3 floors · 3 apartments · 2,720 sq ft · built 1899 · class C0 · owner of record: Friedrich, Abraham
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 19, 2022 | Construction CLASS - 1 WORK W/O PERMIT:NOTE:ATOI OF ABOVE PREMISES OBSERVED@EXP1 EXCAVATING TO CREATE NEW STEPS TO BSMT&REMOVING OLD STEPS (9STEPS ADDED).AS PER DOB NO PERMITS ON FILE.WORK APRX50% COMPLETE.STOP ALL WORK@EXP1.STOP ALL #35358399P | Jun 12, 2023 DEFAULT | $12,500 |
| Nov 7, 2018 | Construction CLASS - 1 WORK W/O A PERMIT. NOTED: OBSERVED COMPLETE DEMOLITION GOING ON PLUMBING(REMOVING WATER & WASTE LINES)THROUGHOUT BLDG. ALSO ELECTRICAL LINESBEING REMOVED THROUGHOUT THE BLDG. THE WORK IS 80% DONE. #35369956M | Feb 4, 2019 DEFAULT | $4,000 |
| May 16, 2018 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: BASEMENT DOOR BROKEN AND DEFECTIVE WITH AN ACCUMULATION OF DEBRIS STORED UP IN FRONT OF BASEMENT DOOR AND IN FRONT YARD. 1ST FLOOR FRONT DOOR DEFECTI #35273014M | Jul 16, 2018 DEFAULT | $1,562 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)