5 floors · 17,250 sq ft · built 1900 · class K4 · owner of record: 49 Broadway
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 19, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION, THE FACADE APPEARED REPAIRED UNDER PERMITTED JOB FILING #M00992566-I1-GC-CX, ISSUED 9/5/2024. HOWEVER, CLASS 1 VIOLATION #39091338R REMAINS OPEN DUE TO FAILURE TO SUBMIT THE REQUIRED #39201052X | Oct 29, 2026 PENDING | $1,250 |
| Aug 19, 2026 | Construction CLASS - 1 AGGRAVATED CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #37025468R ISSUED 10/11/2023 FOR FAILURE TO COMPLY WITH COMMISSIONER'S ORDER VIO23-02184. RESPONDENT WAS REQUIRED TO SUBMIT AN ENG #39201051Y | Oct 29, 2026 PENDING | $6,250 |
| Oct 11, 2023 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-02184, DATED 7/29/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/20 #37025468R | Oct 3, 2024 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jul 31, 2023 | IMMEDIATE EMERGENCY PROVIDE APPROPRIATELY 35 LINEAR FEET OF SIDEWALK SHED ON EXPOSURE 1 ALONG TRINITY PLACE TO SAFEGUARD THE PUBLIC AND PROPERTY #17778 | DOB VIOLATION - ACTIVE |
| Jul 29, 2023 | CONSTRUCTION OBSERVED FRONT EXTERIOR WALL INSTATE OF DISREPAIR CONDITIONS WITH VERTICAL AND STEP CRACKS THROUGHOUT. STONE LINTELS AND SILLS ARE SPALLING, MISSING & FALLING A PARTS. SOME CRACKS ARE MORE THAN 1" WIDER ON 2ND FLOOR F. E. BALCONY. ALSO OBSERVED CRACKS, DETERIORATION & MISSING MASONRY ON CELLAR LEVEL #23-02184 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #09498 | DOB VIOLATION - ACTIVE |
| Mar 6, 2009 | CONSTRUCTION #0101AW | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 19, 2026 | ECB | Construction: AT THE TIME OF INSPECTION, THE FACADE APPEARED REPAIRED UNDER PERMITTED JOB FILING #M00992566-I1-GC-CX, ISSUED 9/5/2024. HOWEVER, CLASS 1 VIOLATION #39091338R REMAINS OPEN DUE TO FAILURE TO SUBMIT THE REQUIRED | Open |
| Aug 19, 2026 | ECB | Construction: AGGRAVATED CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #37025468R ISSUED 10/11/2023 FOR FAILURE TO COMPLY WITH COMMISSIONER'S ORDER VIO23-02184. RESPONDENT WAS REQUIRED TO SUBMIT AN ENG | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 7:03 AM ET. BBL 1000200013.