1 floors · 4,225 sq ft · built 1931 · class Z9 · owner of record: 35 Realty Patrick Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 56 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1152 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 10, 2026 | Construction CLASS - 1 OBSERVED NEW LARGE STRUCTURE ERECTED APPROXIMATELY 35FT IN DEBT X 30FT IN HEIGHT X 60FT IN LENGTH AT REAR OF PROPERTY AT CORNERS OF EXPOSURE 3 AND 4. STRUCTURE IS MADE OUT OF STEEL COLUMNS WITH SOLID STEEL TRUS #39176794N | Jul 29, 2027 DEFAULT | $12,500 |
| Feb 10, 2026 | Construction CLASS - 1 OBSERVED CONCRETE WALLS AT BOTH SIDE OF BUILDING WITH VERTICAL CRACKS AT VARIOUS LOCATIONS ON METROPOLITAN AVE AND ONBERDONK AVE, REPAIR AND/REPLACE #39176795P | Sep 8, 2026 ADMIT/IN-VIO | $0 |
| Feb 19, 2008 | Zoning Non-Hazardous ILLEGAL USE IN MANUFACTURING DISTRICT. NOTED: 2 STORY STRUCTURE AT FRONT OF LOT, 2ND FLR HAS A KITCHEN WITH ELECTRIC STOVE 7 MICROWAVE AND 3PC BATH (SINK,TOILET,SHOWER) IN AN M3-1 ZONING DISTRICT. REMEDY: DISCO #34627885R | Jun 22, 2010 IN VIOLATION | $0 |
| Feb 19, 2008 | Unknown Non-Hazardous PLUMBING WORK W/O A PERMIT. WORK NOTED: 2 STORY STRUCTURE AT FRONT OF LOT, 2ND FLR INSTALLED WATER & WASTE LINES FOR A 3PC BATH (SINK,TOILET,SHOWER) & RESIDENTIAL SINK IN AN M3-1 ZONING DISTRICT. REMEDY: OBTAIN #34627884P | Jun 22, 2010 IN VIOLATION | $0 |
| Feb 19, 2008 | Unknown Non-Hazardous OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY #Q10082. ILLEGAL OCCUPANCY NOTED: LEGAL JUNK YARD NOW CONVERTED TO AN ILLEGAL 2 STORY STRUCTURE WITH 2ND FLR WITH 3 OFFICES, KITCHEN & 3PC BATH #34627883N | Jun 22, 2010 IN VIOLATION | $0 |
| Feb 19, 2008 | Administrative Non-Hazardous FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION FOR NOV#34305281Y. NOTED: WORK W/O A PERMIT. ERECTED 2 STORY BLOCK STRUCTURE AT FRONT OF LOT ON METROPOLITAN AVE USED AS A BUS #34627880H | Jun 22, 2010 IN VIOLATION | $0 |
| Jun 26, 2007 | Administrative Non-Hazardous FAILURE TO COMPLY W/ THE DOB COMMISSIONER'S ORDER TO CERTIFY CORRECTI ON FOR NOTICE OF VIOLATION #34305281Y.CONDITIONS REMAIN THE SAME. REMEDY:CORRECT VIOLATING CONDITION CERTIFY CORRECTION. #34574993H | Feb 5, 2008 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 19, 2001 | CONSTRUCTION #ZSTF01PM | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 5, 2026, 7:09 PM ET. BBL 4033930001.