12 floors · 172,831 sq ft · built 1912 · class O6 · owner of record: 460 Park Avenue South Associates Llc

19open violations
$8,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
163dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 42 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 172,831 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 163 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 163 days
Annual filing
Facade inspection report (Cycle 10B) Applies
Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. DOB facade records for this building show $352,800 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2028
in 459 days
No Cycle 10 report on record yet
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1138 days
Next cycle year 2029
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 860). Agency page

Dec 31, 2030
in 1503 days
Next due 2030
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-23 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (4) · $8,750 owed
IssuedViolationHearingBalance
May 13, 2026Elevators CLASS - 1
CLASS 1(CU):FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-987. UPON INSPECTION,DEVICE IS FOUND TO BE OUT OF SERVICE DUE TO FAULTY LEVELING DEVICE ON ELEVA
#39188541N
Jul 23, 2026
IN VIOLATION
$1,250
Apr 11, 2024Local Law CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9B REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL AND APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #902429. REMEDY: SUBMIT ACCEPTABLE REQU
#37027663L
Mar 20, 2025
IN VIOLATION
$1,250
Jan 16, 2024Local Law CLASS - 2
FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9B REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL#902428.REM:FILE ACCEPTABLE REPORT.
#37026487R
Apr 25, 2024
IN VIOLATION
$1,250
Dec 5, 2023Unknown CLASS - 1
3314.8.2 AT TIME OF INSPECTION ON A 12 STORY FACADE OPERATION JOB SITE OBSERVED THE PIPE SCAFFOLD DEBRIS NETTING IS NOT SECURE TO THE SCAFFOLD NETTING SHALL BE SECURELY ATTACHED TO THE SCAFFOLD AND SHALL ENCLO
#39523847L
Feb 8, 2024
IN VIOLATION
$5,000
DOB (6)
IssuedViolationStatus
Feb 22, 2023NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
#01347
DOB VIOLATION - ACTIVE
Nov 9, 2021FAILURE TO CORRECT SWARMP CONDITIONS (FACADE)
CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
#00126
DOB VIOLATION - ACTIVE
Nov 9, 2021HAZARDOUS CONDITION (FACADE)
CYCLE 9B UNSAFE REPORT FILED
#909508
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00886
DOB VIOLATION - ACTIVE
Dec 28, 1988ELEVATOR
(21 & 24) RESHACKLE (51) PROPERLY TAG GOVERNOR TO SHOW 5YR SAFETY TESTS
#1156A/04
DOB VIOLATION - ACTIVE
May 6, 1988ELEVATOR

#1322161
DOB VIOLATION - ACTIVE
DOB NOW Safety (12)
IssuedViolationStatus
Jul 30, 2026AEUHAZ FTC-AEU-HAZ
Active
Oct 11, 2024Elevators FTC-VT-PER-CO
Violation Issued-Failure To File 2023 Periodic Inspection Affirmation of Correction
Active
Oct 11, 2024Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2023 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Oct 23, 2023Elevators FTC-VT-CAT1-CO
Violation Issued-Failure To File 2019 Cat1 Test Affirmation of Correction
Active
Feb 22, 2023Facades FISPNRF
CYCLE 9B NO REPORT FILED
Active
Nov 9, 2021Facades FISPHAZ
CYCLE 9B UNSAFE REPORT FILED
Active
Nov 9, 2021Facades FISPFCS
CYCLE 9B FAILURE TO CORRECT SWARMP CONDITIONS
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Jul 30, 2026DOB SafetyAEUHAZ: Open

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 19, 2026, 12:17 AM ET. BBL 1008600045.

Look up another building