1 floors · 6,000 sq ft · built 1970 · class G1 · owner of record: Bracci Holding Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 425 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 31, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. FOR WORK WITHOUT A PERMIT FOR VIO#39147616H NO PERMIT ON FILE AS OF 3/31/2026., COMPLY WITH COMMISSIONER'S ORDER #39182530K | Apr 26, 2027 DEFAULT | $2,530 |
| Mar 31, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39147617J AS OF 3/31/2026., FILE A CERTIFICATE #39182545N | Apr 26, 2027 DEFAULT | $1,280 |
| Mar 31, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#35593495P AS OF 3/31/2026., FILE A CERTIFICATE #39182533X | Apr 26, 2027 DEFAULT | $1,280 |
| Mar 31, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#35668341X AS OF 3/31/2026., FILE A CERTIFICATE #39182542H | Apr 26, 2027 DEFAULT | $1,280 |
| May 13, 2025 | Unknown CLASS - 2 I OBSERVED MOUNTED OUTSIDE THE BUILDING TWO NEW ILLUMINATED SIGNS (XXL EVENT SPACE). I ALSO OBSERVED INSIDE THE BUILDING BRAND NEW BRANCH WIRING, BRAND NEW LED LAY IN AND RECESSED LIGHTING. NO APPLICATION ON FI #39147897N | Jul 23, 2025 DEFAULT | $4,000 |
| May 9, 2025 | Construction CLASS - 1 SUMMONS ISSUED FOR FAILURE TO MAINTAIN DUE TO FAULTY WIRING AT 2 SEPARATE ELECTRICAL PANEL BOXES WITHIN THE COMMERCIAL SPACE, REPAIR AND/REPLACE #39147617J | Jul 27, 2026 DEFAULT | $12,500 |
| May 9, 2025 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY(TOTAL OBSTRUCTION FOR EXIT PASSAGEWAY). PERMITS CONVERTED INTO PUBLIC ASSEMBLY WITH FAULTY AND UNMARKED EXIT DOORS THROUGHOUT AS WELL AS A DOUBLE DOOR WITH LOCKIN #35668341X | Jul 27, 2026 DEFAULT | $6,250 |
| May 9, 2025 | Construction CLASS - 1 SUMMONS ISSUED FOR WORK WITHOUT A PERMIT FOR THE INSTALLATION OF FULL HEIGHT PARTITION WALLS, ELECTRIC PANEL BREAKERS, OUTLETS AND SWITCHES ALONG WITH PLUMBING TO CREATE MULTIPLE BATHROOMS THROUGHOUT COMMERCIAL #39147616H | Jul 27, 2026 DEFAULT | $12,500 |
| May 9, 2025 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY. C OF O#204303 DATED 8/14/10 INDICATES PREMISES IS AIUG. 16 VEHICLE REPAIR SHOP WITH AND OCCUPANCY OF 14 PERSONS NOW ALETERED FOR OCCUPANT AS A PUB #35668337N | Jul 27, 2026 DEFAULT | $25,000 |
| Mar 3, 2023 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY.NOTED:PREMISES IS A ONE STORY COMM.SPACE D.B.A. LOTUS LOUNGE WHICH IS CONTRARY TO COFO#204303 DATED AUG 14,1970 STATING PREMISES TO BE A USE GR #35593495P | Sep 25, 2023 IN VIOLATION | $2,500 |
| Mar 3, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED:PREMISESIS A 1 STORY COMM SPACE IN WHICH SECTIONS OF CEILING(S) CONNECTED SPACE HAVING LOOSE SHEETING,REELING OFF EXPOSING FIRE-STOPPING AT VARIOUS #35593496R | Sep 25, 2023 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 24, 2009 | CONSTRUCTION #1701MM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 17) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 3:32 PM ET. BBL 3047860080.