Brooklyn · Block 5211 · Lot 7501 · 11226

458 East 25th Street

6 floors · 37 apartments · 22,688 sq ft · built 2021 · class RM · owner of record: The 458 East 25th Street Condomiinium

2open violations
$4,875ECB/OATH penalties owed
0HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 17 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027

Open violations

ECB / OATH (5) · $4,875 owed
IssuedViolationHearingBalance
Aug 28, 2021Construction CLASS - 1
BC3303.4.7 FAILURE TO MAINTAIN SAFETY MEASURE/SOLID FENCE OR BARRIER@STORAGE AREA ON NEAR WALKWAY.NOTE:ATO MY INSP OF 6STYBLDG@ROOF LEVEL UNDER CONST,I OBSERVED STORAGE AREA PROVIDED ON ST IN FRONT OF BLDG NEAR
#35506253Y
Jan 5, 2022
IN VIOLATION
$2,500
Aug 28, 2021Construction CLASS - 1
BC3307.7 FAILURE TO MAINTAIN JOBSITE FENCE CONST.NOTE@TIME OF MY INSP OF 6STYBLDG@ROOF LEVEL UNDER CONST.I OBSERVED JOBSITE FENCE GATE NOT FULLY CLOSED OPEN AREA.APPROX 18" PUBLIC ACCESSIBLE AREA CREATED VERY D
#35506254X
Jan 5, 2022
IN VIOLATION
$500
Aug 28, 2021Construction CLASS - 2
FAILURE TO SAFEGUARD ALL PERSONS&PROPERTY AFFECTED BY CONST-CONST DEBRIS FALLING TO ADJ PROPTERY-ST.NOTE:ATO MY INSP OF 6STYNB@ROOF LEVEL UNDER CONST.I OBSERVED EXTERIOR WORKING ACTIVITY W/CONST STYROFOAM@EXP4.
#35506252M
Jan 5, 2022
IN VIOLATION
$625
Jun 8, 2021Construction CLASS - 1
FAILURE TO MAINTAIN HOUSEKEEPING PER SECTION REQUIREMENTS.NOTE AT THE TIME OF MY INSPECTION OF A 5 STORY BUILDING WITH CONSTRUCTION WORK IN PROGRESS THAT CONSIST OF FRAMING AND ELECTRICAL WORK.I OBSERVED ON MUL
#35559223M
Dec 20, 2021
IN VIOLATION
$625
Jun 8, 2021Construction CLASS - 1
3308 VERTICAL NETTING.NOTE AT THE TIME OF INSPECTION OF A 6 STORY BUILDING WITH CONSTRUCTION WORK IN PROGRESS CONSISTING OF FRAMING AND ELECTRICAL WORK.I OBSERVED ON FLOORS 3,4,& 5 MISSING GUARDRAILS OPEN IN VE
#35559224Y
Dec 20, 2021
IN VIOLATION
$625
DOB (1)
IssuedViolationStatus
Nov 11, 2026CONSTRUCTION
STRUCTURE RENDERED NON-COMPLIANT. PARTIAL VACATE OF REAR YARD DUE TO BEING IN A POTENTIAL COLLAPSE ZONE OF CONSTRUCTION SITE 2625 BEDFORD AVE. UNSAFE CONSTRUCTION AT 2625 BEDFORD AVE HAS LED TO ADJACENT BUILDING 1321 FLATBUSH AVE COLLAPSE COMPROMISING STABILITY OF REAR YARD.
#26-02556
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 25, 2026Benchmarking - LL84 DQ-EN-BENCH
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Nov 11, 2026DOBCONSTRUCTION: STRUCTURE RENDERED NON-COMPLIANT. PARTIAL VACATE OF REAR YARD DUE TO BEING IN A POTENTIAL COLLAPSE ZONE OF CONSTRUCTION SITE 2625 BEDFORD AVE. UNSAFE CONSTRUCTION AT 2625 BEDFORD AVE HAS LED TO ADJACENT BUILDING 1321 FLATBUSH AVE COLLAPSE COMPROMISING STABILITY OF REAR YARD.Open
Sep 25, 2026DOB SafetyBenchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4Open
Sep 23, 2026DOB SafetyParking Structures: Failure to file parking structures compliance report by 12/31/2025 as required per 1 RCNY 103-13Closed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 7:47 PM ET. BBL 3052117501.

Look up another building