6 floors · 120 apartments · 98,300 sq ft · built 1949 · class D1 · owner of record: Beach Haven Group Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 98,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1158 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 7232). Agency page | Dec 31, 2032 in 2254 days | Next due 2032 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-16 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #914124. AGG1: PRIOR NOV 3702305 #37034485N | Jun 25, 2025 DEFAULT | $10,000 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #913900. REMEDY: SUBMIT ACCEPTAB #37034891Z | Jul 16, 2025 DEFAULT | $10,000 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL&APPURTENANCES REQUIRED BY28-302.4 FOR CONTROL#814124.AGG1:PRIOR NOV37018186N UNDER28-302.4 SUB #37023058P | Apr 19, 2023 IN VIOLATION | $3,125 |
| Oct 19, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #813900.AGG1:PRIOR NOV 37018185L UNDER 28-30 #37023195L | Apr 19, 2023 IN VIOLATION | $3,125 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#814124. REMEDY:SUBMIT ACCEPTABLE REQUIR #37018186N | Jul 22, 2020 IN VIOLATION | $1,250 |
| Feb 13, 2020 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#813900. REMEDY:SUBMIT ACCEPTABLE REQUIR #37018185L | Jul 22, 2020 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01022 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01007 | DOB VIOLATION - ACTIVE |
| Jul 1, 2022 | ELEVATOR CEASE USE FOR WATER DAMAGE #2974H310235 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jan 13, 2025 | C | Apt 6D · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 1st APARTMENT FROM WEST AT NORTH | Jan 12, 2025 |
| Jan 25, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT COMPACTOR ROOM AT BASEMENT AT PUBLIC HALL | Feb 8, 2023 |
| Jan 25, 2023 | C | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT METER ROOM AT BASEMENT AT PUBLIC HALL | Feb 8, 2023 |
| Jul 11, 2022 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND ALL WALLS IN THE BATHROOM LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Jul 11, 2022 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Jul 11, 2022 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE PRIVATE HALLWAY LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Jul 11, 2022 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Jul 11, 2022 | B | Apt 3C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Jul 11, 2022 | B | Apt 3C · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Jul 11, 2022 | B | Apt 3C · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE LOCATED AT APT 3C, 3rd STORY, 4th APARTMENT FROM SOUTH AT WEST | Aug 15, 2022 |
| Aug 5, 2021 | B | § 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES ..CONSISTING OF FLOWER POT AND HOUSEHOLD ITEMS AT 2ND, 5TH AND 6TH STORY BALCONIES AT 2nd FIRE ESCAPE FROM NORTH AT WEST | Sep 9, 2021 |
| Oct 5, 2016 | B | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HANDRAIL AT SOUTH SIDE OF WEST ENTRANCE AT STOOP, 1st STORY | Nov 9, 2016 |
| Jan 18, 2012 | B | Apt 2K · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2K, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 22, 2012 |
| Jan 18, 2012 | B | Apt 2K · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF RUST AT BATHTUB IN THE BATHROOM LOCATED AT APT 2K, 2nd STORY, 3rd APARTMENT FROM NORTH AT EAST | Feb 22, 2012 |
| Jun 6, 2011 | B | § 27-2040 ADM CODE INSTALL AND MAINTAIN SUFFICIENT LIGHT OR LIGHTS OF AT LEAST 100 WATTS INCANDESCENT OR EQUIVALENT EACH, TO LIGHT ADEQUATELY FROM SUNSET TO SUNRISE THE REAR YARD | Jul 11, 2011 |
| Jun 6, 2011 | C | Apt 1A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAKING FROM CEILING IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM NORTH AT EAST | Jun 12, 2011 |
| Jun 25, 2008 | C | Apt 1B · § 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK ENTRANCE DOOR TO 1 STY SOUTHEAST APT 1B NORTH SECTION BLDG. , SECTION '' '' | Jul 1, 2008 |
| Jun 18, 2008 | B | D26-10.01 ADM CODE ABATE THE NUISANCE CONSISTING OF REFRIGERATORS WITH LOCKING DEVICE INTACT METER ROOM CELLAR. | Jul 23, 2008 |
| Jun 18, 2008 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF CONCEALED LEAK CEILING 5 STY EAST APT CENTER APT 5G BATHROOM ER1. | Jun 24, 2008 |
| Jun 18, 2008 | C | Apt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING 5 STY EAST CENTER APT 5G BATHROOM ER1. LOCATED AT APT 5G | Jun 24, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 4:36 PM ET. BBL 3072320001.