6 floors · 61 apartments · 72,000 sq ft · built 1930 · class D7 · owner of record: Boro Park Portfolio Owner Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 72,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 427 days | Next cycle year 2027 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5628). Agency page | Dec 31, 2028 in 793 days | Next due 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-27 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 28, 2026 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. AT TIME OF INSPECTION BUILDING OWNER FAILED TO COMPLY WITH COMMISSIONER'S ORDER TO PROVIDE A ENGINEERING REPORT OF THE STRUCTURALLY COMPROMISED FACADE #39197898K | Mar 22, 2027 PENDING | $2,500 |
| Jul 8, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. ATOI OBSERVED BUILDING FACADE IN A STATE OF DISREPAIR BUILDING HAS FAILED MASONRY PATCHES, STEP CRACKS, DAMAGED PARAPET WALLS. CRACKS ON BULKHEADS AND CH #39195219K | Jun 7, 2027 PENDING | $2,500 |
| Mar 5, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING, ATOI OBSERVED APPROXIMATELY 110 SQUARE FEET OF CEILING (FIRESTOPPING) REMOVED LEAVING EXPOSED BEAMS IN APARTMENT D8 ON THE 4TH FLOOR. THIS IS A 6 STORY MULTIPLE DWELLING BUILDING W #39140550M | Jul 13, 2027 DEFAULT | $12,500 |
| Nov 28, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER: AT TIME OF INSPECTION OF A 6 STORY BLDG. OBSERVED AT EXPO #1 AND 3, FROM 2ND TO 6TH FLOORS MOST WINDOW A/C INSTALLED ON TOP OF WINDOW GLASS, SOME HAS NO SU #39100237J | Jul 18, 2024 IN VIOLATION | $0 |
| Nov 8, 2023 | Elevators CLASS - 1 CEASE USE ITEM: MISSING SELECTOR TAPE SWITCH PER K3. CLASS 2 ITEMS: MISALIGNED CAB MIRROR. INOPERATIVE DOOR OPEN BUTTON. HOIST CABLES CROSSED AT HITCH PLATE. SECURE WHEELHOUSE DOOR. WORN OVERHEAD SHEAVE BEARING #39098962M | Jan 17, 2024 IN VIOLATION | $1,250 |
| Oct 2, 2023 | Elevators CLASS - 1 2:X:10;IN-CAR COMMUNICATION IS NOT WORKING PROPERLY, NEED TO REPAIR. 8:V:1; CAR SADDLE TO FLOOR SADDLE IS NOT LEVEL ON MULTIPLE FLOORS, NEED TO ADJUST. 44:Q:3; TRACTION SHEAVE IN MOTOR ROOM IS UNGUARDED, NEED T #39096194J | Dec 6, 2023 IN VIOLATION | $1,250 |
| Jul 19, 2023 | Elevators CLASS - 1 2:X:10; IN-CAR PHONE NOT WORKING, NEED TO REPAIR. 16:X:10; HATCH DOOR IN BASEMENT NOT CLOSING PROPERLY, NEED TO REPAIR. 21:M:7; LOBBY INTERLOCK IS MISSING ITS COVER, NEED TO PROVIDE. 70:O:2; PIT IS DIRTY, NEED #39090502P | Sep 27, 2023 IN VIOLATION | $1,250 |
| Mar 9, 2023 | Elevators CLASS - 1 REPAIR OVER HEAD ROOM LIGHT., PROVIDE OVER HEAD ROOM LIGHT GUARD., PROVIDE OVER HEAD ROOM STOP SWITCH COVER., REPLACE FADED OVER HEAD ROOM DOOR SIGN., REPAIR CAR STATION BUTTON LIGHT INDICATORS., ADJUST 1ST FLO #39081137L | May 17, 2023 IN VIOLATION | $1,250 |
| Sep 13, 2022 | Elevators CLASS - 1 CLASS 2: PROVIDE UP TO DATE MAINTENANCE LOG BOOK., SERVICE AND TEG MOTOR ROOM FIRE EXTINGUISHER., PERFORM BRAKE MAINTENANCE AND POVIDE BRAKE TEG WITH DATE ENTERED IN FULL MM/DD/YEAR., PROVIDE UP TO DATE CAT 1 T #39069888K | Jan 18, 2023 IN VIOLATION | $1,250 |
| Apr 1, 2008 | Elevators Non-Hazardous 14B11,15M07,66O02,51M07,39P16,64Q03,36T07,36I11,36Q03,85BB05,11X10,08V01,26M0723I10,05J01,10H11,84H11.14B-REPLACE MIRROR.15M-PROVIDE CERTIFICATE.66O-CLEAN PIT.51M-ANTI SPINOUTS MISSING.39-NO ACCESS TO MOTOR ROO #38183551H | Jun 2, 2008 STIPULATION/IN-VIO | $0 |
| Apr 1, 2008 | Elevators Non-Hazardous 71X10,66O02,58E01,40T07,10M07,41G11,60G11,84H11,26M15,51M07,36T07,36I11,85M06.71X-UNDER CAR LIGHT INOPERATIVE.66O-CLEAN PIT.58E-BRAKE PAD RUBBING.40T-UNLABELED M.R. DOOR.10M-MISSING GIB.41,60G-UNREADABLE FUSES. #38183552J | Jun 2, 2008 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Sep 14, 2026 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #070826FEU31202AK (CONTROL #350672)WHICH REQUIRES OWNER ENGAGE A NYSPE &ENDRSD CNTRCTR TO EVAL THE ENTIRE FACADE&PERMANANTLY RPAIR UNDR PRMT, W/PERMTS FILED FOR 09/08/2026.AS OF 09/14/2026,NO RPAIR JOB FILING HAS BEEN INITIATED.COMPLY W/COMMI #FEU31201AK | DOB VIOLATION - ACTIVE |
| Jul 22, 2026 | CONSTRUCTION FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION # 070826CFEU31201AK(CONTROL#350671)WHICH REQUIRES OWNER TO IMMED STBLZE OR DEMO UNSTABLE PARAPET WALLS UNDR EMRGNCY WRK,W/MEANS&METHDS SUBMITD BY NYSPE TO FEU FOR APPRVL PRIOR TO STRT OF EMRGNCY WRK.AS OF 7/22/26, NO MEANS&METHDS FOR EMRGNCY #FEU31201AK | DOB VIOLATION - ACTIVE |
| Jul 8, 2026 | CONSTRUCTION FAILURE TO MAINTAIN.PER DOB RECORDS,FACADE IS IN A STATE OF DSRPAIR W/ CRCKS,SPALLNG,SHFTD MASONRY,BULGNG,&LEANING WALLS ARE IN A SEVERE STATE OF DSRPAIR,PARTICULARLY@TALL SECTIONS.OWNR TO ENGAGE NYSPE& ENDRSD CNTRCTR TO EVAL THE ENT FACADE& PERM RPAIR UNDR PRMT.FILE FOR PRMTS BY 9/8/26.SGN OFF RPAI #FEU31202AK | DOB VIOLATION - ACTIVE |
