4 floors · 299,040 sq ft · built 1950 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (5 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-16 (Accepted). Agency page | Dec 31, 2026 in 62 days | 5 of 5 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 299,040 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 738). Agency page | Dec 31, 2028 in 793 days | Next due 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 5, 2026 | Construction CLASS - 2 RE-ISSUE #35692050X. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 4TH FLOOR SMOKE STAIR B, CORRIDOR BY 45-/ 3RD FLOOR-CORRIDOR BY 350, 2ND FLR-206 ENTRANCE TO BOYS LOCKER ROOM. (5)STAIR S AN #35728616H | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 RE-ISSUE #35693199Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT 4TH FLOOR-413, 331 OUTSIDE AND INSIDE CLASSROOM, GYM G1-G2, CAFETERIA EXIT 1A AND B WATER PENETRATION SPALLING AT CEILING. R #35728613M | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 EXIT DOOR NOT SELF-CLOSING. NOTED: ON 1ST FLOOR EXTERIOR EXIT DOORS 6 AND 7 DO NOT SELF-CLOSE PROPERLY. REMEDY: REPAIR/REPLACE DOOR. #35728617J | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 RE-ISSUE #35693196N. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PERBC 1006.1; 27-381. NOTED: THROUGHOUT ENTIRE BUILDING ALL LEVELS #S-4, #35728614Y | Mar 4, 2026 POP/IN-VIO | $0 |
| Feb 5, 2026 | Construction CLASS - 2 RE-ISSUE #35692051H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EXIT 4/5, 9, 10, SMOKE 12, 13 AND MAIN CELLAR 1A, B. BOTTOM GLASS PANELS ARE CRACKED. REMEDY: REPAIR AND/OR REPLACE. #35728615X | Mar 4, 2026 POP/IN-VIO | $0 |
| Aug 12, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED-EXP #1 NORTH-CRACKED BRICK BY/ABOVE TOP FL WINDOWS ABOVE MAIN ENTRYWAY.-EXP #2 EAST-CRACKED BRICK NORTHEAST EN #35718363J | Sep 2, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 REISSUE#35672150P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED THROUGHOUT ENTIRE BUILDING ALL LEVELS MULTIPLE EMER #35693196N | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT EXIT 4/5,9,10,SMOKE 12,13 AND MAIN CELLAR 1A,B BOTTOM GLASS PANELS.REM:REPAIRAND/OR REPLACE. #35692051H | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED AT 4 FLOORSMOKE STAIR B,CORRIDOR BY 450,3 FL.CORRIDOR BY 350,2 FL 206 ENTRANCE TO BOYS LOCKEROOM,(5)STAIR S&K,1 FL AND ENTRANCE,STAGE LEFT & RIGHT (5) #35692050X | Jul 8, 2025 POP/IN-VIO | $0 |
| Mar 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED AT 4 FLOOR413,441 OUTSIDE & INSIDE CLASSROOM GYM G1-G2,CAFETERIA EXIT 1A & B,WATER PENETRATION SPALLING AT CEILINGS.REM:REPAIR AND/OR REPLACE. #35693199Z | Jul 8, 2025 POP/IN-VIO | $0 |
| Feb 27, 2024 | Construction CLASS - 2 REISSUE#35672150P FAILURE TO PROVIDE POWER FOR EMERGENCY EXIT LIGHTINGEMERGENCY LIGHT NOT WORKING WHEN TESTED NEEDS NEW BATTERY FOR UNITS LIGHT# 90,91,92,92A,118,128,128A,130A,131,101,101A.REM:PROVIDE ADEQUATE #35678684R | Apr 22, 2024 POP/IN-VIO | $0 |
| Feb 13, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY LIGHT#90,91,118,128,128A,130A,131,101,101A,92,92A ARE NOT WO #35672150P | May 30, 2023 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Aug 12, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO CRACKED BULGING & DISPLACED MASONRY BRICK @ EXP1, NORTH, 31ST AV, EXP#2 EAST, 49 STREET & EXP#4 48 ST. REMEDY: IMMEDIATELY TAKE PROVIDE ADEQUATE SAFETY MEASURES TO SECURE PUBLIC SAFETY INSTALL PUBLIC PROFECTION @ EXP1,2, & 4. ALSO MAKE IMMED REPAIR TO DEFECTIVE FACADE U/S #FA40101DD | DOB VIOLATION - ACTIVE |
| May 1, 2024 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00045 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 11, 2024 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| May 1, 2024 | Retaining Walls FTF-RW-INITL | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 8:52 PM ET. BBL 4007380002.