Brooklyn · Block 4815 · Lot 20 · 11203

490 Fenimore Street

3 floors · 27,000 sq ft · built 1974 · class W1 · owner of record: Nyc Department Of Education

18open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
67dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 67 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 27,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-31 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (9)
IssuedViolationHearingBalance
Jul 2, 2026Construction CLASS - 2
REISSUE ECB#35719914L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT WATER DAMAGE/PENETRATION FOUNDATION WALL THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE.
#35734614P
Aug 5, 2026
POP/IN-VIO
$0
Jul 2, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL MULTI ROOM EMERGENCY LIGHTS NOT WORKING WHEN TESTED THROUGHO
#35734615R
Aug 5, 2026
POP/IN-VIO
$0
Jul 2, 2026Construction CLASS - 2
REISSUE ECB#35719915N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 3RD FL SMOKE DOORS RM 303 2ND FL STAIR B.SMOKE DOORS RM203 1ST FL STAIR B ALL DOORS ARE IN DISREPAIR/RACKED.REM:REPAIR AND/OR
#35734613N
Aug 5, 2026
POP/IN-VIO
$0
May 15, 2025Construction CLASS - 2
REISSUE #35677289M DATE OF ISSUE: 06-12-2024. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER AT THE TIME OF INSPECTION OBSERVED AND NOTED AT CELLAR LEVEL SIGNS OF WATER PENETRATION THROUGH FOUNDATION WAL
#35719914L
Jul 8, 2025
POP/IN-VIO
$0
May 15, 2025Construction CLASS - 2
EXIT DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION. AT THE TIME OF INSPECTION I OBSERVED AND NOTED AT 3RD FLOOR EXIT-2 ONE EXIT DOOR, AT STAIRWAY "B" ONE EXIT DOOR, AT STAIRWAY "A" NEAR(RM 302) ONE E
#35719915N
Jul 8, 2025
POP/IN-VIO
$0
Jun 12, 2024Construction CLASS - 2
REISSUED ECB #35675037R. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT CELLAR LEVEL SIGNS OF WATER PENETRATION THROUGH FOUNDATION WALL IN THE ELECTRIC RM, AND GAS METE
#35677289M
Aug 16, 2024
POP/IN-VIO
$0
Apr 18, 2023Construction CLASS - 2
REISSUE #35657999Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT CELLAR LEVEL FOUNDATION WALL HAS BECOME POROUS ALLOWING RAIN WATER INTO ELECTRICAL & BOILER RM.REMEDY:MAKE NECESSARY REPAIRS.
#35675037R
Jul 5, 2023
POP/IN-VIO
$0
Jun 7, 2022Construction CLASS - 2
REISSUE#35578119X(6/11/21) FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER:AT BASEMENT LEVEL ELECTRIC METER ROOM/BOILER ROOM WATER INFILTRATION THROUGH FOUNDATION WALLS ELECTRICAL CONDUITS SHOW SIGN OF RU
#35657999Z
Nov 2, 2022
POP/IN-VIO
$0
Jun 11, 2021Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTED: AT(BASEMENT)ELECTRIC METER ROOM & BOILER ROOM WATER PENETRATION/DAMAGE FROM FOUNDATION WALL AT ELECTRICAL MAM/SWITCH WALL & DETERIORATED/ROTTED PIPE IN
#35578119X
Nov 17, 2021
POP/IN-VIO
$0
DOB (2)
IssuedViolationStatus
Feb 28, 1997CONSTRUCTION

#09SC01
VIOLATION UNSERVED ECB-ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#23839
DOB VIOLATION - ACTIVE
DOB NOW Safety (7)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 2, 2026ECBConstruction: REISSUE ECB#35719914L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT WATER DAMAGE/PENETRATION FOUNDATION WALL THROUGHOUT VARIOUS AREAS.REM:REPAIR AND/OR REPLACE.Open
Jul 2, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:AT 1ST FL MULTI ROOM EMERGENCY LIGHTS NOT WORKING WHEN TESTED THROUGHOOpen
Jul 2, 2026ECBConstruction: REISSUE ECB#35719915N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 3RD FL SMOKE DOORS RM 303 2ND FL STAIR B.SMOKE DOORS RM203 1ST FL STAIR B ALL DOORS ARE IN DISREPAIR/RACKED.REM:REPAIR AND/OROpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 12:44 AM ET. BBL 3048150020.

Look up another building