| Jul 8, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.PER ROB RECORDS,FACADE IS IN A STATE OF DSPAIR W/ CRCKS,SPALLNG,SHIFTD MASNRY BULGNG&LEANING WALLS.PARAPET WALLS ARE IN A STATE OF DSRPAIR,PRTICULARLY@TALL SECTIONS OF PARAPET.OWNR TO IMMED ENGAGE NYSPE&ENDRSD CNTRCTR TO IMMED INSTALL PUBLC&ADJ PROP PROTECTIONS/SFTY MEASURES AS #FEU31201AK | DOB VIOLATION - ACTIVE |
| Jul 8, 2026 | CONSTRUCTION FTM BUILDING: ATOI OBSERVED SEVERE FA ADE DEFECTS, THE PARAPET WALLS IN DISREPAIR, WALLS ARE OUT OF PLUMB, HAVE DAMAGED MORTAR JOINTS, STEP CRACKS , BULGING WALLS AND LEANING AFFECTING THE STRUCTURAL STABILITY OF THE BUILDING FA ADE. PROVIDED AN ENGINEER'S REPORT FOR BUILDINGS STRUCTURALLY COMPROMIS #26-01730 | DOB VIOLATION - ACTIVE |
| Jun 24, 2026 | CONSTRUCTION ATOI OBSERVED VIOLATING UNDER VIOLATION #39140550M WAS ISSUED 03/05/2025 REQUIRED ENGINEERING REPORT FOR CRACK BEAM THAT HAVE SEPARATED APART PROXIMATELY 2 INCHES WIDE BY 10 FEET LONG IN CENTER OF BEAM & BOTTOM PART ALSO CRACKED VERTICALLY. RELATED TO COMPLAINT #3A05249 #26-01653 | DOB VIOLATION - ACTIVE |
| Mar 5, 2025 | CONSTRUCTION OBSERVED CEILING REMOVED IN APT. D8 EXPOSING BEAMS. ONE OF THE BEAMS I N THE CENTER OF THE BEDROOM HAVE A CRACKED BEAM THAT HAVE SEPARATED AP PROXIMATELY 2 INCHES WIDE BY 10 FEET LONG IN CENTER OF BEAM & BOTTOM P ART ALSO CRACKED VERTICALLY. RELATED TO COMPLAINT #3A05249 #1201MM | DOB VIOLATION - ACTIVE |
| Oct 4, 2023 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #01838 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #04761 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #04760 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #05728 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #05885 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #05884 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #06570 | DOB VIOLATION - ACTIVE |
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #06569 | DOB VIOLATION - ACTIVE |
| Oct 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2013 INSPECTION/TEST #02250 | DOB VIOLATION - ACTIVE |
| Aug 27, 2013 | ELEVATOR #9027/486449 | DOB VIOLATION - ACTIVE |
| May 3, 2012 | FAILURE TO BENCHMARK FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 #02297 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 12, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Mar 17, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Oct 4, 2023 | AEUHAZ FTC-AEU-HAZ | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Oct 31, 2014 | Elevators EVCAT1 | Active |
| May 3, 2012 | Benchmarking - LL84 FTF-EN-BENCH | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 6, 2026 | I | 771 (I) §27-2096 HMC: PROPERTY REGISTRATION WAS FILED WITH FALSE OR INCOMPLETE INFORMATION RELATED TO THE PROPERTY CONTACTS. FILE WITH THIS DEPARTMENT A TRUE REGISTRATION STATEMENT FOR THE BUILDING. | — |
| Oct 23, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY | Nov 6, 2026 |
| Oct 23, 2026 | A | Apt E2 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT APT E2, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Jan 26, 2027 |
| Oct 23, 2026 | C | Apt E2 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT E2, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Nov 6, 2026 |
| Oct 23, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE , 1st STORY | Nov 6, 2026 |
| Oct 23, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT ENTRANCE , 1st STORY | Nov 6, 2026 |
| Oct 23, 2026 | B | Apt E2 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE WEST WALL IN THE BATHROOM LOCATED AT APT E2, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Nov 27, 2026 |
| Oct 23, 2026 | A | Apt F6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Jan 26, 2027 |
| Oct 23, 2026 | B | Apt F6 · § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Nov 27, 2026 |
| Oct 23, 2026 | B | Apt F6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Nov 27, 2026 |
| Aug 31, 2026 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF JAGGED GLASS CREATING CUT HAZARD AT REAR OF BUILDING YARD | Sep 6, 2026 |
| Aug 31, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT VESTIBULE DOOR , 1st STORY | Sep 6, 2026 |
| Aug 20, 2026 | B | § 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD AT PUBLIC HALL, SECTION ''WEST'' | Sep 24, 2026 |
| Aug 20, 2026 | C | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBAGE AND DEBRIS IN SOUTH REAR YARD YARD | Aug 26, 2026 |
| Aug 20, 2026 | B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Sep 24, 2026 |
