Bronx · Block 2296 · Lot 52 · 10454

49 Bruckner Boulevard

4 floors · 2 apartments · 5,120 sq ft · built 1915 · class S9 · owner of record: 49 Bruckner Lofts Llc

7open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
65dto Annual boiler inspection (1 boiler)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-02-01 (Accepted). Agency page

Dec 31, 2026
in 65 days
1 of 1 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 309 days
Required only if the owner doesn't live there
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 796 days
Next cycle year 2028

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Jul 16, 2025Construction CLASS - 1
WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, THERE IS ONGOING CONSTRUCTION TO BUILDING A ROOF DECK ON AN EXISTING BUILDING, WITH NO PERMITS FILED ON DOB NOW OR BIS., OBTAIN PERMIT
#39153801K
Jan 9, 2026
ADMIT/IN-VIO
$0
DOB (3)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05579
DOB VIOLATION - ACTIVE
Jul 16, 2025CONSTRUCTION
REQUESTING AN ENGINEER REPORT DUE TO ADDING WEIGHT TO THE ROOF WITH PLANS FROM AN ENGINEER. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE STRUCTURAL STABILITY THE PROPERTY HAS SUSTAINED.
#25-01654
DOB VIOLATION - ACTIVE
May 7, 1990UNSAFE BUILDINGS

#15
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 27, 2026, 11:36 AM ET. BBL 2022960052.

Look up another building