS PER CODE SUPPORTED SCAFFOLD NOT FULLY PLANK LOSES NOT TIE DOWN BICYCLES MISSING LOCKING PINS. MISSING NETTING. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 8:05 AM ET. BBL 3007830080.