| Aug 20, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING HOLE AT CONCRETE FLOOR AT SOUTH REAR YARD YARD | Aug 26, 2026 |
| Aug 20, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORY | Sep 3, 2026 |
| Aug 20, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORY | Sep 24, 2026 |
| Aug 20, 2026 | B | § 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD AT PUBLIC HALL, SECTION ''EAST'' | Sep 24, 2026 |
| Aug 12, 2026 | C | Apt A1 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Aug 26, 2026 |
| Aug 3, 2026 | B | Apt C7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C7, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt E8 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E8, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt E11 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E11, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ' | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt D11 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D11, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION A | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt C9 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C9, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION AT | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt E4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E4, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt B1 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B1, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION '' | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt B3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B3, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION '' | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt A4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A4, 1st STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt F8 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F8, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION '' | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt F9 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F9, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST , SECTION '' | Sep 7, 2026 |
| Aug 3, 2026 | B | Apt F10 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F10, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ' | Sep 7, 2026 |
| Jul 24, 2026 | B | § 27-2005 ADM CODE PROVIDE METAL SCREEN AT SKYLIGHT AT BULKHEAD , SECTION AT NORTH | Aug 28, 2026 |
| Jul 17, 2026 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jul 21, 2026 |
| Jul 17, 2026 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jul 21, 2026 |
| Jul 2, 2026 | A | Apt F6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Oct 5, 2026 |
| Jul 2, 2026 | A | Apt F6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE PRIVATE HALLWAY LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Oct 5, 2026 |
| Jul 2, 2026 | B | Apt F6 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, EAST WALL, 2nd CLOSET FROM SOUTH AT WEST WALL WALL, 2nd CLOSET FROM SOUTH AT WEST WALL CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT | Aug 6, 2026 |
| Jul 2, 2026 | A | Apt F6 · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RISER FROM SOUTH AT WEST WALL, 1st WALL CABINET FROM SOUTH AT WEST WALL IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Oct 5, 2026 |
| Jul 2, 2026 | A | Apt F6 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM WEST AT NORTH WALL IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Oct 5, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT BUILDING WEST AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT 1ST STACK FROM WEST AT BUILDING REAR AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT BUILDING EAST AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT 3RD STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE CELLAR | Aug 4, 2026 |
| Jun 30, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AT BUILDING FRONT ENTRANCE DOOR , 1st STORY | Aug 4, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT 2ND STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT 1ST STACK FROM EAST AT BUILDING FRONT AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | A | § 27-2014 ADM CODE AND DEPT. RULES AND REGULATIONS. SCRAPE AND REMOVE RUST SCALES AND PAINT WITH 2 COATS OF PAINT ALL STORIES, ALL BALCONIES AND ALL COMPONENTS AT 2ND STACK FROM WEST AT BUILDING REAR AT FIRE ESCAPE | Oct 3, 2026 |
| Jun 30, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DECORATIVE MASONARY STONE AT PARAPET BUILDING FRONT EXTERIOR WALL ABOVE 3RD WINDOW FORM EAST, 6TH STORY. WEST SECTION | Jul 6, 2026 |
| Jun 30, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR AND FRAME AT ENTRANCE DOOR TO BOILER ROOM IN CELLAR | Jul 14, 2026 |
