5 floors · 8 apartments · 7,200 sq ft · built 1870 · class C7 · owner of record: Ponte Equities Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 67 days | Annual |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-02 (Accepted). Agency page | Dec 31, 2026 in 67 days | 1 of 1 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 83 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 798 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 4, 2026 | Construction CLASS - 1 AGGRAVATED CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #39183753M ISSUED 4/8/2028. AT EXPOSURE 2, SEVERE CRACKS AND SEPARATION REMAIN IN THE MASONRY FACADE. THE EXISTING METAL CORNICE E #39198954K | May 6, 2027 PENDING | $6,250 |
| Apr 8, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS/APPURTENANCES. AT TIME OF INSPECTION OBSERVED AT EXPOSURE#2 (COLLISTER STREET) SEVERE CRACKS AT MASONRY FACADE WITH SEVERE SEPARATION. ALSO EXISTING METAL CORNICE HAS SEVERE C #39183753M | Dec 1, 2026 PENDING | $5,000 |
| Feb 11, 2026 | Construction CLASS - 2 FAILURE TO SUBMIT CERTIFICATE OF CORRECTION FOR VIOLATION #39150054M ISSUED ON 06/04/2025 FOR FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER, FILE A CERTIFICATE OF CORRECTION #39176861Y | Apr 23, 2026 IN VIOLATION | $0 |
| Jun 4, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING FACADE, AT TIME OF INSPECTION OBSERVED HALF OF INCH CRACKS IN THE FACADE UNDER THE SIDEWALK SHED ON EXP#2, REPAIR AND/REPLACE #39150054M | Feb 19, 2026 IN VIOLATION | $2,500 |
| Jul 20, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR OF BUILDING.VERTICAL AND HORIZONTAL CRACKS WITHIN MASONRY DISLODGED BROCK THROUGHOUT FACADE.SIDEWALK SHED PROVIDED.NO WORK BEING DONE.REMEDY:MAINTAIN FACADE PROVIDE NECESSARY REPAIR #35557798Y | Jun 23, 2022 IN VIOLATION | $0 |
| Jun 8, 2021 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER ATOI NOTED:@FACADE EXP2@1,2,3FL WINDOWS VERT STRUCTURAL CRACKS IN BRICK APPROX12"X4'.ALSO@EXP2 NEAR ROOF SEVERAL DISLODGED BRICKS&@FACADE EXP1 BELOW PARAPET DAMA #35561212J | Nov 3, 2022 IN VIOLATION | $2,865 |
| Apr 12, 2021 | Construction CLASS - 1 OBSERVED 2-VERTICAL CRACKS ON EXTERIOR BRICK WALL AT EXPO # 02 BOTH SIDE OF LAST ROW WINDOW FROM 1ST FL. TO ROOF LEVEL AND LOOSE BRICKS AT THE CORNER OF EXPO # 02 & 03 UNDER ROOF CORNICE. ALSO OBSERVED METAL CO #39039199H | Jan 20, 2022 IN VIOLATION | $0 |
| Jun 7, 2016 | Boilers CLASS - 2 B265 AS PER CLASS (B265) 28-303.7 FAILURE TO FILE A COMPLETE BOILER INSPECTION REPORT AS PER DOB RECORDS. SUBMIT A CURRENT BO9 REPORT COR RECT ALL VIOLATING CONDITIONS AND SUBMIT THE CERTIFICATE OF CORRECTION #32076887J | Jul 28, 2016 IN VIOLATION | $0 |
| Jan 31, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALL & APPURTENANCES. NOTED: BRICK WORK IS CRACKED FROM GROUND LEVEL UP TO 4TH STY ON WEST SIDE OF BLDG(FACING COLLISTER ST)ALSO METAL CORNICE OS ROTTED & MISSING PIECES AT VARIOUS #35168603X | Mar 17, 2016 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 9, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DETERIORATING FACADE ON ALL EXPOSURES. DAMAGED/RUSTED WINDOW LINTELS, RUSTED OUT DEFECTIVE CORNICE, STEP CRACKING, AND CRACKED BRICKS ALL IN MULTIPLE LOCATIONS ON EXPOSURE 1 AND 2. REMEDY: REPAIR AND/OR REPLACE #SR10101XN | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION #34919 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #14634 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #35789 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #14945 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #03801 | DOB VIOLATION - ACTIVE |
| Jun 29, 2021 | CONSTRUCTION SEE DOB VIOLATION # 062621FEU10101IK FOR DESCRIPTION OF CONDITIONS OWNR TO IMMED RETAIN NYS LIC PE&SURVYOR TO DVLP&IMPLMNT OPTICL MONITRG CAMPAIGN TO DETERMINE&MONITR MOVMT OF BLDG.PLAN SHALL COMPLY WITH MIN REQUIREMNTS OF RELEVANT SECTNS OF TPPN 10/88.DATA TO BE REVIEWED BY PE +SUBMITTD TO FEU ON A #FEU10102IK | DOB VIOLATION - ACTIVE |
| Jun 29, 2021 | CONSTRUCTION FTM-DEFORMED METAL CORNICE W/PIECES MISSING;LEANING COLMNS@1FL;CRACKED FOOTING @COLUMN@EXP1/2CRNER.@EXP2 CRACKS+DEFORMD FACADE@NORTH-MOST BAY OF WNDWS@MULTI FLRS;.AT EXP3-BULGE OF BRCK WALL.@ROOF:CRCKD+DTRIORATED MEMBRANE.OWNR RTAIN NYS LIC PE&DOB REG CONTRCTR-EVALU ENTRE BLDG+RPAIR UNDR PRMT.FILE R #FEU10101IK | DOB VIOLATION - ACTIVE |
| Apr 12, 2021 | CONSTRUCTION OBSERVED 2-VERTICAL CRACKS ON EXTERIOR BRICK WALL AT EXPO # 02 BOTH SIDE OF LAST ROW WINDOW FROM 1ST FL. TO ROOF LEVEL AND LOOSE BRICKS AT THE CORNER OF EXPO # 02 & 03 UNDER ROOF CORNICE. ALSO OBSERVED METAL CORNICE INSTATE OF DISREPAIR CONDITION WITH MISSING & LOOSE DENTALS AT EXPO # 01 & 02 #21-00394 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #01055 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #01662 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #01178 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #01153 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #01903 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #01034 | DOB VIOLATION - ACTIVE |
| Mar 1, 2013 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT #00130 | DOB VIOLATION - ACTIVE |
| Dec 13, 2011 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT #00138 | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #00190 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #01831 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #01744 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #02074 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #00275 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Aug 31, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Mar 1, 2013 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT | Active |
| Dec 13, 2011 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 31, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 4, 2026 | ECB | Construction: AGGRAVATED CONDITIONS OBSERVED AT TODAY'S INSPECTION, CONSISTENT WITH VIOLATION #39183753M ISSUED 4/8/2028. AT EXPOSURE 2, SEVERE CRACKS AND SEPARATION REMAIN IN THE MASONRY FACADE. THE EXISTING METAL CORNICE E | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 8:13 AM ET. BBL 1002140026.