2 floors · 1 apartments · 2,959 sq ft · built 1922 · class K4 · owner of record: Land 4510 Realty Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 303 days | Required only if the owner doesn't live there |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 424 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-09 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 22, 2020 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED PLANS AND AS AMENDMENTS NOTE AT THE TIME OF INSPECTION OF 2 STORY ALTERATIONCONSTRUCTION SITE UPON REVIEW OF PLANS THAT ALTERATION CONSTRUCTION SITE UPON REVIEW OF PLANS THAT #35509981X | Feb 3, 2021 STIPULATION/IN-VIO | $0 |
| Aug 24, 2020 | Construction CLASS - 2 FAILURE OF PERMIT HOLDER TO PROVIDE INSPECTION ACEESS TO AND/OR EXPOSE ONGOING CONSTRUCTION OR WORK ON AN ACTIVE AND PERMITTED WORKSITE.AIOI OBSERVED WORK BEING CONDUCTED INSIDE JOB SITE.I HEARD PULLING OF ELEC #35494531J | Jan 6, 2021 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION #01272 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION #00451 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION #00476 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | HIGH PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION #01354 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #30657 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler HBLVIO VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE MISSING GLASS AT VESTIBULE DOOR | Sep 8, 2009 |
| Aug 4, 2009 | B | Apt 2FL · SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF NO ELECTRIC SERVICE AT FIXTURE EAST APT; IN THE ENTIRE APARTMENT LOCATED AT APT 2FL, 2nd STORY | Sep 8, 2009 |
| Aug 4, 2009 | C | Apt 2R · SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2R, 2nd STORY | Aug 10, 2009 |
| Aug 4, 2009 | C | Apt 2 · SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE LOCK INSTALLED AT BUILDING ENTRANCE DOOR FROM STREET TO VESTIBULE | Aug 10, 2009 |
| Aug 4, 2009 | B | SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE SCUTTLE LADDER TO ROOF | Sep 8, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE WOOD TREAD 5TH UP FROM 1ST STY PUBLIC HALL AT PUBLIC HALL STAIRS | Aug 10, 2009 |
| Aug 4, 2009 | C | Apt 2 · SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE KITCHEN LOCATED AT APT 2, 2nd STORY | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. REPLACE WITH NEW THE BROKEN, DEFECTIVE AND/OR MISSING SCUTTLE LADDER AT PUBLIC HALL, 2nd STORY | Aug 10, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF DOUBLE CYLINDER KEY OPERATIVE LOCK INSTALLED ATSTREET ENTRANCE DOOR , 1st STORY | Aug 10, 2009 |
| Aug 4, 2009 | B | Apt 1 · SECTION 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXIGLASS DOOR IN THE ENTRANCE LOCATED AT APT 1, 2nd STORY | Sep 8, 2009 |
| Aug 4, 2009 | C | SECTION 27-2005 ADMIN. CODE: REMOVE THE ILLEGAL FASTENING DOUBLE CYLINDER KEY OPERATED LOCK INSTALLED AT ENTRANCE DOOR TO BLDG AT PUBLIC HALL, 1st STORY | Aug 10, 2009 |
| Aug 4, 2009 | A | SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WALLS AT PUBLIC HALL, 2nd STORY | Nov 7, 2009 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 10:28 PM ET. BBL 3056140027.