Queens · Block 2306 · Lot 30 · 11377

48-18 Laurel Hill Blvd

1 floors · 360 sq ft · built 1931 · class Z9 · owner of record: 4818 Laurel Hill Llc

4open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
1159dto Gas piping inspection (2029 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1159 days
Next cycle year 2029

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Sep 17, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. AT EXPOSURE 3, ROOF LEVEL HAS A WALL WITH STUDS THAT IS DETERIORATING FROM THE STRUCTURE., REPAIR AND/REPLACE
#39160803J
Nov 25, 2025
ADMIT/IN-VIO
$0
DOB (1)
IssuedViolationStatus
Sep 17, 2025CONSTRUCTION
REQUESTING AN ENGINEER REPORT DUE TO ROOF WALL BEING IN A STATE OF DISREPAIR. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE DAMAGES PROPERTY HAS SUSTAINED.
#25-02164
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 4:18 AM ET. BBL 4023060030.

Look up another building