Bronx · Block 2578 · Lot 27 · 10455

470 Jackson Avenue

4 floors · 165,000 sq ft · built 1965 · class W1 · owner of record: Nyc Department Of Parks And Recreation

40open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
189dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 165,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028
Energy audit and retro-commissioning (2028) Likely applies
Local Law 87 · Calendar year 2028
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2578). Agency page

Dec 31, 2028
in 799 days
Next due 2028
Annual boiler inspection (3 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-16 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (22)
IssuedViolationHearingBalance
Jul 6, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING ANDOR FAULTY HARDWARE ON CLASSROOMS 308,303,304,300,200,204,205,206,210,2
#35734439R
Aug 7, 2026
POP/IN-VIO
$0
Jul 6, 2026Construction CLASS - 2
REISSUE ON ECB#35721330K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT LEVEL ON AUDITORIUM STAGE CMU WALLS ON THE LEFT AND RIGHT SIDE HAS VERY LARGE STEP CRACKS APPROX 10FT IN LENGTH O
#35734437N
Aug 7, 2026
POP/IN-VIO
$0
Jul 6, 2026Construction CLASS - 2
REISSUE ON ECB#35721329N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT SIGNS N
#35734438P
Aug 7, 2026
POP/IN-VIO
$0
Jul 6, 2026Construction CLASS - 2
REISSUE ON ECB#35721331M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 1ST FLOOR LIBRARY WITH NO E
#35734436L
Aug 7, 2026
POP/IN-VIO
$0
Jul 6, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:CRACKED WIRE MESH GLASS VISION PANELS ON FIRE RATED CLASSROOM AND SMOKE DOORS ONSTAIR A 3RD FLOOR EXIT 1 ROOM 206 2ND FL AND ROOM 112 1ST FLOOR OBSERV
#35734440Y
Aug 7, 2026
POP/IN-VIO
$0
Aug 6, 2025Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-542. NOTED: AT(1ST FL) LIBRARY WITH NO EMERGENCY AND EXIT SIGN
#35721331M
Aug 29, 2025
POP/IN-VIO
$0
Aug 6, 2025Construction CLASS - 2
REISSUE ECB #35688827Y. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1; 27-381. NOTED: AT(BASEMENT) AUDITORIUM, GYM, CAFETERIA E
#35721329N
Aug 29, 2025
POP/IN-VIO
$0
Aug 6, 2025Construction CLASS - 2
REISSUE ECB #35688829H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANTMANNER. NOTED: AT(BASEMENT) AUDITORIUM REAR AREA SIDEWALLS WITH CRACKED/STEP CRACKS. REMEDY: REPAIR AND/OR REPLACE.
#35721330K
Aug 29, 2025
POP/IN-VIO
$0
Aug 6, 2025Construction CLASS - 2
STAIR AND/OR FLOOR INDENTIFICATION SIGNS MISSING AND/OR DEFECTIVE. NOTED: SIGN IDENTIFICATIONS MISSING/NONE FOR ALL FLOORS THROUGHOUT VARIOUSLY. REMEDY: INSTALL AND/OR REPAIR SIGNS.
#35721333X
Aug 29, 2025
POP/IN-VIO
$0
Sep 30, 2024Construction CLASS - 2
REISSUE#35663528N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.EXISTING EMERGENCY LIGHT ARE NOT OPERATIONAL WHEN TESTED
#35688827Y
Dec 6, 2024
POP/IN-VIO
$0
Sep 30, 2024Construction CLASS - 2
REISSUE#35663527L FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT ROOFTOP,ARE IN DISREPAIR CONDTIONS,WATER BUILTUP LEAKS MISSING AGGRATE FOR TOPPING OF ROOF MATERIALS.REM:REPAIR/AND OR REPLACE.
#35688828X
Dec 6, 2024
POP/IN-VIO
$0
Sep 30, 2024Construction CLASS - 2
REISSUE#35663526J FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.AT AUDITORIUM,REAR AREA ON EACH SIDE WALLS SHOW CRACKS/STEP CRACKS.REM:REPAIR AND/OR REPLACE.
#35688829H
Dec 6, 2024
POP/IN-VIO
$0
Jun 6, 2023Construction CLASS - 2
REISSUE#35636434Z FIALURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. AT TIME OF MY INSPECTION I OBSERVED AT AUDITORIUM REAR OF STAGE ON THE RIGHT AND LEFT SIDE A STEP CRACK IN WALL VIOLATION #35636434Z ISSU
#35663526J
Nov 3, 2023
POP/IN-VIO
$0
Jun 6, 2023Construction CLASS - 2
REISSUE #35636431N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. ILLUMINATION FOR EXITS, EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381. AT THE TIME OF MY INSPECTION I OBSERVED 38 THROUGHOUT
