Manhattan · Block 1726 · Lot 61 · 10027

46 West 129 Street

6 floors · 29 apartments · 32,342 sq ft · built 1920 · class D1 · owner of record: West 128th Street L.P.

60open violations
$16,624ECB/OATH penalties owed
9HPD class C (immediately hazardous)
50dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 32,342 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 781 days
Next cycle year 2028
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-03-07 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (11) · $16,624 owed
IssuedViolationHearingBalance
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7A AND 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #813659. AGG1: PRIOR NOV 37026206L UNDER
#37036507Y
Jul 16, 2026
DEFAULT
$10,000
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7A AND 8A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #813659. REMEDY: FILE ACCEPTABLE REPORT.
#37026206L
Aug 13, 2024
DEFAULT
$374
Dec 2, 2022Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL#913659. REMEDY:SUBMIT ACCEPTABLE REQUIR
#37024384P
Oct 12, 2023
DEFAULT
$6,250
Nov 3, 2016Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG NORTH ELEV EXP 1.OBJECTS ON FIRE ESCAPE A/C UNIT 4TH FL BOARD ON FIRE ESCAPE 4TH FL.NORTHWEST CORNER-CORNER-UNDER/BELOW BRICK WORK DEFECTIVE MORTAR DEFECTIVE-TRANSITIONAL STONE
#35174000H
Dec 22, 2016
IN VIOLATION
$0
Aug 11, 2016Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE 7TH ROUND REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALLS & APPURTENANCES REQUIRED BY 28-302.4. AGG2 HISTORY OF NONCOMPLIANCE ON 36027941X(AGG1),36019043Y.
#37001066H
Dec 29, 2016
IN VIOLATION
$0
Apr 25, 2016Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG ROOF NORTH ELEV. EXP.1 BOILER CHIMNEY CRACKED PARAPET STUCCO BULDING & VERTICLE CRACKS EAST ELEV 2 - VERTICLE CRACK IN NORTH / EAST CORNER IN TRANSITIONAL MASONRY SOUTH ELEV. E
#35174276Z
Aug 11, 2016
DEFAULT
$0
Nov 14, 2015Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING.AS NOED: AT TIME OF INSPECTION OBSERVED AT EXP#4, 7TH FLR DETERIORATED BRICK/JOINTS AND PEELING WATERPROOFING. AND FILE REPORT AS PER 1RCNY 103-04. RMDY: MAINTAIN EXTERIOR
#35160145L
Dec 31, 2015
STIPULATION/IN-VIO
$0
Oct 8, 2015Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG 6 FL TRANSITIONAL CORNER.(NW CORNER)BRICK TO STONE TRIM-MASONRY TRIM DISLODGED MISSING MORTAR.WEST ELEV EXP4-SPALLING BRICK-MISSING MORTAR CONTAINERS ON 5FL WINDOW SILL.IMMEDIA
#35133736J
Dec 17, 2015
STIPULATION/IN-VIO
$0
Sep 29, 2015Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES NOTED: AT EXP4, CEMENT PLASTER/STUCCO IS SPALLING NEAR PARAPET WALL. RMDY: MAINTAIN EXTERIOR WALL.
#35160868P
Nov 19, 2015
STIPULATION/IN-VIO
$0
Sep 15, 2015Local Law CLASS - 2
FAILURE TO FILE AN ACCEPTABLE TECHNICAL REPORT IN COMPLIANCE W/CODE PROVISIONS:36019043Y:PERIODIC INSP OF EXTERIOR WALLS & APPUTENANCES AS REQUIRED BY ARTICLE 28.302 & THE DOB RULES & REGULATIONS.REM:FILE THE R
#36027941X
May 5, 2016
IN VIOLATION
$0
Apr 28, 2014Local Law CLASS - 2
FAILURE TO FILE AN ACCEPTABLE CYCLE 7 TECHNICAL REPORT IN COMPLIANCE WITH CODE PROVISIONS: PERIODIC INSPECTION OF EXTERIOR WALLS & APPURTENANCES AS REQUIRED BY ARTICLE 28-302 & THE DEPT OF BLDGS RULES & REGULAT
#36019043Y
Sep 4, 2014
WRITTEN OFF
$0
DOB (10)
IssuedViolationStatus
May 12, 2026CONSTRUCTION
FAILURE TO MAINTAIN BLDG IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED ON EXP 1 NORTH ELEVATION - BULGING MASONRY ON 6TH FLOOR NORTH WEST CORNER OF BLDG. EXP 4 WEST ELEVATION SPALLING STUCCO 6TH FLOOR AT NORTH WEST AND SOUTH WEST END OF EXPOSURE. REMEDY: REPAIR AND/OR REPLACE ALL DAMAG
#SR1002RF
DOB VIOLATION - ACTIVE
Mar 21, 2025CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTE AT TIME O F INSPECTION,OBSERVED MULTIPLE AREAS OF CRACKED STUCCO AT EXP4 AT VARI OUS LEVELS OF FACADE.REMEDY:REPAIR AND/OR REPLACE
#SR11003DO
DOB VIOLATION - ACTIVE
Oct 2, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION IT WAS OBSERVED AT EXPOSURE 4 (W. ELEV) (2) ARES OF SPALLING STUCCO. REMEDY: REPAIR AND/OR REPLACE
#SR11002MA
DOB VIOLATION - ACTIVE
May 16, 2024CONSTRUCTION
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED 2 AREAS OF SPALLING STUCCO ON EXPOSURE #4 REMEDY: REPAIR AND/OR REPLACE
#SR11001DO
DOB VIOLATION - ACTIVE
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#01706
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#02113
DOB VIOLATION - ACTIVE
Dec 14, 2016FACADE SAFETY PROGRAM

