Manhattan · Block 277 · Lot 7502 · 10002

46 Henry Street

12 floors · 32 apartments · 31,015 sq ft · built 1991 · class RM · owner of record: Bishop Paul Moore Tower

39open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2026-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 67 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 67 days
Annual
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-01-16 (Accepted). Agency page

Dec 31, 2026
in 67 days
2 of 2 without an accepted 2026 report yet
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 83 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 31,015 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 188 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 188 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $396,130 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 484 days
No Cycle 10 report on record yet
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 798 days
Next cycle year 2028

Open violations

ECB / OATH (6) · $1,250 owed
IssuedViolationHearingBalance
Apr 20, 2026Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#900590.REM:FILE ACCEPTABLE REPORT.
#37036676P
Aug 13, 2026
IN VIOLATION
$0
Jan 3, 2025Construction CLASS - 1
FAILURE TO PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNICAL REPORT #7R6-900590-9B-1 07/05/2024. NOTE: AT TIME OF ISNPECTION I OBSERVED NO SAFETY MEASURES I
#35689756K
Aug 21, 2025
IN VIOLATION
$0
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #900590. REMEDY: SUBMIT ACCEPTABLE REQU
#37027610H
Apr 17, 2025
IN VIOLATION
$1,250
Nov 20, 2018Construction CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONERS ORDER CONTAINED IN SUMMONS/ VIOLATION #3265087N ISSUED ON 1/18/18 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28.201.1 AND 1 RCNY 102-01(D)(2). AN ACCEPTABLE
#37012438N
Jun 20, 2019
ADMIT/IN-VIO
$0
Jan 18, 2018Construction CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES. AT TIMEOF INSPECTION 9 OBSRVED AN EXPOSURE #2 NORTH ELEVATION: BULGING BRICKSON BULKHEAD NORTH ELEVATION. EXP#4 SOUTH ELEVATION: CRACKS ON BALCONI
#35265087N
Mar 15, 2018
WRITTEN OFF
$0
Aug 25, 2009Construction CLASS - 1
FAIL TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY. NOTED: AT STAIRWAY C WHICH LEADS BACK INTO PUBLIC FOYER (LOBBY) FROM CELLAR,BEING USED AS GARBAGE ROOM GARBAGE BLOCKING EXIT DOOR FROM CELLAR UNABLE TO DISCHARGE OU
#34799422L
Oct 15, 2009
IN VIOLATION
$0
DOB (13)
IssuedViolationStatus
Jan 15, 2025CONSTRUCTION
PARTIAL VACATE ORDER DUE TO CONCRETE CRACK @ BEAMS SUPPORTING EXTERIOR BALACONIES @ N & W ELEV, EXP 1&4. THESE CONDITIONS HAVE THEREFORE MADE ALL BALACONIES @ N & W ELEV PLUS THE ENTIRE ROOF @ 2ND FL UNABLE TO BE OCCUPIED. REMEDY: VACATE ALL BALACONIES AT N AND W ELEV EXP 1&4 ALSO THE ENTIRE ROOF @
#FA0301SB
DOB VIOLATION - ACTIVE
Jul 5, 2024HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#911885
DOB VIOLATION - ACTIVE
Dec 1, 2023FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2300058
DOB VIOLATION - ACTIVE
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01923
DOB VIOLATION - ACTIVE
Sep 6, 2019(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST
#11184
DOB VIOLATION - ACTIVE
Jun 17, 2019ELEVATOR

#9027/656670
DOB VIOLATION - ACTIVE
Jan 26, 2018(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST
#12893
DOB VIOLATION - ACTIVE
Apr 15, 2016ELEVATOR

#9027/574302
DOB VIOLATION - ACTIVE
May 30, 2014(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION
VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2012 CAT 1 INSP/TST
#11752
DOB VIOLATION - ACTIVE
Mar 12, 2007CONSTRUCTION

#0301LS
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#02300
DOB VIOLATION - ACTIVE
Jan 6, 2006LOCAL LAW 62/91 - BOILERS

#02299
DOB VIOLATION - ACTIVE
Mar 18, 1993LOCAL LAW 62/91 - BOILERS

#07390
DOB VIOLATION - ACTIVE
DOB NOW Safety (17)
IssuedViolationStatus
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Dec 15, 2025Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device
Active
Jul 5, 2024Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Dec 1, 2023Energy Grade - LL33 FTP-EN-EGRDEA
Active
Nov 14, 2023Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Sep 6, 2019Elevators ACC1
Active
May 20, 2019Elevators EVCAT5
Active
Jan 31, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8B TECHNICAL REPORT BY 02/21/2018
Active
Jan 26, 2018Elevators ACC1
Active
May 30, 2014Elevators ACC1
Active
Jan 6, 2006Boiler LL6291
Active
Jan 6, 2006Boiler LL6291
Active
May 31, 1994Elevators LL1081
Active
Mar 18, 1993Boiler LL6291
Active
Apr 7, 1992Elevators LL1081
Active
HPD (3) · C 0 · B 3 · A 0
IssuedClassViolationCorrect by
Aug 13, 2009BSECTION 27-2050 ADM CODE PROVIDE A PIECE OF GARDEN HOSE 10 FEET IN LENGTH WITH FEMALE COUPLING AND A 10 QUART PAIL ON PREMISES TO TEST SPRINKLER SYSTEM.Sep 17, 2009
Aug 13, 2009BSECTION 27-2050 ADM CODE SEAL IN OPEN POSITION THE O.S.Y. VALVE OF THE SPRINKLER SYSTEM IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT CELLARSep 17, 2009
Aug 13, 2009BSECTION 27-2050 ADM CODE PROVIDE 3 EXTRA SPRINKLER HEADS AND SUITABLE WRENCH FOR EMERGENCY PURPOSES AT O.S.Y. VALVE OF SPRINKLER IN ACCORDANCE WITH THE RULES AND REGULATIONS OF THIS DEPARTMENT CELLARSep 17, 2009

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 8:01 AM ET. BBL 1002777502.

Look up another building