5 floors · 77,580 sq ft · built 1920 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 77,580 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 422). Agency page | Dec 31, 2032 in 2260 days | Next due 2032 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE IRON FENCE AT THE BUILDING PERIMETER HAS SEVERAL GATES MISSING AND IS BROKENOR BENT OUT OF SHAPE IN MANY PLACES.THE MISSING GATES ALLOW EASY ACCES #35734586R | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 6, 2026 | Construction CLASS - 2 REISSUE#35693259L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED:THERE ARE SEVERAL PENETRATIONS IN WALLS AND CEILINGS OF THE ELECTRIC METER ROOM THAT NEED FIREST #35734583L | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT THE CONCRETE WALKWAY AGAINST THE BUILDING WALL BETWEEN EXITS 3 AND 4,THERE ISA COLLAPSED SINK HOLE.THIS CONDITION PRESENTS THE RISK OF SERIOUS INJU #35734587Z | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE MASONRY STEPS AT EXTERIOR OF EXIT#3 ARE CRACKED,CHIPPED,UNEVEN AND OVERALL DETERIORATING.THIS CONDITION COASOS A TRIP HAZARD.REM:REPAIR/REPLACE. #35734585P | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 6, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:MORE THAN HALF THE WINDOWS IN THIS SCHOOL ARE NOT WORKING.SOME ARE NAILED OR SOROWED CLOSED.MANY ROOMS WITHOUT VENTILATION.REM:REPAIR/REPLACE. #35734584N | Aug 20, 2026 POP/IN-VIO | $0 |
| Aug 13, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: NO FIRESTOPPINGPER BC 712.3; 27-345. NOTED: AT TIME OF INSPECTION, THE ELECTRIC METERROOM HAS SEVERAL OPENING AT WALLS AND CEILINGS THAT NEED FIRESTOPPING. #35693259L | Sep 10, 2025 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #00239 | DOB VIOLATION - ACTIVE |
| Mar 17, 1992 | ELEVATOR #E1426A5 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE IRON FENCE AT THE BUILDING PERIMETER HAS SEVERAL GATES MISSING AND IS BROKENOR BENT OUT OF SHAPE IN MANY PLACES.THE MISSING GATES ALLOW EASY ACCES | Open |
| Aug 6, 2026 | ECB | Construction: REISSUE#35693259L FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NO FIRESTOPPING PER BC 712.3;27-345.NOTED:THERE ARE SEVERAL PENETRATIONS IN WALLS AND CEILINGS OF THE ELECTRIC METER ROOM THAT NEED FIREST | Open |
| Aug 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT THE CONCRETE WALKWAY AGAINST THE BUILDING WALL BETWEEN EXITS 3 AND 4,THERE ISA COLLAPSED SINK HOLE.THIS CONDITION PRESENTS THE RISK OF SERIOUS INJU | Open |
| Aug 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:THE MASONRY STEPS AT EXTERIOR OF EXIT#3 ARE CRACKED,CHIPPED,UNEVEN AND OVERALL DETERIORATING.THIS CONDITION COASOS A TRIP HAZARD.REM:REPAIR/REPLACE. | Open |
| Aug 6, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:MORE THAN HALF THE WINDOWS IN THIS SCHOOL ARE NOT WORKING.SOME ARE NAILED OR SOROWED CLOSED.MANY ROOMS WITHOUT VENTILATION.REM:REPAIR/REPLACE. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 24, 2026, 6:28 AM ET. BBL 1004220072.