#35663528N
Nov 3, 2023
POP/IN-VIO
$0
Apr 1, 2022Construction CLASS - 2
REISSUED#35557982Y.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTE AT AUDITORIUM REAR OF STAGE ON RIGHT AND LEFT SIDE STEP CRACK IN MORTAR.REMEDY:REPAIR AND/OR REPLACE.
#35636434Z
Jul 15, 2022
POP/IN-VIO
$0
Apr 1, 2022Construction CLASS - 2
REISSUED#35557984H.FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC1006.1;27-381.NOTE THROUGHOUT ENTIRE SCHOOL ON ALL FLOORS MOST EMERGENC
#35636431N
Jul 15, 2022
POP/IN-VIO
$0
Apr 22, 2021Construction CLASS - 2
REISSUED35473576K FALURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:NOTED:OBSERVED@AUDITORIUM REAR,STAGE CMU BLOCK WALLS(LEFT&RIGHT SIDE) HAVEDIAGONAL STEP CRACKS APPROX25'L.REPAIR &/OR REPLACE.
#35557982Y
Jul 16, 2021
POP/IN-VIO
$0
Apr 22, 2021Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODECOMPLIANT MANNER:ILLUMINATION FOR EXITS,EXIT DISCHARGES&PUBLIC CORRIDORS PER BC1006.1;27-381.NOTED:OBSERVED EXISTING EMERGENCY LIGHTS W/BATTERY BACKUP POWER@1FL EXIT1,2,5,7@BSMT
#35557984H
Jul 16, 2021
POP/IN-VIO
$0
Apr 22, 2020Construction CLASS - 2
REISSUE#35414635L FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE AT CELLAR LEVEL IN AUDITORIUM RIGHT & LEFT SIDE OF STAGE VERTICAL CRACKS IN WALL ALSO STOP CRACKS IN SAME AREAS. REMEDY: REPAIR & OR REP
#35473576K
Aug 7, 2020
POP/IN-VIO
$0
Apr 22, 2019Construction CLASS - 2
RE-ISSUE #35317421L.FAILURE TO MAINTAIN BLD.IN CODE COMPLIANT MANNER.NOTED:AT TIME OF INSPECTION I OBSERVED AT AUDITORIUM AREA LEFT & RIGHT STAGE VERTICAL STEPS CRACKED MASONRY IN THE WALL NEED TO MAKE REPAIRS,
#35414635L
Aug 2, 2019
POP/IN-VIO
$0
Mar 13, 2018Construction CLASS - 2
REISSUE VIOLATION #35253073Y ISSUED 4/27/17. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTE: AT AUDITORIUM AREA LEFT AND RIGHT STAGE VERTICAL STEPS CRACKED MASONRY IN THE WALL. REM: REPAIR AND/OR R
#35317421L
Jun 1, 2018
POP/IN-VIO
$0
Apr 27, 2017Construction CLASS - 2
FAILURE TO MAINTAIN BLDG IN CODE COMPLAINT MANNER. NOTED: AT AUDITIRIUM AREA,LEFT & RIGHT STAGE VERTICAL STEPS CRACKED MASONRY IN THE WALL. REMEDY: COMPLY W/CODE/REPAIR THE CRACKS.
#35253073Y
Jun 16, 2017
POP/IN-VIO
$0
DOB (6)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05847
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05846
DOB VIOLATION - ACTIVE
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#05845
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#40409
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#40410
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#45091
DOB VIOLATION - ACTIVE
DOB NOW Safety (12)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 6, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATEDCLASSROOMS AND SMOKE DOORS NOT SELF CLOSING DUE TO BINDING,MISSING ANDOR FAULTY HARDWARE ON CLASSROOMS 308,303,304,300,200,204,205,206,210,2Open
Jul 6, 2026ECBConstruction: REISSUE ON ECB#35721330K FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT BASEMENT LEVEL ON AUDITORIUM STAGE CMU WALLS ON THE LEFT AND RIGHT SIDE HAS VERY LARGE STEP CRACKS APPROX 10FT IN LENGTH OOpen
Jul 6, 2026ECBConstruction: REISSUE ON ECB#35721329N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT SIGNS NOpen
Jul 6, 2026ECBConstruction: REISSUE ON ECB#35721331M FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.LACK OF EMERGENCY LIGHTING FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-542.NOTED:AT 1ST FLOOR LIBRARY WITH NO EOpen
Jul 6, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:CRACKED WIRE MESH GLASS VISION PANELS ON FIRE RATED CLASSROOM AND SMOKE DOORS ONSTAIR A 3RD FLOOR EXIT 1 ROOM 206 2ND FL AND ROOM 112 1ST FLOOR OBSERVOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 10:09 AM ET. BBL 2025780027.

Look up another building