Bronx · Block 2329 · Lot 53 · 10451

480 College Avenue

5 floors · 40 apartments · 43,650 sq ft · built 1915 · class C1 · owner of record: 331 E.146th St Hsngdeve

30open violations
$0ECB/OATH penalties owed
5HPD class C (immediately hazardous)
59dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 59 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 59 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2023-04-03 (Accepted). Agency page

Dec 31, 2026
in 59 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 75 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 43,650 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 180 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 180 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 303 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 790 days
Next cycle year 2028

Open violations

ECB / OATH (0)

None open.

DOB (3)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#07605
DOB VIOLATION - ACTIVE
Dec 1, 2024FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2400569
DOB VIOLATION - ACTIVE
Jan 28, 1991CONSTRUCTION

#1M02
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Oct 8, 2026GHG Emissions - LL97 FTF-EN-LL97321
FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B).
Active
Sep 25, 2026Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Jun 24, 2026GHG Emissions - LL97 FTF-EN-LL97321
Active
Jun 22, 2026Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Mar 6, 2026Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Dec 3, 2025Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 26, 2025Benchmarking - LL84 FTF-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Dec 1, 2024Energy Grade - LL33 FTP-EN-EGRDEA
Active
HPD (18) · C 5 · B 9 · A 4
IssuedClassViolationCorrect by
Oct 9, 2026B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING AT BULKHEAD AT PUBLIC HALL, 5th STORYNov 13, 2026
Oct 9, 2026B§ 53,187,231 M/D LAW & DEPT RULES & REG. PROVIDE MEANS OF EGRESS FROM YARD TO STREET BY FIREPROOF PASSAGEWAY FOR WHICH APPLICATION MUST BE FILED FOR APPROVAL,OR BY UNLOCKED DOOR OR GATE IN FENCE TO ADJOINING PREMISES WITH CONSENT OF ADJACENT OWNER.Nov 13, 2026
Oct 9, 2026A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORYJan 12, 2027
Oct 9, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT BULKHEAD CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORYNov 13, 2026
Oct 9, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED CYLINDER LOCK AT BUILDING NORTH REAR YARD GATE DOOROct 15, 2026
Oct 9, 2026B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF A AIR CONDITIONER PETRUDING AT 4TH STORY BALCONY [ 1ST FIRE ESCAPE FROM EAST ] YARDNov 13, 2026
Sep 3, 2026BApt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCES AT WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 8, 2026
Sep 3, 2026BApt 2C · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCES IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOct 8, 2026
Sep 3, 2026AApt 2C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM EAST, THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST, THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTDec 7, 2026
Jul 6, 2026C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER CHUTE DOOR AT PUBLIC HALL, 4th STORYJul 20, 2026
Jun 22, 2026A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER (SHOE) USING APPROPRIATE NUTS AND BOLTS AT WEST EXTERIOR WALL AT FIRE ESCAPESep 25, 2026
Jun 22, 2026A§ 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER (SHOE) USING APPROPRIATE NUTS AND BOLTS AT SOUTH EXTERIOR WALL (BUILDING FRONT) AT FIRE ESCAPESep 25, 2026
Sep 6, 2022CApt 3D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3D, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WESTOct 2, 2022
Jan 21, 2022CApt 4B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) EAST WALL IN THE 4th ROOM FROM EAST AT NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHFeb 14, 2022
Oct 23, 2019CApt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHNov 13, 2019
Nov 15, 2018BApt 1A · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AND MILDEW APPROX 8 SQ FT AT CEILING AND WALLS IN THE BATHROOM LOCATED AT APT 1A, 1st STORY, 1st APARTMENT FROM WEST AT NORTHDec 20, 2018
Jun 28, 2016BApt 4A · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHAug 2, 2016
Jun 28, 2016BApt 4A · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL IN THE FOYER LOCATED AT APT 4A, 4th STORY, 1st APARTMENT FROM WEST AT NORTHAug 2, 2016

Issued in the last 120 days

DateSourceWhatNow
Oct 9, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING AT BULKHEAD AT PUBLIC HALL, 5th STORYOpen
Oct 9, 2026HPD B§ 53,187,231 M/D LAW & DEPT RULES & REG. PROVIDE MEANS OF EGRESS FROM YARD TO STREET BY FIREPROOF PASSAGEWAY FOR WHICH APPLICATION MUST BE FILED FOR APPROVAL,OR BY UNLOCKED DOOR OR GATE IN FENCE TO ADJOINING PREMISES WITH CONSENT OF ADJACENT OWNER.Open
Oct 9, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT BULKHEAD CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORYOpen
Oct 9, 2026HPD B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT BULKHEAD CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORYOpen
Oct 9, 2026HPD C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED CYLINDER LOCK AT BUILDING NORTH REAR YARD GATE DOOROpen
Oct 9, 2026HPD B§ 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES CONSISTING OF A AIR CONDITIONER PETRUDING AT 4TH STORY BALCONY [ 1ST FIRE ESCAPE FROM EAST ] YARDOpen
Oct 8, 2026DOB SafetyGHG Emissions - LL97: FAILURE TO FILE A COMPLIANCE REPORT AS REQUIRED BY AD CODE SEC. 28-321.3 IN ACCORDANCE WITH 1 RCNY § 103-17(B).Open
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open
Sep 3, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCES AT WEST WALL IN THE 4th ROOM FROM EAST AT SOUTH LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 3, 2026HPD B§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOWER WINDOW SASH SPRING BALANCES IN THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Sep 3, 2026HPD A§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE FOYER , THE 1st ROOM FROM EAST, THE PRIVATE HALLWAY , THE 3rd ROOM FROM EAST, THE KITCHEN LOCATED AT APT 2C, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTOpen
Jul 6, 2026HPD C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT HOPPER CHUTE DOOR AT PUBLIC HALL, 4th STORYOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 2, 2026, 3:44 AM ET. BBL 2023290053.

Look up another building