Brooklyn · Block 4803 · Lot 6 · 11203

460 Midwood Street

3 floors · 6 apartments · 4,500 sq ft · built 1931 · class S5 · owner of record: 579 Brooklyn Llc

8open violations
$875ECB/OATH penalties owed
0HPD class C (immediately hazardous)
51dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 9 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 51 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 51 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 51 days
Annual
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-07-10 (Accepted). Agency page

Dec 31, 2026
in 51 days
1 of 1 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 67 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 295 days
Registered through 2027-09-01

Open violations

ECB / OATH (2) · $875 owed
IssuedViolationHearingBalance
May 3, 2022Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALLS OR APPURTENANCES: AT TIME OF INSPECTION, THE BRICK VENEER AT EXP-2 & THE MASONRY FACADE AT EXP-4 EXHIBITS DIAGONAL & VERTICAL CRACKING ABOVE THE 3RD FLOOR WINDOWS & EXTENDS TO
#39061507L
Sep 7, 2022
IN VIOLATION
$625
May 3, 2022Construction CLASS - 3
FAILURE TO MAINTAIN BUILDING & PARTS THEREOF IN A CODE COMPLIANT MANNER: AT TIME OF INSPECTION, THE FRAME OF THE CELLAR WINDOW AT EXP-4 WAS OBSERVED UNSEALED/BROKEN., REPAIR AND OR REPLACE; REPAIR AND/OR REPLAC
#39061506J
Mar 27, 2023
IN VIOLATION
$250
DOB (2)
IssuedViolationStatus
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#11232
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#16471
DOB VIOLATION - ACTIVE
DOB NOW Safety (5)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 9)
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Apr 25, 2002BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR WALLS AND CEILINGS IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, APARTMENT AT EASTJun 4, 2002

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 10, 2026, 8:53 PM ET. BBL 3048030006.

Look up another building