| Jun 30, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING REAR YARD | Aug 4, 2026 |
| Jun 30, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICK AND MORTAR JOINTS AT BUILDING EXTERIOR SOUTH WALL ABOVE 1ST WINDOW FORM WEST, 5TH STORY. | Jul 6, 2026 |
| Jun 30, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Oct 3, 2026 |
| Jun 30, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING DEVICE AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORY | Jul 6, 2026 |
| Jun 29, 2026 | C | Apt F6 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Jul 13, 2026 |
| Jun 29, 2026 | B | Apt F6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE KITCHEN LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Aug 3, 2026 |
| Jun 29, 2026 | C | Apt F3 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH IN THE ENTRANCE LOCATED AT APT F3, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''WEST'' | Jul 13, 2026 |
| Jun 29, 2026 | A | Apt F6 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Oct 2, 2026 |
| Jun 29, 2026 | A | Apt F6 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MEDICINE CABINET AT EAST WALL IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Oct 2, 2026 |
Showing 60 of 267. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 23, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY | Open |
| Oct 23, 2026 | HPD A | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN THE BATHROOM LOCATED AT APT E2, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Open |
| Oct 23, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT E2, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Open |
| Oct 23, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT VESTIBULE , 1st STORY | Open |
| Oct 23, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT ENTRANCE , 1st STORY | Open |
| Oct 23, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK THE WEST WALL IN THE BATHROOM LOCATED AT APT E2, 5th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Open |
| Oct 23, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILINGS AND ALL WALLS THROUGHOUT IN THE ENTIRE APARTMENT LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Open |
| Oct 23, 2026 | HPD B | § 27-2026 ADM CODE REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Open |
| Oct 23, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE BATHROOM LOCATED AT APT F6, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION AT WEST | Open |
| Sep 14, 2026 | DOB | CONSTRUCTION: FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION #070826FEU31202AK (CONTROL #350672)WHICH REQUIRES OWNER ENGAGE A NYSPE &ENDRSD CNTRCTR TO EVAL THE ENTIRE FACADE&PERMANANTLY RPAIR UNDR PRMT, W/PERMTS FILED FOR 09/08/2026.AS OF 09/14/2026,NO RPAIR JOB FILING HAS BEEN INITIATED.COMPLY W/COMMI | Open |
| Aug 31, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF JAGGED GLASS CREATING CUT HAZARD AT REAR OF BUILDING YARD | Open |
| Aug 31, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT VESTIBULE DOOR , 1st STORY | Open |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD AT PUBLIC HALL, SECTION ''WEST'' | Open |
| Aug 20, 2026 | HPD C | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE GARBAGE AND DEBRIS IN SOUTH REAR YARD YARD | Open |
| Aug 20, 2026 | HPD B | § 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL. | Open |
| Aug 20, 2026 | HPD C | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING HOLE AT CONCRETE FLOOR AT SOUTH REAR YARD YARD | Open |
| Aug 20, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORY | Open |
| Aug 20, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT VESTIBULE DOOR , 1st STORY | Open |
| Aug 20, 2026 | HPD B | § 27-2005 ADM CODE PROVIDE APPROVED METAL SCREEN BELOW SKYLIGHT AT BULKHEAD AT PUBLIC HALL, SECTION ''EAST'' | Open |
| Aug 12, 2026 | DOB Safety | AEUHAZ: | Open |
| Aug 12, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT A1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''WEST'' | Open |
| Aug 3, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C7, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION '' | Open |
| Aug 3, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E8, 5th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION AT | Open |
| Aug 3, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E11, 5th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION ' | Open |
| Aug 3, 2026 | HPD B | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D11, 4th STORY, 2nd APARTMENT FROM NORTH AT EAST , SECTION A | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 4:40 AM ET. BBL 3056280001.