Manhattan · Block 29 · Lot 7501 · 10004

48 Beaver Street

8 floors · 39 apartments · 61,238 sq ft · built 1920 · class RM · owner of record: Beaver Equities Group, L.P

23open violations
$625ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 66 days
Annual
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-06 (Accepted). Agency page

Dec 31, 2026
in 66 days
4 of 4 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 82 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $138,900 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 118 days
No Cycle 10 report on record yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 61,238 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 187 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 187 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 797 days
Next cycle year 2028
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 29). Agency page

Dec 31, 2029
in 1162 days
Next due 2029

Open violations

ECB / OATH (1) · $625 owed
IssuedViolationHearingBalance
Dec 9, 2022Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#900104.REM:SUBMIT ACCEPTABLE REQUIRED T
#37025088P
Apr 20, 2023
IN VIOLATION
$625
DOB (6)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00007
DOB VIOLATION - ACTIVE
Jun 20, 2021FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
#00004
DOB VIOLATION - ACTIVE
Jun 29, 2020FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
#10005
DOB VIOLATION - ACTIVE
Jan 26, 2018(PRIVATE RESIDENCE) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO PRIV RES ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#00002
DOB VIOLATION - ACTIVE
Feb 17, 2017FACADE SAFETY PROGRAM

#HAZ86580
DOB VIOLATION - ACTIVE
Jan 27, 2014ELEVATOR

#9038/495467
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Oct 2, 2023Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Jun 20, 2021Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Jun 29, 2020Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Jan 26, 2018Elevators ACJ1
Active
Feb 17, 2017Facades FISP
CYCLE 8A UNSAFE REPORT FILED
Active
HPD (8) · C 0 · B 8 · A 0
IssuedClassViolationCorrect by
Oct 10, 2023BApt 801 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 10SQ AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 801, 8th STORY, 1st APARTMENT FROM WEST AT NORTHNov 14, 2023
Oct 10, 2023BApt 801 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 801, 8th STORY, 1st APARTMENT FROM WEST AT NORTHNov 14, 2023
Oct 10, 2023BApt 801 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 801, 8th STORY, 1st APARTMENT FROM WEST AT NORTHNov 14, 2023
Sep 18, 2023BApt 801 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 24 SQ FT AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 801, 8th STORY, 1st APARTMENT FROM NORTH AT EASTOct 23, 2023
Sep 13, 2023BApt 801 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 801, 8th STORY, 1st APARTMENT FROM NORTH AT EASTOct 18, 2023
Sep 13, 2023BApt 801 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST LOCATED AT APT 801, 8th STORY, 1st APARTMENT FROM NORTH AT EASTOct 18, 2023
Feb 18, 2016BApt 102 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOOD DOOR AT CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMar 24, 2016
Feb 18, 2016BApt 102 · § 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTMar 24, 2016

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 8:22 AM ET. BBL 1000297501.

Look up another building