5 floors · 130,450 sq ft · built 1921 · class O5 · owner of record: Fulton St Realty Venture
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 61 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-10-17 (Accepted). Agency page | Dec 31, 2026 in 61 days | 1 of 1 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 130,450 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 182 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 182 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1157 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 152). Agency page | Dec 31, 2032 in 2253 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 26, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION IN RESPONSE TO COMPLAINT I OBSERVED UNDERSIDE OF SIDEWALK SHED A NOT ILLUMINATED AS PER 3307.6.4.8. THIS CREATES A HAZARDOUS CONDITION FOR PUBLIC WALKING UNDERNEATH WHILE DARK AND NOT BEIN #39550936R | May 6, 2026 IN VIOLATION | $2,400 |
| Aug 26, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION IN RESPONSE TO COMPLAINT I OBSERVED UNDERSIDE OF SIDEWALK SHED A NOT ILLUMINATED AS PER 3307.6.4.8. THIS CREATES A HAZARDOUS CONDITION FOR PUBLIC WALKING UNDERNEATH WHILE DARK AND NOT BEIN #39544086Z | May 21, 2026 IN VIOLATION | $1,250 |
| May 29, 2025 | Construction CLASS - 2 AT FRONT OF BUILDING, ON ALL LEVELS, STUCCO PEELING AND SPALLING FINISH., MAINTAIN EXTERIOR BUILDING WALL #39149268J | Jun 15, 2026 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #08139 | DOB VIOLATION - ACTIVE |
| Nov 30, 2020 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPO 1/4, A SECTION OF MASONRY STONE WORK APPROX: 1'X1' WEIGHT 45LBS HAS DETACHED AN FALLEN ONTO PUBLIC SIDE WALK. #20-01596 | DOB VIOLATION - ACTIVE |
| Jan 7, 2003 | ELEVATOR 3P530 #9013/367732 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #21043 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 31, 2026, 2:54 PM ET. BBL 3001520006.