Brooklyn · Block 3664 · Lot 22 · 11207

46 Arlington Avenue

3 floors · 2 apartments · 3,360 sq ft · built 1945 · class S2 · owner of record: Germain Frantz

9open violations
$2,530ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Annual boiler inspection (4 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (4 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-13 (Accepted). Agency page

Dec 31, 2026
in 62 days
2 of 4 without an accepted 2026 report yet
Annual property registration Check
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Required only if the owner doesn't live there
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029

Open violations

ECB / OATH (3) · $2,530 owed
IssuedViolationHearingBalance
Jun 17, 2025Construction CLASS - 1
FAILURE TO COMPLY WITH TENANT PROTECTION REGULATIONS. NOTED: WORK IN PROGRESS UNDER APPLICATION # B01024095-I1-GC. TPP IS NOT BEING FOLLOWED. COMMERCIAL SPACE DOOR TO COMMON AREA OF RESIDENTIAL PART OF BUILDING
#39151351N
Feb 8, 2027
DEFAULT
$2,530
Jun 26, 2007Boilers Non-Hazardous
B4A-50ABCD.50A-NO EMERGENCE FUEL CUT OFF SWITCH TOP OF STAIRS.50B-PIP E BACK FLOW PREVENTOR DISCHARGE DOWN NO THREADED END 50C-PIPE SAFETY OR RELIEF VALVE DISCHARGE DOWN NO THREADED END.50D-NO FIX FRESH AIR
#32054171R
Sep 17, 2007
IN VIOLATION
$0
Jun 26, 2007Boilers Non-Hazardous
B4B,32A,50A,B,C,D,36,50D.50A-PIPE SAFETY OR RELIEF VALVE DOWN NO THREADED END.50B-NO EMERGENCE FUEL CUT OFF SWITCH TOP OF STAIRS. 50C-NO FITFRESH AIR FROM FROM OUT SIDE FOR THE BOILER.
#32054172Z
Sep 17, 2007
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#14928
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#19005
DOB VIOLATION - ACTIVE
Jan 1, 2009LOCAL LAW 62/91 - BOILERS

#16226
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#31690
DOB VIOLATION - ACTIVE
DOB NOW Safety (3)
IssuedViolationStatus
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Jan 1, 2009Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 4:53 AM ET. BBL 3036640022.

Look up another building