29 floors · 616,352 sq ft · built 1902 · class O4 · owner of record: 452 Fifth Owners Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 616,352 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 846 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 841). Agency page | Dec 31, 2031 in 1889 days | Next due 2031 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 17, 2026 | Unknown CLASS - 2 DURING THE INSPECTION OF THE ALTERATION WORK AT THE 29-STORY BUILDING, FLOOR OPENINGS AND A WORK PLATFORM WERE OBSERVED AT THE 2ND FLOOR WITH GUARDRAILS INSTALLED BUT WITHOUT THE REQUIRED TOE BOARDS. THIS CONDI #39553135K | Jan 4, 2027 DEFAULT | $10,000 |
| Apr 17, 2026 | Unknown CLASS - 2 DURING THE INSPECTION OF THE ALTERATION WORK AT THE 29-STORY BUILDING, FLOOR OPENINGS AND A WORK PLATFORM WERE OBSERVED AT THE 2ND FLOOR WITH GUARDRAILS INSTALLED BUT WITHOUT THE REQUIRED SAFETY NETTING. THIS C #39553134Z | Jan 4, 2027 DEFAULT | $25,000 |
| Mar 14, 2026 | Construction CLASS - 2 OBS MAKE-SHIFT PLATFORMS ,LOGS SHORING THROUGHOUT FLOORS TO SECURE EXISTING STRUCTURAL UNDER PARTIAL DEMOLITION WITHOUT APPROVED PLANS,PE SHOP DRAWINGS.FAILURE TO PROVIDE APPROVED PLANS /OR PE REVISED DRAWINGS #39551886M | May 21, 2026 ADMIT/IN-VIO | $0 |
| Mar 14, 2026 | Construction CLASS - 2 WORK AFTER HOURS WITHOUT A VARIANCE PERMIT CONTRARY TO 28-105.12.5. OBSERVED ACTIVE ALT/DEMO OPERATIONS FOR THE 1ST FLOOR COMMERCIAL SPACE WORK, WITH APPROXIMATE 20 WORKERS BURNING CUTTING STRIPPING FLOOR DEMO #39551899L | May 20, 2027 DEFAULT | $1,280 |
| Feb 26, 2026 | Construction CLASS - 2 3301.5 AT TIME OF INSPECTION RESPONSE TO AN INCIDENT WHERE A WORKER TRIPPED AND FELL ON 11TH FLOOR INJURED HIS KNEE AND BACK AMBULANCE WAS CALLED, INSPECTION REVEAL SEVERAL EXPOSED OPEN DRAIN HOLES ON THE FLOOR #39550988Z | May 7, 2026 ADMIT/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Dec 1, 2024 | FAILURE TO POST ENERGY GRADE/SCORE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 #2400198 | DOB VIOLATION - ACTIVE |
| Sep 29, 2006 | ELEVATOR #175261/9444 | DOB VIOLATION - ACTIVE |
| Mar 22, 2005 | ELEVATOR #9444/124401 | DOB VIOLATION - ACTIVE |
| Mar 22, 2005 | ELEVATOR #9444/124825 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Oct 2, 2026 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2025 Periodic Inspection Report | Active |
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Oct 10, 2025 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Affirmation of Correction | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Dec 1, 2024 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 11, 2024 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Oct 2, 2023 | Elevators FTC-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Open |
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 9:59 PM ET. BBL 1008410049.