4 floors · 86 apartments · 58,000 sq ft · built 1928 · class C1 · owner of record: Skillman 47 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 64 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 64 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 80 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 58,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 185 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 185 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 308 days | Registered through 2027-09-01 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1160 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 141). Agency page | Dec 31, 2031 in 1890 days | Next due 2031 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-05-19 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 13, 2026 | A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Jan 16, 2027 |
| Oct 13, 2026 | B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY CONSISTING OF GARBAGE CANS AND RECYCLE BINS AT FIRE PASSAGE WAY | Nov 17, 2026 |
| Dec 6, 2024 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER STACK AT REAR AT FIRE ESCAPE, SECTION ''43-28'' | Mar 11, 2025 |
| Nov 19, 2024 | B | Apt 42 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 42, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Dec 24, 2024 |
| Nov 1, 2024 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Nov 5, 2024 |
| Nov 1, 2024 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Nov 5, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 13, 2026 | HPD A | §27-2104(B) HMC POST A PROPER NOTICE REGARDING RENT STABILIZATION LAW, IN A FORM APPROVED BY THE COMMISSIONER, IN A CONSPICUOUS LOCATION WITHIN THE COMMON AREA AT THE BUILDINGS ENTRANCE. FOR MORE INFORMATION ABOUT SIGNAGE REQUIREMENTS, PLEASE VISIT: HTTPS://WWW.NYC.GOV/SITE/HPD/SERVICES-AND-INFORMA | Open |
| Oct 13, 2026 | HPD B | § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE THE OBSTRUCTION IN FIREPROOF PASSAGEWAY CONSISTING OF GARBAGE CANS AND RECYCLE BINS AT FIRE PASSAGE WAY | Open |