Brooklyn · Block 1009 · Lot 8 · 11215

455 3 Avenue

1 floors · 760 sq ft · built 1920 · class G1 · owner of record: 198th 9th Street Realty Llc

18open violations
$12,500ECB/OATH penalties owed
5HPD class C (immediately hazardous)
66dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 66 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 66 days
Keep the report on file (not filed with DOB)

Open violations

ECB / OATH (3) · $12,500 owed
IssuedViolationHearingBalance
Feb 4, 2025Construction CLASS - 1
2022 BC 1803.6. THE RESPONDENT'S, ENGINEER OF RECORD'S, UNDERPINNING DESIGN DOES NOT MEET THE REQUIRED MINIMUM FACTOR OF SAFETY AGAINST OVERTURNING, POSING A POTENTIAL STRUCTURAL RISK. CALCULATIONS PROVIDED BY
#35650479N
Apr 27, 2026
DEFAULT
$6,250
Feb 4, 2025Construction CLASS - 1
2022 BC 1803.6. THE RESPONDENT IS THE ENGINEER RESPONSIBLE FOR THE TR4, GEOTECHNICAL INVESTIGATION. 2022 BC1803.6.1 MANDATES THAT THE ENGINEER RESPONSIBLE FOR THE GEOTECHNICAL INVESTIGATION PREPARE A GEOTECHNIC
#35650476H
Apr 27, 2026
DEFAULT
$6,250
Sep 2, 2023Construction CLASS - 1
AT TIME OF INSPECTION, OBSERVED JOBSITE AT EXCAVATION PHASE. UPON REVIEW OF DOB NOW, I DISCOVERED THAT THERE WAS NO NOTIFICATION FOR EXCAVATION UNDER THIS PERMIT. STOP ALL WORK UNDER PERMIT B00811972COMPLY W/C
#39521328K
May 13, 2024
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Feb 4, 2025CONSTRUCTION
REVISE & UPDATE DRAWINGS,JOB # B00811972,PER GEOTECHNICAL PEER REVIEW, (PERF BY FNA ENG).SECTIONS VIOLATD BC 1818.6 & BC 1818.6.3 REMEDY: PROVIDE REVISD DRWG SET ADDRESSING THE CODE NON-COMPLIANCES & RECOMENDATIONS BY THE GEOTECHNICAL PEER REVIEWER BY 3/5/25
#CE30601AD
DOB VIOLATION - ACTIVE
Feb 4, 2025CONSTRUCTION
REVISE & UPDATE DRAWINGS,JOB # B00811972, PER GEOTECHNICAL PEER REVIEW (PERF BY FNA ENG).SECTIONS VIOLATD BC 1818.6 & BC 1818.6.3 REMEDY: PROVIDE REVISED DRWG SET ADDRESSING THE CODE NON-COMPLIANCES & RECOMMENDATIONS BY THE GEOTECHNICAL PEER REVIEWER BY 3/5/25
#CE30602AD
DOB VIOLATION - ACTIVE
Mar 20, 2024CONSTRUCTION
PLEASE REFER TO COMMISSIONER'S ORDER LETTER, 3/20/24,REQUESTING A PEER REVIEW FOR JOB # B00811972. SECTIONS VIOLATED:AC 28-104.7.11& 2022 BC 1818. REMEDY: PROVIDE POTENTIAL SELECTIONS BY 03/27/24. SUBMIT PEER REVIEW BY 04/26/ 24 TO DOB CSE
#CE30601AD
DOB VIOLATION - ACTIVE
Nov 29, 2023FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00044
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Oct 31, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle C (premises is in Community District 6)
Active
Nov 29, 2023AEUHAZ FTC-AEU-HAZ
Active
HPD (11) · C 5 · B 3 · A 3
IssuedClassViolationCorrect by
Jun 18, 2008ASECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING OF FRONT EAST ROOM - 3RD STY. APTSep 21, 2008
Jun 18, 2008CSECTION 27-2024 ADMIN. CODE: PROVIDE ADEQUATE SUPPLY OF HOT WATER FOR THE FIXTURES ALL FIXTURES AT BATHROOM & KITCHEN.Jun 24, 2008
Jun 18, 2008CSECTION 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS REAR FIRE ESCAPE OUT OF GLIDES.Jun 24, 2008
Jun 18, 2008BSECTION 27-2005,2007 ADMIN. CODE AND DEPARTMENT RULES AND REGULATIONS: REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES REAR YARD CLOTHES LINES AT DROP LADDER.Jul 23, 2008
Jun 18, 2008BSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM 2ND STORY APARTMENT 1 ER1.Jul 23, 2008
Jun 18, 2008CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM, 2ND STORY APARTMENT 1.Jun 24, 2008
Jun 18, 2008CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES KITCHEN AND BATHROOM 2ND STORY APARTMENT #1,Jun 24, 2008
Jun 18, 2008ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING & WALL, KITCHEN 2ND STORY APARTMENT 1.Sep 21, 2008
Jun 18, 2008ASECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND WALL REAR ROOM, 2ND STORY APARTMENT # 1.Sep 21, 2008
Jun 18, 2008BSECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURE & MAKE OPERABLE, 2ND STORY APARTMENT 1.Jul 23, 2008
Jun 18, 2008CSECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES BATHROOM & KITCHEN, 2ND STORY APT.Jun 24, 2008

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 26, 2026, 6:06 PM ET. BBL 3010090008.

Look up another building