2 floors · 4 apartments · 1,628 sq ft · built 1931 · class C3 · owner of record: Rodriguez, Erika
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 290 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 14, 2022 | Construction CLASS - 3 FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT REAR OF PROPERTY NOTED SECTION OF DOWNSPOUT AT ATTIC ELEVATION IS MISSING WHICH PREVENTS WATER FROM FLOWING TO GUTTER., REPAIR AND OR REPLACE #39065829M | Sep 2, 2022 DEFAULT | $500 |
| Jun 10, 2022 | Construction CLASS - 1 OBSERVED CEILING CONCRETE DISREPAIR CONDITIONS WITH CRACKS, SPALLING, EXPOSED REINFORCEMENT ON REAR SIDE OF BASEMENT AND SPALLING STUCCO OVER DRIVEWAY. ALSO OBSERVED APPROX. 3'-0" HIGH CINDER BLOCK RETAINING WA #39063889P | Jul 29, 2022 DEFAULT | $3,125 |
| Issued | Violation | Status |
|---|---|---|
| Jun 10, 2022 | CONSTRUCTION OBSERVED CEILING CONCRETE DISREPAIR CONDITIONS WITH CRACKS, SPALLING, EXPOSED REINFORCEMENT ON REAR SIDE OF BASEMENT AND SPALLING STUCCO OVER DRIVEWAY. ALSO OBSERVED APPROX. 3'-0" HIGH CINDER BLOCK RETAINING WALL STEP CRACK & LEANING AT EXPO # 02. #22-01783 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 10) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Feb 7, 2022 | B | Apt 2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX (5) SQ. FT. AT CEILING IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH ORIGINAL VIOLATION 14599736 ISSUED 30-SEP-21 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE §27-2017.3 | Mar 14, 2022 |
| Oct 8, 2021 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 11, 2022 |
| Oct 8, 2021 | C | Apt 2 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEEDING 130 DEGREES IN THE KITCHEN LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 14, 2021 |
| Oct 5, 2021 | C | Apt 2 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 31, 2021 |
| Oct 5, 2021 | A | Apt 2 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT 1st DOOR FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Jan 8, 2022 |
| Oct 5, 2021 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2, 1st ST | Oct 29, 2021 |
| Oct 5, 2021 | C | Apt 2 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 2, 1st ST | Oct 29, 2021 |
| Oct 5, 2021 | C | Apt 2 · § 27-2005, 2007, 204.1 HMC CODE: ARRANGE AND MAKE SELF-CLOSING THE DOORS , IN THE ENTRANCE LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 31, 2021 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 11:36 PM ET. BBL 2055760078.