19 floors · 87,550 sq ft · built 1962 · class H8 · owner of record: Yeshiva University
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 87,550 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 166 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 166 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $388,140 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 828 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1141 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 863). Agency page | Dec 31, 2033 in 2602 days | Next due 2033 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2021 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 8C & 9C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #902477.REMEDY:FILE ACCEPTABLE REPORT #37022115H | Feb 24, 2022 IN VIOLATION | $0 |
| Apr 16, 2021 | Construction CLASS - 1 WORK CONTRARY TO APPROVED CONSTRUCTION DOCUMENTS(CD-5)AT TIME OF INSPECTION OF AN ACTIVE JOBSTIE,I OBSERVED 2 WORKERS ON SUSPENDED SCAFFOLD AT EXPOSURE#1.UPON REVIEW OF CD-5,I DISCOVERED THE TIEBACK ANCHER PLAT #35550780Y | Jul 1, 2021 IN VIOLATION | $2,500 |
| Oct 10, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENACES.AS NOTED:AT TIME OF INSPECTIONS OBSERVED ON EXPOSURE#1 NORTH ELEVATION:-CRACKEDLOOSE COPING STONE ON 18TH FLOOR PARAPET,NORTH WEST END OF PARAPET.EXP #35365683H | Mar 11, 2021 DEFAULT | $0 |
| Apr 13, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES. AT THE TIME OF INSPECTION IT WAS OBSERVED THAT AT IS FLOOR UNDER WINDOW AT EXP#1 OBSERVED STEP CRACK IN FACADE W/BRICK APPROX 1/4INCH OUT FROM FACADE. #35245149L | Aug 3, 2017 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 11, 2023 | CONSTRUCTION THE DEPT. OF BUILDINGS ORDERS THAT YOU STOP ALL WORK UNDER PERMITS ISSUED IN CONNECTION WITH APPLICATION #140952182. THE APPLICATION OF RECORD HAS INFORMED THE DEPARTMENT THAT SHE OR HE HAS WITHDRAWN FROM THE PROJECT. STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE. UNABLE TO DETERMINE % OF WORK CO #23-03267 | DOB VIOLATION - ACTIVE |
| Apr 30, 2019 | FACADE SAFETY PROGRAM CYCLE 8C NRF #NRF47129 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Apr 30, 2019 | Facades FISP CYCLE 8C NRF | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 25, 2008 | A | D26-41.15 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. | Sep 28, 2008 |