7 floors · 11,635 sq ft · built 1920 · class K4 · owner of record: C K D Division Realty
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $1,141,450 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2029 in 852 days | Filing window not open yet |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-09-24 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 21, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED 7 STORY BUILDING WITH SIDEWALK SHED INSTALLED AT EXP #1 UPON REVIEWING OF BIS AND DOBNOW SYSTEM REVEALED TEMPORARY CONSTRUCTION EQUIPMENT ON SITE PERMIT M00695947-I1-SH EXPIRED 0 #39553226X | Jun 25, 2026 DEFAULT | $6,250 |
| Apr 20, 2026 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C AND 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #800600. AGG2 HISTORY OF NONCOMPLIANCE O #37036454J | Jul 16, 2026 DEFAULT | $10,000 |
| Apr 8, 2025 | Local Law CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #900600. REMEDY: SUBMIT ACCEPTABLE REQU #37034525Z | Jul 24, 2025 DEFAULT | $10,000 |
| Sep 16, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTED:OBSERVED THERE ARE CRACKS AT MULTIPLE LOCATION AT EXP 1(N.ELEV)AND A SPALLING DECORATIVE STONE AT PARAPET LEVEL.ALSO OBSERVED AT EXP 4(W.ELEV #35686263Z | Dec 19, 2024 ADMIT/IN-VIO | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C AND 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#800600.AGG1:PRIOR NOV 37022169N UNDER 28 #37026104K | Apr 11, 2024 IN VIOLATION | $0 |
| Oct 8, 2021 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7C & 8C REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#800600. REMEDY: FILE ACCEPTABLE REPORT. #37022169N | Mar 3, 2022 ADMIT/IN-VIO | $0 |
| Mar 7, 2018 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #700600. AGG2 HISTORY OF NONCOMPLIANCE ON 3602353 #37009308H | May 24, 2018 IN VIOLATION | $0 |
| Jun 30, 2016 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BLDG NORTH ELEV EXP1 COPING CHIPPERS AT PARAPET 7 FLR HEADER EVIDECE OF RUSTING 4 FLOOR WOOD ON WINDOW SILL. WEST ELEV. EXP4 TOP FLOOR A/C UNIT MISSING BRACKET-WINDOW DOOR RUSTING #35174582R | Aug 18, 2016 IN VIOLATION | $0 |
| Nov 2, 2015 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:36026711X.PERIODIC INSP OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB RULES & REGULATIONS.REM:FILE THE #36023531P | Mar 17, 2016 DEFAULT | $0 |
| Dec 12, 2014 | Local Law CLASS - 2 FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULAT #36026711X | Aug 6, 2015 DEFAULT | $0 |
| Nov 21, 2008 | Construction CLASS - 2 FAILURE TO SUBMIT AN ACCEPTABLE SIXTH ROUND TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28.302 AND THE DOB RULES AND REGULATIONS #36001206Y | Apr 16, 2009 IN VIOLATION | $0 |
| Mar 20, 1992 | Local Law Non-Hazardous FAILURE TO PROVIDE ELEVATOR SIGNS. FLOOR NUMBER SIGNS MISSING. STAIR&ELEVATOR I.D. SIGNS MISSING. REMEDY:INSTALL SIGNS AS PER CODE LL16/84. #34064625Y | May 7, 1992 WRITTEN OFF | $0 |
| Feb 6, 1991 | Boilers Hazardous 3A,46A,32,32GAGE GLASS TO BE FITTED WITH STOP VALVE AND DRAIN PIPE UNDERNEATH #32008159R | Mar 21, 1991 WRITTEN OFF | $0 |
| Aug 2, 1988 | Boilers Unknown #32000760L | Sep 22, 1988 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jan 29, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED DEFECTED CONDITIONS: EXPOSURE 1: CRACK STUCCO AT 3FL AT AREA OF WINDOW LINTEL. EXPOSURE 4: CRACK WINDOW PANE AT THE 6FL AND SPALLING AT THE PARAPET. REMEDY: REPAIR AND/OR REPLACE #SR0303NS | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00013 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #00801 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #01854 | DOB VIOLATION - ACTIVE |
