Bronx · Block 5078 · Lot 61 · 10470

4621 Carpenter Avenue

2 floors · 3 apartments · 2,930 sq ft · built 1920 · class C0 · owner of record: Bkbx01 Investors Inc

12open violations
$17,590ECB/OATH penalties owed
1HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 65 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 65 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 81 days
Annual
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 430 days
Next cycle year 2027

Open violations

ECB / OATH (4) · $17,590 owed
IssuedViolationHearingBalance
Jul 10, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MATTER; NOTED AT EXPOSURE 2 STEP CRACKS IN BRICK WORK BETWEEN SECOND AND FIRST FLOOR WINDOW AT MIDDLE OF BUILDING., REPAIR AND/OR REPLACE
#39195711M
Sep 18, 2026
DEFAULT
$1,280
Jul 10, 2026Construction CLASS - 1
WORK WITHOUT PERMIT; NOTED AT EXTERIOR OF BUILDING AT EXPOSURE 2 INSTALLED ELECTRICAL LINES FOR 7 FUJITSU SPLIT COOLING AND HEATING SYSTEM ALL WITH DISCONNECTED BOXES., OBTAIN PERMIT
#39195721X
Sep 18, 2026
DEFAULT
$2,530
Jul 9, 2026Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT SECOND FLOOR REAR APARTMENT AT FRONT BEDROOM HAS CRACKS AND BULGE IN WALL AT RIGHT SIDE OF WINDOW., REPAIR AND/OR REPLACE
#39195712Y
Sep 18, 2026
DEFAULT
$1,280
Feb 13, 2026Construction CLASS - 1
OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORDS. ILLEGAL CLASS "A" APARTMENT CREATED AT CELLAR, WITH FULLBATHROOM AND KITCHEN. VACATE RECOMMENDED DUE TO NO 2ND MEANS OF EGRESS
#35724220N
Aug 21, 2026
DEFAULT
$12,500
DOB (0)

None open.

DOB NOW Safety (1)
IssuedViolationStatus
Jan 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle D (premises is in Community District 12)
Active
HPD (7) · C 1 · B 5 · A 0
IssuedClassViolationCorrect by
Feb 20, 2026I§ 27-2142 ADM CODE APTS HAVE BEEN VACATED BY THIS DEPARTMENT AND CANNOT BE REOCCUPIED UNTIL SO ORDERED AFTER PROOF OF COMPLIANCE FOR APTS APARTMENT AT CELLAR UNDER VACATE ORDER #260455 DATED 02/20/2026—
Apr 26, 2016B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE RIGHT HAND HANDRAIL AT VESTIBULE , 1st STORYMay 31, 2016
Oct 8, 2015CApt 2B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st RADIATOR FROM NORTH AT EAST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT Nov 19, 2015
Dec 19, 2011BApt 1 · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE MARBLE SADDLE AT ENTRANCE DOOR LOCATED AT APT 1, 1st STORYJan 23, 2012
Dec 19, 2011BApt 1 · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRIC OUTLET COVER AT NORTH WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORYJan 23, 2012
Dec 19, 2011BApt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORYJan 23, 2012
Dec 19, 2011BApt 1 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORYJan 23, 2012

Issued in the last 120 days

DateSourceWhatNow
Jul 10, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MATTER; NOTED AT EXPOSURE 2 STEP CRACKS IN BRICK WORK BETWEEN SECOND AND FIRST FLOOR WINDOW AT MIDDLE OF BUILDING., REPAIR AND/OR REPLACEOpen
Jul 10, 2026ECBConstruction: WORK WITHOUT PERMIT; NOTED AT EXTERIOR OF BUILDING AT EXPOSURE 2 INSTALLED ELECTRICAL LINES FOR 7 FUJITSU SPLIT COOLING AND HEATING SYSTEM ALL WITH DISCONNECTED BOXES., OBTAIN PERMITOpen
Jul 9, 2026ECBConstruction: FAILURE TO MAINTAIN BUILDING IN CODE COMPLAINT MANNER; NOTED AT SECOND FLOOR REAR APARTMENT AT FRONT BEDROOM HAS CRACKS AND BULGE IN WALL AT RIGHT SIDE OF WINDOW., REPAIR AND/OR REPLACEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 4:16 PM ET. BBL 2050780061.

Look up another building