1 floors · 6,765 sq ft · built 1987 · class H4 · owner of record: Verrazano Hotel Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 18, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39176542R . AS OF 6/18/2026., FILE A CERTIFICAT #39193092N | Apr 19, 2027 PENDING | $1,250 |
| Jun 18, 2026 | Construction CLASS - 2 FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39176541P AS OF 6/18/2026., FILE A CERTIFICATE #39193088K | Apr 19, 2027 PENDING | $1,250 |
| Feb 9, 2026 | Construction CLASS - 1 OBSERVED IN THE BASEMENT INSTALL PVC WASTE LINES AND WATER LINES FOR KITCHEN SINK ALL WORK COMPLETED 100% NO PERMITS ON FILE., OBTAIN PERMIT #39176542R | Mar 11, 2027 DEFAULT | $2,530 |
| Feb 9, 2026 | Construction CLASS - 1 OBSERVED IN THE BASEMENT A GAS LEAK IN THE BOILER ROOM. PVC PIPING IS USED UNDER THE KITCHEN SINK WASTE LINE. OPEN ENDED WASTE LINES, HAVING CORROSION ON GAS LINES, HAVING A FUTURE ON GAS LINE AND HAVING PENETR #39176541P | Mar 11, 2027 DEFAULT | $2,530 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #19927 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #18500 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 8:44 PM ET. BBL 5029930001.