1.5 floors · 4,115 sq ft · built 1957 · class GW · owner of record: Gmh Roosevelt Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1146 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 29, 2025 | Construction CLASS - 2 FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39082695K ISSUED ON 03/30/2023, AND FAILURE TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE CERT #37032850N | Apr 15, 2025 DEFAULT | $3,125 |
| Dec 30, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS NOTED: VIOLATION # 39117456K ISSUED ON 06/21/2024 TO CONDUCT A FINAL INSPECTION FOR JOB#42196 #39133947P | Mar 11, 2025 DEFAULT | $3,125 |
| Dec 30, 2024 | Construction CLASS - 2 ALTERED/CHANGED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY AS PER 28-118.3.1 - 28-118.3.2. NOTED: AT TIME OF INSPECTION OBSERVED BUILDING ALTERED/CHANGED FROM GASOLINE STATION, LUBRICATION, MINO #39133946N | Mar 11, 2025 DEFAULT | $3,125 |
| Jun 21, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS, CONTAINED IN SUMMON #39082695K., FILE A CERTIFICATE OF CORRECTION; COMPLY WITH CODE. #39117455Z | Aug 27, 2024 DEFAULT | $3,125 |
| Jun 21, 2024 | Construction CLASS - 2 FAILURE TO CONDUCT OR FILE A FINAL INSPECTION OF PERMITTED WORK WITH THE DEPARTMENT OF BUILDINGS, CONTAINED IN JOB #421961103., CONDUCT/FILE FINAL INSPECTION; COMPLY WITH CODE. #39117456K | Aug 27, 2024 DEFAULT | $3,125 |
| Mar 13, 2024 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH DEPT OF BUILDINGS. NOTED; SUMMONS 39082695K ISSUED ON 3/30/2023 HAS NOT FILED A COC AS OF DATE., FILE A CERTIFICATE OF COR #39108680K | May 21, 2024 DEFAULT | $3,125 |
| Mar 30, 2023 | Construction CLASS - 2 ALTERED / CHANGED BUILDING OCCUPIED WITHOUT A VALID C/O AS PER 28-118.3.1 AND 28-118.3.2. NOTED; ALT-1 JOB #421961103 FILED TO CONVERT FROM GAS STATION TO CAR WASH. AT TIME OF INSPECTION NO FINAL INSPECTION PER #39082695K | Jun 6, 2023 STIPULATION/IN-VIO | $630 |
| Dec 7, 2021 | Unknown CLASS - 2 CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.NOTED:ATTIME OF INSPECTION OF AN ALTERATION TYPE-1,1 STORIE BUILDING,CONSTRUCTION IN PROGRESS,I ASKED TO SPEAK WITH THE CONSTRUCTION SUPER,I WAS INF #35641604Z | Aug 2, 2022 IN VIOLATION | $5,000 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 5:36 PM ET. BBL 4001380060.