5 floors · 5 apartments · 4,728 sq ft · built 1930 · class C2 · owner of record: 479 Washington 123 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 24, 2026 | Unknown CLASS - 2 BC 3309.9 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS. AT TIME OF INSPECTION OBSERVED: BUILDING FULLY DEMOLISHED 5TH FL. LEVEL. NO WEATHERPROOF AT EXPO# 2 ADJOINING PROPERTY 475 WASHINGTON AVENUE SIDE, WALL E #39558281L | May 4, 2027 PENDING | $2,500 |
| Aug 24, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED: GC FAILURE TO SAFEGUARD PUBLIC AND PROPERTY, NO MEANS OF OVERHEAD PROTECTION FOR ADJACENT OCCUPIED BUILDING, AT EXPOSURE# 2 BRICKS THROUGHOUT AT ADJOINING OCCUPIED COURTYARD. CRE #39558280J | May 4, 2027 PENDING | $10,000 |
| Aug 19, 2026 | Construction CLASS - 1 FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTION, OBSERVED 5 STORY MULTIPLE DWELLING UNDERGOING FULL DEMOLITION UNDER PERMIT #B01284340, SHED WAS NOT PUT UP FOR DEMO WORK AS PER CODE BUILD #35721721H | May 11, 2027 PENDING | $4,800 |
| Jul 31, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE EXPIRED PERMIT. AT THE TIME OF INSPECTION, I OBSERVED CONSTRUCTION SITE FENCE UNDER JOB # B01219952-S1-FN EXP. 07/06/2025 IS EXPIRED AND NOT RENEWED IN DOB RECORDS., REN #39155573R | Dec 7, 2026 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Jun 23, 2026 | CONSTRUCTION FTM BLDG IN CODE COMPLIANT MANNER-OBSVD DISPLACEMENT OF FRONT CORNICE ATTACHED TO THE BLDG AND LOOSE BRKCS AND MISSING MORTAR AT THE TOP OF CHIMNEY AT EXP4 RIGHT SIDE OF THE PROPERTY. OWNER TO IMMED RETAIN NYSPE TO EVAL ENTIRE BLDG,PREPARE/FILE REPAIR DWGS, REPAIR BLDG UNDER PERMIT, START WORK WORK #PI30201HZ | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Sep 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 24, 2026 | ECB | Unknown: BC 3309.9 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS. AT TIME OF INSPECTION OBSERVED: BUILDING FULLY DEMOLISHED 5TH FL. LEVEL. NO WEATHERPROOF AT EXPO# 2 ADJOINING PROPERTY 475 WASHINGTON AVENUE SIDE, WALL E | Open |
| Aug 24, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: GC FAILURE TO SAFEGUARD PUBLIC AND PROPERTY, NO MEANS OF OVERHEAD PROTECTION FOR ADJACENT OCCUPIED BUILDING, AT EXPOSURE# 2 BRICKS THROUGHOUT AT ADJOINING OCCUPIED COURTYARD. CRE | Open |
| Aug 19, 2026 | ECB | Construction: FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTION, OBSERVED 5 STORY MULTIPLE DWELLING UNDERGOING FULL DEMOLITION UNDER PERMIT #B01284340, SHED WAS NOT PUT UP FOR DEMO WORK AS PER CODE BUILD | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 11:18 AM ET. BBL 3019790013.