Brooklyn · Block 1580 · Lot 1 · 11206

47 Marcous Garvey Blvd

7 floors · 1099 apartments · 924,915 sq ft · built 1951 · class D1 · owner of record: Nyc Housing Authority

26open violations
$20,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 63 days
Annual
Annual boiler inspection (6 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-15 (Accepted). Agency page

Dec 31, 2026
in 63 days
6 of 6 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 79 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 924,915 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1580). Agency page

Dec 31, 2030
in 1524 days
Next due 2030
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page

On fileCycle 10 filing on record: UNSAFE (2026-04-03)

Open violations

ECB / OATH (4) · $20,000 owed
IssuedViolationHearingBalance
May 6, 2026Construction CLASS - 1
FAILURE TO TAKE REQUIRED MEASURES TO SECURE PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE AS PER 1RCNY 103-04.UNSAFE NOTIFICATION#UNSAFE-1009357-10B-001,DATED 03/26/2026 FILED BY QEWI(PE/RA)DOCUMENTED UNSAFE FACA
#35729818K
May 28, 2026
POP/IN-VIO
$0
Jul 10, 2025Unknown CLASS - 2
CS ALLOWED WORKERS TO WORK ON SOE /CONFINED SPACE W/OUT PROPER MEANS OF EGRESS/ INGRESS, MISSING GUARDRAILS, CAZ, SIGNS, LIGHTS, NO SAFE PROTOCOLS RECORDED/ DOCUMENTED. WORK AREA IS DETRIMENTAL ZONE FOR WORKERS
#39542236X
Apr 16, 2027
PENDING
$10,000
Jul 10, 2025Construction CLASS - 2
OBSERVED A DEEP SOE W/ WOOD SHORING COVERED BY PLYWOOD CREATING CONFINED SPACE , ONLY 1 EXTENSION LADDER FOR EGRESS/ INGRESS. WORK BEING PERFOMED UNDER HIGH TEMPERATURES. WORK AREA & STRUCTURE IS A DETRIMENTAL
#39542253H
Apr 16, 2027
PENDING
$10,000
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #909352. REMEDY: SUBMIT ACCEPTABLE REQU
#37027354H
May 7, 2024
POP/IN-VIO
$0
DOB (5)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#00452
DOB VIOLATION - ACTIVE
May 10, 2019FACADE SAFETY PROGRAM

#HAZ88177
DOB VIOLATION - ACTIVE
Dec 4, 2013LL11/98-LOCAL LAW 11/98 - FACADE
CYCLE 7 UNSAFE REPORT FILED
#HAZ74860
DOB VIOLATION - ACTIVE
Jul 8, 2013LL11/98-LOCAL LAW 11/98 - FACADE
CYCLE 7 UNSAFE REPORT FILED
#HAZ7
DOB VIOLATION - ACTIVE
Mar 17, 2010LL11/98-LOCAL LAW 11/98 - FACADE

#HAZ2736
DOB VIOLATION - ACTIVE
DOB NOW Safety (9)
IssuedViolationStatus
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
May 10, 2019Facades FISP
CYCLE 8B UNSAFE REPORT FILED
Active
Dec 4, 2013Facades LL11/98
CYCLE 7 UNSAFE REPORT FILED
Active
Mar 17, 2010Facades LL11/98
CYCLE 6 UNSAFE REPORT FILED
Active
HPD (8) · C 0 · B 8 · A 0
IssuedClassViolationCorrect by
Nov 14, 2016BApt 1E · § 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT SOUTH WALL APPROX 10 SQ. FT. IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2016
Nov 14, 2016BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2016
Nov 14, 2016BApt 1E · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING WOOD CABINET AT SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2016
Nov 14, 2016BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2016
Nov 14, 2016BApt 1E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2016
Nov 14, 2016BApt 1E · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF ODOR FROM SOUTH WALL IN THE KITCHEN LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FROM NORTH AT EASTDec 19, 2016
Jan 13, 2009BApt 4A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL RECEPTACLE AT WEST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 4A, 4th STORY, APARTMENT AT EASTFeb 17, 2009
Jan 13, 2009BApt 4A · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRICAL RECEPTACLE AT WEST WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4A, 4th STORY, APARTMENT AT EASTFeb 17, 2009

Issued in the last 120 days

DateSourceWhatNow
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Closed
Jul 16, 2026DOB SafetyFacades: Unsafe 10B report filedClosed
Jul 16, 2026DOB SafetyFacades: Unsafe 10B report filedClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 2:00 PM ET. BBL 3015800001.