Manhattan · Block 1841 · Lot 7503 · 10025

455 Central Park West

25 floors · 100 apartments · 214,360 sq ft · built 2002 · class R4 · owner of record: Unavailable Owner

18open violations
$37,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
62dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 62 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 62 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 78 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 214,360 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 183 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 183 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 306 days
Registered through 2027-09-01
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $99,000 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2029
in 845 days
Filing window not open yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1158 days
Next cycle year 2029
Energy audit and retro-commissioning (2031) Likely applies
Local Law 87 · Calendar year 2031
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1841). Agency page

Dec 31, 2031
in 1888 days
Next due 2031
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $37,500 owed
IssuedViolationHearingBalance
Jun 3, 2026Unknown CLASS - 1
FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THE BUILDING'S STRUCTURE AND APPURTENANCES CONFORM TO PROVISIONS OF THE ADMIN CODE AFTER UNSAFE NOTIFICATION BY QPSI. AT TIME OF INSPECTION ON AN ACTIVE PARKING STRUC
#35729845X
Jun 24, 2027
DEFAULT
$25,000
Nov 5, 2025Unknown CLASS - 1
FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THE BUILDING'S STRUCTURE AND APPURTENANCES CONFORM TO THE PROVISIONS OF THE ADMIN CODE AFTER UNSAFE NOTIFICATION FILED BY QPSI. AS NOTED:-AT THE TIME OF INSPECTION ON
#35718563Y
Apr 5, 2027
PENDING
$10,000
Mar 28, 2024Construction CLASS - 1
28-323.8 AND RCNY 103-13(5)FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKETHE BUILDING STRUCTURE AND APPURTENANCES CONFORM TO THE PREVIOUS OF THE ADMIN CODE AFTER UNSAFE NOTIFICATION FILED BY PQSI#CR-0003607 DATED
#35682444J
Jun 6, 2024
ADMIT/IN-VIO
$0
Mar 28, 2024Construction CLASS - 1
28-323.1 FAILURE TO MAINTAIN PARKING STRUCTURE IN SAFE CONDITION.AS NOTED:ON AN PARKING STRUCTURE CONSISTING OF 3 LEVEL AT GC,CELLAR AND SUBCELLAR BELOW 26 FL BUILDING OBSERVED AT CELLAR AND SUB CELLAR LEVEL CE
#35682443H
Jun 6, 2024
ADMIT/IN-VIO
$0
Oct 4, 2023Cranes and Derricks CLASS - 2
AT TIME OF INSPECTION OF 25 STORY RESIDENTIAL BUILDING OBSERVED SUSPENDED SCAFFOLDING EQUIPMENT IN PLACE WITHOUT VALID NOTIFICATION IN SYSTEM. STOP ALL USE OF SUSPENDED EQUIPMENT/INSTALLATION PROVIDE NOTIFICATI
#39522328P
Dec 14, 2023
IN VIOLATION
$2,500
DOB (1)
IssuedViolationStatus
Mar 28, 2024CONSTRUCTION
EMERCENCY WORK ORDER;CELLAR,SUB CELLAR LEVEL CRACK ON CEILING/SPALLING CONCRETE/EXPOSE REBAR VISIBLE WATER PENETRATION SEVERAL LOC.IMMED.HAZ REMEDY:RETAIN NYS REG.DESIGN PROF.TO DIRECT&SUPERV.INSTALLATION OF SAFETY MEASURES.ALL WORK TO BE CONDUCTED UNDER FULL SUPERV.OF NYS RDP .PROVIDE PROGRESS REOR
#LL10701MK
DOB VIOLATION - ACTIVE
DOB NOW Safety (13)
IssuedViolationStatus
Oct 7, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 2, 2026Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2025 Periodic Inspection Report
Active
Mar 17, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Oct 10, 2025Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction
Active
Aug 29, 2025Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2024 Periodic Inspection Report
Active
Dec 31, 2024Parking Structures FTC-PS-UNSAFE
Unsafe report of parking structures filed.
Active
Sep 11, 2024Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Report
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction
Active
Aug 25, 2023Elevators FTF-VT-PER-CO
Violation Issued-Failure To File 2022 Periodic Inspection Report
Active
Apr 30, 2019Facades FISPNRF
FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 7, 2026DOB SafetyAEUHAZ: Open
Oct 2, 2026DOB SafetyElevators: Violation Issued-Failure To File 2025 Periodic Inspection ReportOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 30, 2026, 10:40 AM ET. BBL 1018417503.