1 floors · 17,090 sq ft · built 1949 · class K1 · owner of record: Hansu Enterprises Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 432 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-18 (Pre-Filing-Pending Payment). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 28, 2025 | Construction CLASS - 3 OCCUPANCY CONTRARY TO DEPARTMENT RECORDS. AT TIME OF INSPECTION SVHEDULE A NOTED ACCESSORY PARKING FOR 8 VEHICLES, DURING INSPECTION IT WAS OBSERVED TO BE APPROXIMATELY 20 CARS IN LOT., DISCONTINUE ILLEGAL OCCU #39152274N | Oct 23, 2026 PENDING | $500 |
| Dec 12, 2024 | Boilers CLASS - 2 FULTON FB10A HP BOILER WITH CORRODED LOWER RIGHT SIDE HAND HOLE SLEEVE. CORRECT VIOLATING CONDITION AND SUBMIT A CERTIFICATE OF CORRECTION. #39132777R | Feb 18, 2025 ADMIT/IN-VIO | $0 |
| Jul 30, 2024 | Construction CLASS - 2 WORK WITHOUT A PERMIT, NOTED AT REAR OF BUILDING. ERECTED A WOODEN FRAME STRUCTURE CREATING A STORAGE SHED. SHED MEASURES APPROX. 10FT X 12FT X 9FT. SHED APPEARS TO BE 100% FINISHED WITH DOOR, FLOORING, SIDING, #39120266R | Dec 3, 2024 IN VIOLATION | $0 |
| Jul 29, 2023 | Construction CLASS - 2 WORK WITHOUT A PERMIT. NOTED: AT REAR OF PREMISES ERECTED CANOPY APPROX. 60FT L X 30FT W X 15FT H 6 WOODEN POST & BEAMS WITH CLEAR PLASTIC CORRUGATED ROOF. INSTALLED ELECTRICAL WIRING FOR LIGHTS., OBTAIN ALL PE #39091333H | May 7, 2024 IN VIOLATION | $0 |
| Aug 12, 2008 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. LACK OF EMERGENCY LIGHTING FOR EXITS, EXIT DISCHARGE AND PUBLIC CORRIDORS PER BC 1006.1;27-542 INSP(DWG) 07-25-05 FOR JOB ALT II #402178157 OF WHICH PERMIT #34693673K | Oct 7, 2008 IN VIOLATION | $0 |
| Aug 12, 2008 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER; IMPROPER EXIT/EXIT ACCESS DOORWAY ARRANGEMENT PER BC 1014.2; 27-361 FOR JOB ALT II #402178157. AT THE TIME OF INSPECTION FOUND IMPROPER HARDWARE HARDWARE ON #34693674M | Oct 7, 2008 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION #00287 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION #01494 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION #03885 | DOB VIOLATION - ACTIVE |
| Jul 15, 2005 | CONSTRUCTION #111M | DOB VIOLATION - ACTIVE |
| Jan 18, 1990 | CONSTRUCTION MIPERRO #11M1 | DOB VIOLATION - ACTIVE |
| May 25, 1989 | CONSTRUCTION MP #11M2 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 11) | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2021 Internal Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-INT-HP Violation Issued-Failure To File 2020 Internal Inspection Affirmation of Correction for HP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-HP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for HP Device | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 6:05 PM ET. BBL 4073300023.