Brooklyn · Block 5639 · Lot 10 · 11219

4902 Ft Hamilton Parkway

3 floors · 2 apartments · 3,000 sq ft · built 1930 · class S9 · owner of record: Ibrahim, Helen/Tr

6open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
429dto Gas piping inspection (2027 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 64 days
Keep the report on file (not filed with DOB)
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 308 days
Required only if the owner doesn't live there
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 429 days
Next cycle year 2027
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-20 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (6) · C 0 · B 5 · A 1
IssuedClassViolationCorrect by
Dec 29, 2010BApt 3FL · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 3FL, 3rd STORYFeb 2, 2011
Mar 21, 2008ASECTION 27-2047 ADM CODE PROVIDE AND MAINTAIN APPROVED MAIL RECEPTACLES AND DIRECTORIES FOR THE PERSONS RESIDING IN THE DWELLING AS PROVIDED IN THE U.S. POSTAL REGULATIONS., 1st STORYJun 24, 2008
Mar 21, 2008BApt 2 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 25, 2008
Mar 21, 2008BApt 2 · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 25, 2008
Mar 21, 2008BApt 2 · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 25, 2008
Mar 21, 2008BApt 2 · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHApr 25, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:46 AM ET. BBL 3056390010.

Look up another building