| Aug 14, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AS NOTED,I OBSER VED AT THE TIME OF MY INSPECTION,CRACKS AND SPALLING STUCCO/MASONRY AT 3RD FL SPANDRELS ON EXP1 WEST ELEV.ALSO AT EXP# WEST ELEV,I OBSERVED I ON THE 8TH FL LINTEL CRACKS AT LINTEL SEALANT JOINT.EXP4 SOUTH ELEV CR ACK IN MORTAR JO #SR0302RF | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #00855 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00017 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #01908 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00033 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION #03486 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION #04676 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION #02351 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION #01121 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #01188 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #20876 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #04774 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION #03581 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #02444 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION #01169 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION #06252 | DOB VIOLATION - ACTIVE |
| Apr 25, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION #00020 | DOB VIOLATION - ACTIVE |
| Dec 17, 2021 | NON-RESIDENTIAL ELEVATOR PERIODIC INSPECTION/TEST FAILURE TO PERFORM CATEGORY 5 INSPECTION #00124 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION #00020 | DOB VIOLATION - ACTIVE |
| Mar 16, 2020 | HIGH PRESSURE BOILER VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION #00018 | DOB VIOLATION - ACTIVE |
| Jun 17, 2019 | ELEVATOR #9027/651167 | DOB VIOLATION - ACTIVE |
| Jun 10, 2018 | FACADE SAFETY PROGRAM #HAZ77492 | DOB VIOLATION - ACTIVE |
| Jun 1, 2018 | FACADE SAFETY PROGRAM #HAZ87493 | DOB VIOLATION - ACTIVE |
| Apr 6, 2018 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT #01131 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #00816 | DOB VIOLATION - ACTIVE |
| Dec 31, 2013 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 #00407 | DOB VIOLATION - ACTIVE |
| Nov 30, 2007 | LOCAL LAW 11/98 - FACADE #NRF42112 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #01253 | DOB VIOLATION - ACTIVE |
| Jan 6, 2006 | LOCAL LAW 62/91 - BOILERS #01198 | DOB VIOLATION - ACTIVE |
| Jan 31, 2005 | LOCAL LAW 62/91 - BOILERS #03936 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #04056 | DOB VIOLATION - ACTIVE |
| Feb 13, 2004 | LOCAL LAW 62/91 - BOILERS #01446 | DOB VIOLATION - ACTIVE |
| Mar 19, 2003 | LOCAL LAW 62/91 - BOILERS #00377 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #00420 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #00391 | DOB VIOLATION - ACTIVE |
| Feb 1, 2001 | CONSTRUCTION #03RS01 | VIOLATION WORK WITHOUT PERMIT - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #00380 | DOB VIOLATION - ACTIVE |
| Mar 16, 1999 | LOCAL LAW 62/91 - BOILERS #00365 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #164062 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #00608 | DOB VIOLATION - ACTIVE |
| Sep 1, 1994 | LOCAL LAW 62/91 - BOILERS #04604 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Apr 25, 2023 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT | Active |
| Apr 25, 2023 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Dec 17, 2021 | Elevators EVCAT5 | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Mar 16, 2020 | Boiler HBLVIO VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION | Active |
| Jun 10, 2018 | Facades FISP CYCLE 7C UNSAFE REPORT FILED | Active |
| Jun 1, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Apr 6, 2018 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Dec 31, 2013 | Facades FISPNRF FAILED TO FILE FISP CYCLE 7C TECHNICAL REPORT BY 02/21/2013 | Active |
| Nov 30, 2007 | Facades LL1198 CYCLE 6 NO REPORT FILED | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 6, 2006 | Boiler LL6291 | Active |
| Jan 31, 2005 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Feb 13, 2004 | Boiler LL6291 | Active |
| Mar 19, 2003 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| Mar 16, 1999 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Sep 1, 1994 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)