2 floors · 38,380 sq ft · built 1948 · class E1 · owner of record: Mba Long Island City
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 38,380 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 187 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 187 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 15, 2021 | Signs CLASS - 2 ZR 52-61 OUTDOOR SIGN STRUCTURE USE DISCONTINUED FOR MORE THAN TWO YEARS. MUST CONFORM TO CURRENT REGULATIONS.REMEDY:REMOVE ILLEGAL STRUCTURE. #35478781M | Nov 18, 2022 IN VIOLATION | $0 |
| Jul 16, 2012 | Unknown CLASS - 2 WORK WITHOUT A PERMIT. WORK NOTED:WOOD FRAME 7TH FLR MEZZANINE ERECTEDFULL HEIGHT PARTITION ERECTED SUBDIVING SPACE BELOW MEZZANINE WOOD FRAME STAIRS ERECTED FOR MEZZANINE ACCESS. WATER & WASTE LINE INSTALLED F #34988791J | Dec 11, 2012 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 13, 2023 | CONSTRUCTION COMM'S ORDER APPROX 75' MONOPOLE SIGN STRUCTURE ON LOT. REMEDY: OWNER TO IMMEDIATELY ENGAGE A NYS PE EXPERIENCED W/MONOPOLE SIGN STRUCTURES TO INSPECT STRUCTURE INCLUDING VISUAL INSP. ENGINEERING & MATERIALS TESTING EVALUATION OF ALL COMPONENTS OF STRUCTURE & FOUNDATION ETC IMMEDIATELY NOTIFY DOB OF #23-02867 | DOB VIOLATION - ACTIVE |
| Jul 30, 2018 | CONSTRUCTION FAILURE TO CORRECT UNLAWFUL ARTERIAL DOUBLEFACED MONOPOLE SIGN STRUCTU RE AND WALL SIGN STRUCTURE ERECTED AND MAINTAINED W/OUT PERMITS ALL SI GN EXCEED THE SURFACE AREA LIIMITS IN MZ ZONE NEXT TO LIE ANY POSSIBLE NON CONFORMING USE WAS LOST AS THE SIGN STRUCTURES WER VACANT OR USED TO DISPLAY ILLEGA #SGSPO1EC | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 10:12 AM ET. BBL 4002910001.