Manhattan · Block 1275 · Lot 69 · 10017

473 5 Avenue

23 floors · 220,413 sq ft · built 1925 · class O4 · owner of record: 475 Fifth Avenue Owner Lp

2open violations
$6,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
184dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 220,413 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1159 days
Next cycle year 2029
Energy audit and retro-commissioning (2035) Likely applies
Local Law 87 · Calendar year 2035
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1275). Agency page

Dec 31, 2035
in 3350 days
Next due 2035
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $108,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SAFE (2026-02-02)

Open violations

ECB / OATH (2) · $6,250 owed
IssuedViolationHearingBalance
Feb 21, 2025Construction CLASS - 2
AT THE TIME OF INSPECTION, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 2 VERTICAL & HORIZONTAL MEMBERS & BEAMS PAINTED WHITE & PARAPET PANELS FULLY COVERED BLACK WITH WHITE WRITING CONTRARY TO BC 3307.6.4.11
#39537206Z
Feb 1, 2027
$3,125
Feb 21, 2025Construction CLASS - 2
UPON INSPECTION I OBSERVED SIDEWALK SHED INSTALLED AT EXPO 2 WITH NO PARAPET INFORMATION PANEL PROVIDED CONTRARY TO CODE: 3301.9.2- WHERE A SIDEWALK SHED IS INSTALLED, A SIDEWALK SHED PARAPET INFORMATION PANEL
#39537209Y
Feb 1, 2027
$3,125
DOB (1)
IssuedViolationStatus
Mar 21, 1991ZONING

#3LE
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 10:21 AM ET. BBL 1012750069.