1 floors · 1,280 sq ft · built 1931 · class G2 · owner of record: Arslan Realty Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 410 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 3, 2007 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALL. NOTED: MASONRY EXTENSION @ REAR OF MAIN BLDG APPROX. 24 FT 12FT X 10FT HIGH HAS REAR WALL & ROOF IN DISREPAIR CONDITION- CRACKS, ROTTEN JOISTS . REMEDY: MAINTAIN BLDG #34613062Z | Dec 3, 2007 WRITTEN OFF | $0 |
| Jul 9, 2007 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALL. NOTED: MASONRY EXTENSION AT REAR OF MAIN BLDG APPROX 24'X12'X10' HIGH- ITS REAR WALL & ROOF SYSTEM IS IN DANGER OF COLLAPSE. RATTERS ATTACHED TO MAIN BLDG SUPPORTED BY 6" #34573330M | Apr 7, 2008 WRITTEN OFF | $0 |
| Jul 23, 1991 | Construction Non-Hazardous FAILURE TO MAINTAIN:METAL CEILING AND CEILING BEAMS ARE SAGGING BETWEEN TWO SKYLIGHTS FOR AN AREA OF APPROXIMATELY 6'-0"X24'-0"/144 S F)ONE SKYLIGHT GRATING APPROXIMATELY 4'-0"X4'-0" IS NOT FASTENED SECURELY AN #34060163K | Sep 16, 1991 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 26, 2001 | CONSTRUCTION FAILLURE TO MAINTAIN BUILDING: DEFECT NOTED EXCESSIVE DEBRIS LEFT ON SITE (IN FRONT OF BUILDING AT BOTH SIDES) STORAGE OF CARS TRUCK (4 TOTAL 2 CARS 2 TRUCKS) REMEDY: REMOVE EXCESSIVE DEBRIS #12EC08 | DOB VIOLATION - ACTIVE |
| Jun 26, 2001 | CONSTRUCTION OCCUPANCY CONTRARY TO THAT ALLOWED BY BUILDING DEPARTMENT RECORDS ILLEGAL USE NOTED: LOT BEING USE FOR DEAD STORAGE DEPARTMENT OF BUILDING DOES NOT ALLOW (DEAD)STORAGE NOTED 4 VEHICLES 2 CARS 2 TRUCKS REMEDY: REMOVE VEHICLE DISCONTINUE ILLEGAL USE #12EC09 | DOB VIOLATION - ACTIVE |
| Jun 26, 2001 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING HAZARDOUS DEFECT NOTED: BUILDING IS VACANT OPEN UNGUARDED IS CREATING A HAZARDOUS UNSAFE CONDITION TO THE PUBLIC PROPERTY. REMEDY: MAKE PROPERTY SAFE MAKE ALL NECESSARY REPAIRS SUBMIT ENGINEERS REPORT FOR THE STRUCTURAL INTEGRITY OF BUILDING #12EC10 | DOB VIOLATION - ACTIVE |
| Oct 7, 1997 | ZONING #12TM02 | DOB VIOLATION - ACTIVE |
| Apr 30, 1992 | CONSTRUCTION #12W01 | DOB VIOLATION - ACTIVE |
| May 7, 1991 | CONSTRUCTION #12W02 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 18, 2008 | B | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF STORAGE AUTOMOBILE AND DISUSED AUTO PARTS AND BLDG MATERIAL FRONT YARD. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE METAL CEILING BATHROOM 1ST STORY APT 1. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALL BATHROOM 1ST STORY APT 1. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR KITCHEN 1ST STORY APT 1. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE SAFFING TILE FLOOR BATHROOM 1ST STORY APT 1. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2026 ADMIN. CODE: REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WATER CLOSET BATHROOM 1ST STORY APT 1. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM 1ST STORY APT 1. | Jul 23, 2008 |
| Jun 18, 2008 | A | SECTION 27-2026 ADMIN. CODE: REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS BATHTUB FIXTURE BATHROOM 1ST STORY APT 1. | Sep 21, 2008 |
| Jun 18, 2008 | C | SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM 2ND STORY APT. | Jun 24, 2008 |
| Jun 18, 2008 | B | SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE EAST AND WEST COURTS AND REAR YARD. | Jul 23, 2008 |
| Jun 18, 2008 | B | SECTION 27-2010, 2011, 2012 ADMIN. CODE: REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE REAR YARD. | Jul 23, 2008 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 1:15 AM ET. BBL 3053130031.