2 floors · 1 apartments · 4,684 sq ft · built 1931 · class K4 · owner of record: 463 Saddle Up Tremon
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 43 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 43 days | Keep the report on file (not filed with DOB) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 14, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. PROPERTY IS ASEMI ATTACHED 2+C COMMERCIAL USE BUILDING LOCATED ON AN INTERIOR LOT. OBSERVED BRICK MASONRY BULGING AND SEVERAL MASONRY CRACKS AT PARAPET. #35718661H | Dec 18, 2026 PENDING | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Oct 14, 2026 | CONSTRUCTION FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD BRICK MASONRY BULGING AND SEVERAL MASONRY CRACKS AT PARAPET OF EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024 SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 10/28/2026 #PI20604SB | DOB VIOLATION - ACTIVE |
| Oct 14, 2026 | CONSTRUCTION CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 MASONRY CRACKS AT PARAPET & AN AREA OF BRICKS BULGING NEAR EXP1/2 PARAPET. AT EXP1 OBSVD CRACKED WINDOW SILLS,SPALLING BRICKS W/DETERIORATED MORTAR JOINTS. OWNER TO RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB & NYS TO EVAL ENTIRE BLDG & SUBMIT A CORREC #PI20603SB | DOB VIOLATION - ACTIVE |
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 17, 2015 | B | Apt 2NDFL · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT #4 AT NORTH WEST , IN APT.1 AT 2ND STORY'' IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY | Apr 21, 2015 |
| Mar 17, 2015 | B | Apt 2NDFL · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT #7 AT NORTH EAST , IN APT.1 AT 2ND STORY'' IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY | Apr 21, 2015 |
| Mar 17, 2015 | B | Apt 2NDFL · § 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY | Apr 21, 2015 |
| Mar 17, 2015 | B | Apt 2NDFL · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT #6 AT NORTH WEST , IN APT.1 AT 2ND STORY'' IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY | Apr 21, 2015 |
| Mar 17, 2015 | B | Apt 2NDFL · § 27-2077 ADM CODE - DISCONTINUE THE ROOMING UNIT #1 AT NORTH EAST IN APT.1 AT 2ND STORY'' IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFL, 2nd STORY | Apr 21, 2015 |
| Dec 18, 2014 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXURE AT PUBLIC HALL STAIRS, 1st STORY | Jan 22, 2015 |
| Dec 18, 2014 | A | Apt 3 · § 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FRO | Mar 23, 2015 |
| Dec 18, 2014 | B | Apt 3 · § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF PARTITION WALLS ERECTED CREATING BATHROOM AT SCUTTLE COVER IN THE ENTIRE APARTMENT LOCATED AT APT 3, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Jan 22, 2015 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 14, 2026 | DOB | CONSTRUCTION: FTM BLDG IN A CODE COMPLIANT MANNER-OBSVD BRICK MASONRY BULGING AND SEVERAL MASONRY CRACKS AT PARAPET OF EXP1. AN ANNUAL PARAPET OBSERVATION REPORT IS REQ'D TO BE COMPLETED ANNUALLY STARTING IN 2024 SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR 2025 TO BE REC'D BY DOB NO LATER THAN 10/28/2026 | Open |
| Oct 14, 2026 | DOB | CONSTRUCTION: CORRECTIVE ACTION PLAN REQ'D-OBSVD AT EXP1 MASONRY CRACKS AT PARAPET & AN AREA OF BRICKS BULGING NEAR EXP1/2 PARAPET. AT EXP1 OBSVD CRACKED WINDOW SILLS,SPALLING BRICKS W/DETERIORATED MORTAR JOINTS. OWNER TO RETAIN REG DESIGN PROF IN GOOD STANDING WITH DOB & NYS TO EVAL ENTIRE BLDG & SUBMIT A CORREC | Open |
| Oct 14, 2026 | ECB | Construction: FAILURE TO MAINTAIN BUILDING IN A CODE-COMPLIANT MANNER. PROPERTY IS ASEMI ATTACHED 2+C COMMERCIAL USE BUILDING LOCATED ON AN INTERIOR LOT. OBSERVED BRICK MASONRY BULGING AND SEVERAL MASONRY CRACKS AT PARAPET. | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 18, 2026, 6:45 PM ET. BBL 2030340049.