#HAZ86342
DOB VIOLATION - ACTIVE
Dec 14, 2016FACADE SAFETY PROGRAM

#HAZ76343
DOB VIOLATION - ACTIVE
Jan 31, 2013NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
#00770
DOB VIOLATION - ACTIVE
Jan 13, 1997LOCAL LAW 10/81 - ELEVATOR

#01486
DOB VIOLATION - ACTIVE
DOB NOW Safety (8)
IssuedViolationStatus
Oct 2, 2026Elevators FTF-VT-CAT1-CO
Violation Issued-Failure To File 2025 Cat1 Test Report
Active
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
Mar 6, 2026Energy Grade - LL33 FTP-EN-EGRDEA
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Jan 31, 2013Facades FISPNRF
FAILED TO FILE FISP CYCLE 7A TECHNICAL REPORT BY 02/21/2012
Active
HPD (31) · C 9 · B 21 · A 1
IssuedClassViolationCorrect by
Jun 1, 2026C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKSET AT BUILDING ENTRANCE DOOR , 1st STORYJun 7, 2026
Jun 1, 2026BApt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 6, 2026
Jun 1, 2026BApt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 6, 2026
Jun 1, 2026CApt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJun 27, 2026
Jun 1, 2026BApt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES IN THE PRIVATE HALLWAY LOCATED AT APT 2D, 2nd STORY, 1st APARTMENT FROM SOUTH AT WESTJul 6, 2026
May 12, 2026BApt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORYJun 16, 2026
May 12, 2026BApt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOORING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORYJun 16, 2026
May 8, 2026AApt 3B · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST, THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM WEST Aug 11, 2026
May 5, 2026B§ 27-2021 ADM CODE PROVIDE SUFFICIENT, PROPER AND SEPARATE METAL RECEPTACLES FOR THE DEPOSIT OF GARBAGE, RUBBISH AND OTHER WASTE MATERIAL AND ARRANGE FOR COLLECTION AND DISPOSAL OF SUCH MATERIAL.Jun 9, 2026
May 5, 2026B§ 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE LOOSE GARBAGE AT BASEMENTJun 9, 2026
May 4, 2026BApt 6E · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 8, 2026
May 4, 2026BApt 6E · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHJun 8, 2026
May 4, 2026CApt 3B · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; IN THE ENTIRE APARTMENT LOCATED AT APT 3B, 3rd STORY, 2nd APAMay 30, 2026
Oct 17, 2025BApt 2E · § 27-2026 ADM CODE REPLACE THE BROKEN OR DEFECTIVE WASH BASIN IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHNov 21, 2025
Sep 29, 2025CApt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHOct 25, 2025
Sep 29, 2025BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHNov 3, 2025
Sep 29, 2025CApt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHOct 5, 2025
Aug 4, 2025CApt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTAug 30, 2025
Aug 4, 2025CApt 2D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EASTAug 30, 2025
Aug 4, 2025BApt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 8, 2025
Aug 4, 2025BApt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTHSep 8, 2025
Feb 12, 2025BApt 6A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING OF 2ND WINDOW FROM NORTH AT EAST IN THE 4th ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17344773 ISSUED 13-OCT-24 HAS BEEN UPMar 19, 2025
Feb 12, 2025BApt 6A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17344772 ISSUED 13-OCT-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODEMar 19, 2025
Oct 15, 2024CApt 6A · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR LEADING TO FIRE ESCAPE WINDOW IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EASTOct 21, 2024
Jul 18, 2024BApt 6A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... EAST WALL ABOVE 2ND WINDOW FROM NORTH APPROX 5 SQ-FT IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 16753192 ISSUED 18-MAR-24 HAS BEEN UPGRADED TO CLASS Aug 22, 2024
Jun 16, 2023BApt 6A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 1 SQUARE FEET OF MOLD AT SOUTH WALL, 1 SQUARE FT OF MOLD AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6A, 6th STORY ORIGINAL VIOLATION 15728336 ISSUED 14-FEB-23 HAS BEEN UPGRADED TO CLASS B PER ADMINJul 21, 2023
Jan 18, 2022BApt 6A · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 8 SQ FT AT THE CEILING IN THE 3rd ROOM FROM NORTH LOCATED AT APT 6A, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 14551415 ISSUED 15-SEP-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-Feb 22, 2022
Aug 11, 2021CApt 3B · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 2; WG TO REPLACE = 0; WG TO REPAIR = 0; LOCATED AT APT 3B, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTSep 6, 2021
Nov 26, 2019BApt 6E · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 31, 2019
Nov 26, 2019BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL, 1st WINDOW FRAME FROM NORTH AT EAST WALL, EAST WALL, 2nd WINDOW FRAME FROM NORTH AT EAST WALL IN THE KITCHEN LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 31, 2019
Nov 14, 2019BApt 6E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 6E, 6th STORY, 1st APARTMENT FROM EAST AT SOUTHDec 19, 2019

Issued in the last 120 days

DateSourceWhatNow
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Cat1 Test ReportOpen
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 9:10 AM ET. BBL 1017260061.

Look up another building