4 floors · 5 apartments · 3,307 sq ft · built 1910 · class C2 · owner of record: Yuppie Puppy Realty, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 47 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 17, 2019 | Construction CLASS - 2 WORK WITHOUT A PERMIT. AT TIME OF INSPECTION, WORK IN PROGRESS AT THE CELLAR LEVEL. AT TIME OF INSPECTION, OBSERVED ROUGH PLUMBING WORK BEING DONE IN THE COVE ADJACENT TO THE BATHROOM, NEW SHOWER SYSTEM INSTALL #39014461N | Nov 12, 2020 IN VIOLATION | $0 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 4, 2020 | B | Apt 4B · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... (2 SQ. FT.) AT WOOD FLOOR AND (2 SQ. FT.) AT NORTH WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 13686044 ISSUED 05-JUL-20 HAS BEEN UPGRADED TO CLA | Dec 9, 2020 |
| May 24, 2019 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, 2ND STORY AT PUBLIC HALL | Aug 27, 2019 |
| May 24, 2019 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS, 3RD STORY AT PUBLIC HALL | Aug 27, 2019 |
| May 24, 2019 | B | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF CONSTRUCTION MATERIAL, 1ST STORY AT PUBLIC HALL | Jun 28, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 6:24 AM ET. BBL 1010660102.